Escea DX1500, DX1000 User Manual

Page 1
Installation / Service Guide
DX1000 / DX1500
For the latest documentation, visit www.escea.com
Gas Fireplaces
630228_18
Page 2
Important:
The appliance shall be installed in accordance with;
• This installation instruction booklet
• Municipal building codes
• Electrical wiring regulations
• Any other relevant statutory regulations.
• AS/NZS 5601.1 Gas Installations
This appliance is not intended for use by young children or inrm persons unless they have been adequately supervised by a responsible person to ensure that they can use the appliance safely.
Young children should be supervised to ensure that they do not play with the appliance.
Manufactured by: Escea Ltd, PO Box 5277 Dunedin NZ, Ph: +64 3 478 8220 For contact details of your local Escea distributor or dealer please visit: www.escea.com [email protected]
WARNING:
Failure to follow these instructions could cause a malfunction of this appliance, which could result in death, serious bodily injury, and/or property damage. Failure to follow these instructions may also void your re insurance and/or warranty.
This appliance must not be modied.
THIS APPLIANCE MUST BE FITTED WITH AN ESCEA REMOTE ROOM AIR FAN AND SUITABLE RETURN AIR VENTILATION
THIS APPLIANCE MUST BE FITTED WITH AN ESCEA REMOTE FLUE FAN
THE TERMINAL MUST ALWAYS VENT DIRECTLY OUTDOORS
Who can install this product:
Installation must be carried out by a qualied and registered installer who, on completion of the installation, must issue a: AUS: Certicate of Compliance NZ: Energy Work Certicate in accordance with national and/or local codes. If these are not issued then the Escea war­ranty may be void.
Page 3
Warranty Repair and Annual Servicing:
Warranty repair work must be carried out by a recognised Escea gas replace technician. It is recommended that recognised Escea Gas Fireplace Technicians are also used to carry out annual servicing requirements (particularly during the warranty period). For contact details of authorised Escea Gas Fireplace Technicians in your area, please contact the retailer from whom the appliance was purchased.
General installation information:
This appliance must be installed according to these instructions and in compliance with all relevant building, gas tting, electrical and other statutory regulations (eg. AS/NZS
5601.1). Any shortcomings in the appliance and ue installation will be the responsibility of the installer, and Escea will not be accountable for any such failings or their conse­quences. Once this appliance is installed it cannot be removed without disturbing the wall lining.
This DX Series replaces has been dispatched from the factory set as a single sided ver­sion. This can be converted into a double sided appliance by using the Double Sided Conversion Kit available from your Escea distributor. Conversion details are shown in Section E.
An electrician is required to install a 3pin power socket – Section C
Page 4
A Installation Process and Product Description 6
A1 Recommended Installation Process: 6
A2 Product Description 6
A3 Product Dimensions 7
B Creating the Cavity 8
B1 Cavity Shape 8
B2 Designing the Cavity 8
B3 Flue Conguration (For less than 4m length) 9
B4 Flue Conguration (For more than 4m length) 10
B5 Framing Dimensions 11
B6 Cavity Base 11
B7 Hearth 11
B8 Wall Linings 11
B9 Fascia 12
B10 Mantle Clearance 12
B11 Television Clearances 12
B12 Ducting 13
B13 Duct Fan mounting 14
C Installing the Electricity and Gas to the Appliance 15
C1 Power Supply 15
C2 Network Cable 15
C3 Gas Pipe Sizing 16
C4 Gas Pipe Position 16
C5 Gas Isolating Valve 16
D Installing the Flue 17
D1 Installing the Horizontal Powerue Wall Terminal option 17
D2 Installing the Internal Vertical Powerue (Duravent) 18
D3 Installing the Universal Vertical Powerue (Internal Install) 19
D4 Installing an External Vertical Powerue (EVP or UVP) 21
