900mm
Island Canopy
Manual
MODEL
ICF9BLS
Installation and Operation
Dear Customer,
We thank you for choosing this quality appliance and hope you enjoy many
years of reliable service.
Please ensure this manual is read carefully before installation and use. Keep
this manual in a safe and accessible location should future reference be
required.
Regards
Home Appliances
CONTENT
2……………………………………….Notice
3……………………………………….Feature
4………………………………………..Installation
6………………………………………..Notice of installation
6………………………………………..Safety Warning
7…………………………………………Use
8…………………………………………Maintenance
9…………………………………………Abnormity and Solution
1
NOTICE
1. Thank you for choosing our cooker hood. Please read the
instruction manual carefully before use.
2. The installation work must be undertaken by a qualified and
competent fitter.
3. The manufacturer disclaims all liability for any damage or
injury caused as a result of not following instructions for
installation contained in the following text.
The cooker hood is used on 220/240v, 50Hz.
2
(2)FEATURE
1. The cooker hood uses high quality materials, and is made with a
streamlined design.
2. Equipped with a large power low noise electric motor and
centrifugal leaf, it produces strong suction, low noise, non stick
grease filter and easy to clean.
3. Special wind tunnel construction and oil collector design, free
dirt will be absorbed in a second.
3
(3) INSTALLATION
1. The ceiling must can bear at least 40kgs weight, and the
thickness of the ceiling must be 30MM, see pic 2, drill
1*170mm round hole in the ceiling.
2. According to the hanging board, drill 12 holes in the ceiling, see
pic 2, 12pcs of ST6*40mm big flat screws will be used to fix the
hanging board on the ceiling, and then 8pcs of M4*10 screws
and M4 nut with gasket will be used to connect the angle iron
into the hanging board, see pic 1, calculated the length of the
angle iron, and 16pcs M4*10 big flat screws and M4 nut with
gasket will be used to connect the angle iron and another angle
iron ( the overlap length of angle iron can not less 100MM)
3. Let the one side of the extensible pipe go outside through the
hole of 170MM, see pic 3.
4. 4pcs ST4*8 big flat screws will be used to connect the internal
chimney into the hanging board, then put one the external
chimney, two hooks will be used to put up the external chimney
in order to the next installation, see pic 4.
5. 4pcs ST4*8 big flat screws will be used to install the outlet, see
pic 5.
6. Hold up the hood, 16pcs M4*10 big flat screws will be used to
connect the hood body into angle iron, see pic 6.
7. Put the extensible pipe on the outlet; after ensure all the things
ok, put down the hook, take from the external chimney, all the
installation is finished, see pic7& 8.
Warning: Failure to install the screws or fixing device in accordance with these
instructions may result in electrical hazards
4