D5 Removing the restrictor plate (EVP, UVP External/Internal) 22
D6 Installing in Accordance with Relevant Codes 23
D7 Creating the Hole in the Outside Wall 24
D8 How to ash the Horizontal Powerue 25
D9 How to ash the Vertical Powerue 25
D10 Running the Flue 26
Page 5
D11 Running the Powerue Electrical Cable 26
E Installing the Appliance 27
E1 Double Sided conversion 27
E2 Installing the Appliance 28
E3 Connecting the Flue 28
E4 Connecting the Network Cable 28
E5 Removing (and replacing) the Glass 29
E6 Remove the Fuelbed Tray & Burners 29
E7 Gas Type Conversion 30
E8 Checking the Gas Operating Pressure 32
E9 Operating the Appliance 34
E10 Auxillary On/O button 35
E11 Home Automation Setup 35
E12 Reinserting fuel bed and ceramic glass 36
F Finishing the Installation 37
F1 Crystalite, Coal, or Driftwood Fuel Bed Installation 37
F2 Log and cone Fuel Bed (Woodland Selection) 37
F3 Wall lining 38
F4 Fitting the Fascia Panels 39
F5 Locating Wall Mount Cradle for Wireless Control 40
F6 Operating the Appliance 40
F7 Normal Operating Sounds and Smells 42
G Installation Checklist 43
S Service Manual 44
S1 Annual service procedure 44
S2 Error Codes 45
S3 Cleaning the Fuel bed and Glass 47
S4 Checking Operating Pressure 48
S5 Replacing a Remote Control 49
S6 Replacing the burners 50
S7 Accessing the control tray 51
S8 Removing the Circuit Board 51
S9 Servicing the Horizontal / Vertical Powerue 53
S10 Wiring Diagram 54
Page 6
A
Installation Process and Product Description
A C D E F G SERVICE
A1 Recommended Installation Process:
The following diagram illustrates the steps required to install your gas re, and the trades required at each stage.
The sequence in which you choose to do these tasks will vary depending on your indi-
B
vidual installation. Please read these instructions carefully before proceeding with the installation. Leave the installation of the optional fascia panels until the very end of the installation and commissioning to avoid damage to the fascia panels.
Create the Cavity Install electrical / gas
connections, ue system, and
replace
Section B Section C, D Section F
Finish installation and t
fascia
A2 Product Description
The Escea DX1500 / DX1000 gas re is a direct vent (fan draught balanced ue), room sealed gas appliance designed to be built into a cavity. This appliance is ued using a co­linear exible aluminium ue connected to a powerue terminal. The hot air from the gas re is transferred to the room via 250mm ID / 300 mm OD ducting. The user will control their re with the Radio Frequency (RF) remote that will normally be left in its wall mount cradle. In addition to the RF remote it has a single auxiliary On/O button on the unit. When not in operation it is in a standby mode unless it is physically isolated from the mains supply.
To access the product Dataplate, rst remove the replace glass, any fuelbed media, the burners and the rebox base. An access panel is located to the side of the bottom of the rebox, the dataplate is located underneath this access panel.
6
Page 7
A3 Product Dimensions
183
NOT TO BE MISTAKEN FOR CAVITY DIMENSIONS
All dimensions are in mm
A
744
B
382
Ø250
70 Ø100
ACDEFGSERVICE
61
B
372
Gas, Power, Internet Connections
Ø75
For more detail, view architectural drawings at www.escea.com
DX1000 DX1500
A 664mm 914mm
B 1328mm 1828mm
7
Page 8
B
Creating the Cavity
A C D E F G SERVICE
B1 Cavity Shape
The DX1500 / DX1000 is suitable for timber framed cavities. Most existing masonry cavities will not be suitable. The cavity design & shape will be dependent on a number of things:
B2 Designing the Cavity
B
The following aspects must be considered when designing this installation:
• Appliance physical size
• Single sided or Double sided
• Wall nishing and interaction with appliance
• Positioning of appliance in regards to wall lining (depth into wall)
• Is a Fascia to be used? one side or two sides?
• Exhaust cowl aspect – horizontal / vertical and ue conguration
• Flue exhaust fan noise
• Exhaust cowl access for maintenance
• Duct layout and cavity spaces to run ducting
• Duct fan position
• Access to duct fan for maintenance
• Gas pipe layout
• Gas isolation valve / pressure test point position
• Electrical isolation switch
• Home automation network connections - Ethernet cable layout
□
This DX1500 / DX1000 re is to be installed prior to any wall lining. The wall lining is the very last task to be completed in this installation.
The cavity and wall linings may be constructed from standard timber framing materials and do not need to be non-combustible. Do not line the top of the cavity. It is not necessary to line the sides, or back of the cavity.
8
Page 9
B3 Flue Conguration (For less than 4m length)
X
Y
X + Y = 4m MAX = 0.6m MIN
4m MAX
1.2m Co-axial Flue
Vertical PowerFlue Cowl (Duravent)
4m MAX
1.2m F-F Liner
UVP-Internal Cowl
ONLY USE ESCEA APPROVED FLUE COMPONENTS
If your ue system is less than 4m long (as shown in the diagrams below), then a simple exible ue is required. if you wish to install a longer ue run, up to 12m, see section B4.
X
Note: You must provide sucient access to the powerue to enable it to be serviced in the future. This means that the fan unit must have suf­cient access to allow it to be replaced if necessary.
Y Maximum = 1.5m
Y Minimum = 0m
X Maximum = 4m
X Minimum = 0m
X + Y Maximum = 4m
X + Y Minimum = 0.6m
The ue must be securely xed and adequate­ly supported by brackets fastened to the building structure at suitable points to ensure the stability of the ue system. Any joints within the ue system must be sealed adequately, with a sealing agent used if necessary. The ue system for the DX1500 / DX1000 is zero rated, so no spaces are required between the ue and any timber framing.
ACDEFGSERVICE
B
Y
Horizontal Flue option Minimum: 600mm ue length Maximum: Total ue length 4m
Note: All sections of horizontal ue if exible must be sloped back toward the re at
□
a rate of no less than 20mm per metre, to allow any condensation to run back into the appliance.
Vertical Flue option Minimum: 600mm ue length Maximum: Total ue length 5.2m
For ue installation, see section D
9
Page 10
B4 Flue Conguration (For more than 4m length)
X
Condensate Trap
A C D E F G SERVICE
B
If your ue system is greater than 4m long (as shown in diagrams below), then a exible ue with condensate trap and rigid PolyPro tube ue lengths is required. (For less than 4m ue runs, see section B3)
Vertical PowerFlue Cowl (Duravent)
1.2m Co-axial Flue (Duravent)
Vertical Powerue Enclosure
Ø80mm / Ø100mm
PP Tube
Ø100mm
12m MAX
4m
Condensate Trap
Ø80mm / Ø100mm
Flexible Flue
12m MAX
4m
UVP Cowl
1.2m F-F Liner
UVP Fan Unit
Ø80mm / Ø100mm
PP Tube
Ø100mm
Condensate Trap
Ø80mm / Ø100mm
Flexible Flue
FOR MORE INFORMATION ON
INSTALLATION OF THE POLYPRO FLUE,
SEE ‘POLY PRO FLUE INSTALLATION
INSTRUCTIONS’ AVAILABLE ON:
WWW.ESCEA.COM
OR SUPPLIED WITH THE FLUE.
FOR POLY PRO COMPONENT GUIDES,
THESE ARE AVAILABLE ON:
WWW.ESCEA.COM
HORIZONTAL FLUE COMPONENT GUIDE
VERTICAL FLUE COMPONENT GUIDE
TITLED:
&
Note: All sections of horizontal ue, if exible, must be sloped back toward the re at a rate of no less than 20mm per metre, to allow any condensation to run back into the appliance.
12m MAX
4m
Y Maximum = 1.5m
Y Minimum = 0m
X Maximum = 12m
ESCEA WALL TERMINAL
Ø80mm / Ø100mm
Ø80mm / Ø100mm
Flexible Flue
10
PP Tube
Ø100mm
Condensate Trap
Ø80mm / Ø100mm
Flexible Flue
X Minimum = 0m
X + Y Maximum = 12m
X + Y Minimum = 0.6m
4m
12m MAX
Ø100mm
Y
Ø80mm / Ø100mm
PP Tube
Page 11
B5 Framing Dimensions
800
1400
1150
MIN
400
MIN
Adequate space to provide gas inlet connection.
DX1000: MIN
DX1500: MIN
1900
450
MIN
381
ACDEFGSERVICE
MIN
Front Side
Single Sided
Side
Double Sided
Guidelines for Framing Dimensions - Bench top / Hutch style
B6 Cavity Base
This appliance MUST be fully supported on its base, over the entire area of the underside of the appliance. The base must also be level and strong enough to support the total product weight, which is approximately 100kg (DX1000) or 120kg (DX1500).
B7 Hearth
No hearth is required
B8 Wall Linings
The appliance must be installed prior to and behind the nished wall surface. Take into account any plaster board, tiles or any other nishing surface that may be intended for the nished wall surface. Wall nishing materials must not encroach upon the minimum cavity clearances given in previous sections. The wall board that lines the outside of the opening can be normal plaster board and does not need to be non-combustible.
B
Note: The nal wall lining must not encroach within the specied dimensions in this sec­tion or section B8. These dimensions indicate the opening required in any wall lining.
These dimensions are for DX1500 / DX1000 without fascia, if using a fascia then please check the following section of this manual for separate wall lining dimensions.
If not using a fascia, ensure the edge of the wall lining is nished in a tidy manner.
11
Page 12
A C D E F G SERVICE
362
SideFront
362
192
DX1000:
MIN
1062
DX1500:
MIN
1562
1100
800
MIN
B
B9 Fascia
The Plasterboard is to protrude beyond framework as shown in the following diagram.
WALL OPENING
(WITHOUT FASCIA)
Note: The wall lining directly above the appliance will get warm and hence may discolour paint nishes that are susceptible to temperature damage or distort vinyl wall coverings. For durability of nishes and surfaces you should contact the relevant manufacturer for their specication and avoid materials with temperature ratings less than 80deg C.
Note that a 20mm or less wall lining must be used when installing a DX-series replace with­out a velo fascia. For wall linings of a total thickness of 10mm or larger, a “Linear Trim” may be purchased to cover any exposed wall lining. A 9mm wall lining is recommended for ease of installation.
Velo Fascia If using a (velo) fascia, the cutout required in the nished plaster board dimensions are:
DX1000: MIN
DX1500: MIN
1600
15
Max
WALL OPENING
(WITH FASCIA)
Note that a 15mm or less wall lining must be used when installing a DX-series replace with a velo fascia, as this is the maximum distance the velo fascia can sit o the front face of the re as shown. For wall linings of a total thickness of 10mm or larger, a “Linear Trim for velo fascia” may be purchased to cover any exposed wall lining.
410
FASCIA
Linear Trim For 10mm-20mm wall linings, an optional “Linear Trim” can be used to cover any unwanted exposed wall lining and/or act as a slimline fascia.
B10 Mantle Clearance
Please refer to the diagram. Mantles or protruding ledges above the heater must not be installed lower than the dimension shown. Note: dimension from base of appliance.
12
Page 13
B11 Television Clearances
800
MIN
The following are the recommended minimum clearances for the location of any electrical equipment (such as a Plasma TV, LCD TV or home theatre system) above an Escea DX Series gas re. Note: The above television clearance recommendations are to be treated as a suggestion of a suitable installation only. It is the responsibility of the end user to check the installation instruc­tions of their electrical appliances to ensure that the location in relation to the gas re is suitable. Escea in no way guarantees or takes responsibility that the above installation suggestion will be suitable for all electrical or home entertainment appliances. Note: Dimension from base of appliance. For installations with a recessed TV above, allow at least 300mm above the top of the appliance to allow for Duct and ue routing.
B12 Ducting
Note: The duct fan must be installed in a location accessible for service or replace­ment, a service hatch (to allow for access) may be required.
This gas re requires a small network of ducting situated in either the ceiling or under the oor to distribute heat generated by the appliance. A centrifugal fan (separate purchase) is connected to the duct system and this draws air through the appliance where it is heated, and then distributes it via the ducting network. The centrifugal fan is powered by the appliance. When placing outlets in rooms other
than the room the appliance is installed, it is important to allow for return air to equalise pressure between the rooms.
Caution: Provision must always be made for return air from heated rooms e.g. undercut doors or natural leakage.
ACDEFGSERVICE
B
WARNING: OVERHEATED ROOMS ARE NOT SAFE FOR INFANTS
DX res require a minimum of three outlets in the ducting system to be fully open at all times. At least two of those outlets must be present in the same room that the re resides in. There can be a maximum of 5 outlets for the DX1000 and 8 outlets for the DX1500. A standard duct kit (separate purchase) has provision for the three minimum outlets - You can use your own ductwork and outlets, but you must ensure they are rated to tempera­tures of at least 90 degrees Celsius and have an appropriate R-value. Ductwork must be adequately sized to avoid excess backpressures. Inadequate duct sizes will cause unnecessary fan noise and premature fan failure. We recommend removing the close aps from at least three of the duct outlets to pre­vent unnecessary back pressure and fan noise. Ductwork must not be crushed or exposed to excessive heat sources.
Note: If duct backpressure is too great, the appliance can shut down due to overheating.
□
This ducting fan will generate mechanical noise. Ideally it must be installed in a position where noise will not interfere with daily activities. All air ducts will make noise no matter how well the system is designed. Increasing the number of outlets is a simple strategy to reduce this noise.
13
Page 14
For installations with the duct fan installed in the appliance cavity we recommend:
A C D E F G SERVICE
B
- Contact Escea’s free Architectural Advice Service at [email protected] and forward them a copy of the intended design for comment.
- The cavity to be clad with sound gib.
- The fan to be wrapped in a sound absorbing material.
- The system be tested for sound related issues before it is enclosed. Please contact Escea for more information at this stage if advice is needed.
- The duct fan must be hung on the provided hanger.
- The ducting must always have a “C” shape or an “S” shape to break up the sound waves on both sides of the duct fan.
-The duct fan must be installed in a location accessible for service or
replacement, a service hatch (to allow for access) may be required.
-Never place the fan in such a way to result in a straight run to the top of the re, as the sound of the fan will echo out the front of the re.
B13 Duct Fan mounting
Using the 3x spring mounts supplied, the duct fan should be installed in one of the following positions as shown below. You must use the spring mounts as this will help decrease noise by not transferring vibration into the walls.
Note: The duct fan must be installed in a location accessible for service or replace­ment, a service hatch (to allow for access) may be required.
Run the electrical cable from the duct fan to the cavity where the appliance will be in­stalled. Ensure the cable is not draped over or in contact with the outer shell of the appli­ance or either of the exi ue tubes and kept clear from any other possible heat sources. Fix it appropriately and allow enough cable loop to prevent tension on the cable plugs. The duct fan unit length is approx 350mm and diameter is approx 340mm. The duct fan must not be exposed to the outdoors.
END OF SECTION B
By the end of this section, you should have:
□ A framed, but un-lined, cavity sized to suit your fascia and ue conguration □ Provision for sucient access to the powerue for future servicing
14
Page 15
C
1m
Installing the Electricity and Gas to the Appliance
C1 Power Supply
While the cavity is being created consideration should be given to appropriate location of a standard 3 pin, EARTHED 230/240V power outlet. This must be within 1.0m of the bottom right of the appliance.
IMPORTANT: Locating the power outlet within the cavity makes the installation very neat but provision MUST be made to be able to switch the power supply o and on (electri­cal isolation switch) and MUST be accessible after the heater has been installed. This is normally done by means of a separate switch located outside of the cavity and wired to the plug. This will allow technicians to isolate the power supply before servicing the ap­pliance.
This appliance must not be located immediately below a socket outlet. This appliance will draw a maximum of 2 Amps from a 230/240V supply. No additional power supply is required for the power ue.
C2 Network Cable
A 5 meter length of network (Ethernet) cable has been supplied and is coiled inside the lower right of the replace. Access this via the removable access panel, and connect it to the buildings modem.
ACDEFGSERVICE
B
If you do not wish to connect the replace to the modem, the Network / Ethernet cable should be run to somewhere accessible by a service technician, such as a cupboard.
15
Page 16
C3 Gas Pipe Sizing
Gas pipe should be sized as per the requirements of AS/NZS 5601.1. The pipe sizing must
A C D E F G SERVICE
B
be sucient to deliver the following volume of gas to the heater with all other gas appli­ances in the home running at the same time:
C4 Gas Pipe Position
The gas connection is inside the appliance and is ½” male BSP on the lower right of the appliance as shown. Access is through the bottom of the rebox via a hatch (shaded grey in the right diagram).
C5 Gas Isolating Valve
A gas isolating valve must be installed in the gas line as close to the appliance as possible. Fix it in a convenient position to allow it to be closed o quickly and easily during normal operation. Take into consideration access to this valve once the wall linings are on. This will also allow for easier servicing in the future.
DX1500 Gas Consumption = 42MJ/hr DX1000 Gas Consumption = 33MJ/hr
END OF SECTION C
By the end of this section, you should have:
□ An unlined cavity with 230/240V AC supply that the appliance can be plugged into □ An electrical isolating switch that is accessible once the appliance is installed □ A suitably sized gas supply to the right hand side of the appliance with a pressure
test point, ready to be connected once installed
□ Network cable installed, ready for plugging into appliance, regardless of being
connected to internet router/network or not
16
Page 17
D
Installing the Flue
Note: The appliance is designed to operate using the approved exible ue supplied by Escea. Using other brands of ue may aect the appliance warranty.
D1 Installing the Horizontal Powerue Wall Terminal option
The Horizontal Powerue Wall Terminal must be installed in the correct orientation. This allows for the correct operation of the ue system and prevents the ingress of water.
The Horizontal Powerue Wall Terminal must be weather­tight when installation is complete to prevent damage to the dwelling. It must be installed by a suitably qualied person.
Fit the Horizontal Powerue Wall Terminal into the hole and x in place, making sure the installation is sealed appropriately to prevent the ingress of water from outside the wall cladding. Take notice of the label on the termination which shows the correct orientation that the terminal should be tted.
NOTE: It is the responsibility of the installer to ensure the Horizontal Powerue Wall Termi­nal is installed to all relevant building codes to ensure weather tightness.
ACDEFGSERVICE
B
17
Page 18
D2 Installing the Internal Vertical Powerue (Duravent)
The internal vertical ue(duravent) option is designed to have
A C D E F G SERVICE
B
the box containing the fan and electricals mounted within the roof space of the house, and the vertical 200mm diameter twin wall ue penetrate through the roof. The standard kit comes with 1.2m of twin wall ue (post fan), for alternative lengths, contact Escea. Note total combined maximum vertical ue before the fan must be less than 12metres (max 4m Flexi+ max 8m polypro). Use standard methods to ash the roof penetration, the instal­lation must be weather proof and conform to all local council standards including powered ue roof termination rules.
The cowl surround should be xed in place as shown
Mount the fan assembly box to roof framing using timber or builders strapping, ensuring the ue is vertical and rigidly mounted.
Aim to have the fan box mounted as high as possible, mainly to allow sucient fall for condensation drainage if the exi-ue is to run horizontally.
Ensure there is sucient space below fan box to have access to t the exi-ue tubes and to allow owing bends if required.
Note: The vertical powerue and the exi ue connections must be installed in a location accessible for service or replacement, a service hatch or removable ashing to allow for access may be required.
18
Page 19
D3 Installing the Universal Vertical Powerue (Internal Install)
(1)
(2)
(3)
290
229.1
ø226.8
31.6
221.8
250.2
31.6
103.4
TIMBER MUST NOT OBSTRUCT THESE ZONES
Note: For information regarding an external install of the UVP, go to section D4.
The UVP Internal conguration is designed to have the fan, mount­ed within the roof space of the house, and the vertical ø225mm diameter liner, containing a ø100mm exi, penetrate through the roof. The UVP internal conversion kit comes with 1200mm liner which is specic to the internal installation and must always be used. Note: The ue setup must comply with section B3 or B4. Use standard methods to ash the roof penetration, the installation must be weather proof and conform to all local council standards including powered ue termination rules.
Mount the fan mount bracket(1) to the roof framing and strapping using timber ensuring that the ue is rigid and vertical. Ensure that the mounting timber does not obstruct access to the 3xM5 screw threads on the side of the fan unit.
Aim to have the fan enclosure(2) mounted as high as possible, mainly to allow sucient fall for condensation drainage if the exi­ue is to run horizontally.
Ensure there is sucient space below fan enclosure(2) to have ac­cess to t the exi-ue tubes(3) and allow owing bends if required.
Note: The UVP-Internal and the exi ue connections must be in­stalled in a location accessible for service or replacement, a service hatch or removable ashing to allow access may be required. Note: When installing the unit onto a ue liner, ensure the length of ue liner above the roof is the minimum required length.
ACDEFGSERVICE
B
19
Page 20
A C D E F G SERVICE
The UVP-Internal kit is intended for use within an accessible roof space or ‘chimney’ con­struction. Service access must be provided. Ensure installation complies with relevant building codes and regulations
Typical Installation UVP Cowl
B
Roof Space
Hose band clamps
To appliance
1.2m F-F Liner
‘Decktite’ or similar ashing
Ensure Power Flue unit is securely braced using integral brackets.
UVP Fan Unit
Power cord to appliance
Ø75mmØ100mm
20
Page 21
D4 Installing an External Vertical Powerue (EVP or UVP)
Note: For information regarding an internal install of the UVP, go to section D3.
The EVP and UVP are designed to have the enclosure containing the fan unit mounted externally.
The cowl surround should be xed in place as shown.
Depending on the kit purchased, mount the EVP/UVP kit to the top of a chimney ashing plate or penetrate the roof with an optional ue liner accessory and t the EVP or UVP kit over the ue liner; sealing the penetration with a decktite or similar ashing. Ensure the terminal is vertical and rigidly mounted and the exi ue attached below is xed to the terminal spigots using the supplied hose clamps and is held in place by drilling 3 holes and screwing 3 self tapping screws evenly around each hose band clamp (as shown in the picture below).
ACDEFGSERVICE
B
Note: When installing the unit onto a ue liner, ensure the length of ue liner above the roof is the minimum required length.
21
Page 22
D5 Removing the restrictor plate (EVP, UVP External and Internal Only)
A C D E F G SERVICE
B
For every DX-series installation with an EVP, UVP-External or UVP-Internal, the attached restrictor plate must be removed . To do this:
□ Turn the unit on its head and identify the restrictor plate attached to the ø75mm spigot. □ Break the restrictor plate with a pair of snipers, pliers, or other means necessary. (Do not
damage the ø75mm spigot).
22
Page 23
D6 Installing in Accordance with Relevant Codes
N
R
F
S
W
U
A
V
K
Q
E
J
J
A
H
E
D
C
C
A
O
G
J
L
B
M
P
Prohibited area for flues is below or Distance 'E'to
the left andright of the
Electricity meter
or fuse box
M =Gas Meter
P = Electricity meter orFuse box
The location of the Powerue Terminal must be installed in accordance with AS/NZS
5601.1 and any other relevant building codes. Avoid installing the Powerue Terminal in areas exposed to high winds and extreme weather, if possible. Some of those minimum clearances for a fan assisted terminal are listed below; please refer to AS/NZS 5601.1 Gas installation standard for full guidance on the design of the ue system. Where possible allow a greater clearance.
A Below eaves, balconies and other projections 200mm
B From the oor, above a balcony or other surface 300mm
C From a return wall or external corner 300mm
D From a gas meter or regulator vent 1000mm
E From electricity meter or fuse box 500mm
F From a drain pipe or soil stack 75mm
G Horizontally from any building structure or obstruction 500mm
H From any other ue terminal or combustion air intake 300mm
J Horizontally from any openable window, door, non-mechanical air inlet, or any other
opening into a building with the exception of sub oor ventilation
K From a mechanical air inlet or spa blower 1000mm
L Vertically below any openable window, door, non-mechanical air inlet, or any other
opening into a building with the exception of sub oor ventilation
N Horizontally from a roof light 600mm
O Vertically from a roof light 500mm
Q Vertically from a flat roof 500mm
R Horizontally from a vertical structure 500mm
S Below a roof window 2000mm
T Above or either side of a roof window 600mm
U From a dormer window 1500mm
V Above the apex of the roof (see note 1 on following page) 300mm
W From an open flue 1500mm
ACDEFGSERVICE
B
300mm
300mm
23
Page 24
D7 Creating the Hole in the Outside Wall
When cutting the hole in the outside wall, be mindful of how the installation Horizontal
A C D E F G SERVICE
B
Powerue Wall Terminal will be nished, the installation must be weatherproof.
Ideal hole/cavity size for Horizontal Powerue
X 298mm
Y 298mm
Z 175mm Excluding allowance
for ue which exits here
The Horizontal Powerue Wall Terminal can be attached to the wall in two ways, A) From the front of the terminal:
B) By attaching the optional Wall Terminal Installation Brackets to the sides of the cavity and attaching the Horizontal Powerue Wall Terminal to these, from the front:
24
Page 25
D8 How to ash the Horizontal Powerue
The following diagrams are excerpts from the escea architect drawings, and are available in full on our website. These diagrams are recommendations, and your installation must comply with any local or national building codes.
D9 How to ash the Vertical Powerue
ACDEFGSERVICE
B
25
Page 26
D10 Running the Flue
If your ue system is greater than 4m long (as shown in diagrams below), then a exible
A C D E F G SERVICE
B
ue with condensate trap and rigid PolyPro tube ue lengths is required (see textbox at end of section for more info). Run the Ø100mm ID and Ø75mm ID (Ø110mm OD & 85mm OD) exible aluminium hoses from the cavity to the rear of where the Horizontal Powerue Wall Terminal will be installed in the outside wall. The ue system for the DX1500 / DX1000 is zero rated, so no spaces are required between the ue and any timber framing. Allow enough stretch in the exible aluminium ue to allow it to be able to sit just outside of the wall.
Note: The exible ue is shipped in a ‘compressed’ form. Extend it to your desired length by stretching (up to 4m maximum per length).
FOR MORE INFORMATION ON INSTALLATION OF THE POLYPRO FLUE, SEE ‘POLY
PRO FLUE INSTALLATION INSTRUCTIONS’ AVAILABLE ON:
WWW.ESCEA.COM
OR SUPPLIED WITH THE FLUE.
FOR POLY PRO COMPONENT GUIDES, THESE ARE AVAILABLE ON:
WWW.ESCEA.COM
HORIZONTAL FLUE COMPONENT GUIDE &
VERTICAL FLUE COMPONENT GUIDE
D11 Running the Powerue Electrical Cable
Note: The Horizontal Powerue Wall Terminal is powered from the appliance, and must be connected to the appliance with the supplied electrical cable only.
TITLED:
The supplied electrical cable is 7m long with standard 6m ue kits, and ue extension kits also include a Powerue electrical cable extension.
Run the electrical cable from the cavity where the appliance will be installed to the hole in the outside wall. Ensure the cable is not draped over or in contact with the outer shell of the appliance or either of the exi ue tubes and kept clear from any other possible heat sources. Fix it appropriately and allow enough cable looped to be able to pull the Horizontal Powerue Wall Terminal out from the installed position should servicing be required.
END OF SECTION D
By the end of this section, you should have:
□ A weather-tight Horizontal Powerue Wall Terminal installation with clearance as
specied by AS/NZ5601.1
□ Reasonable access to the outside face for maintenance purposes. □ Flue attached to the rear of the Horizontal Powerue Wall Terminal leading back to
the appliance.
□ The electrical cable from the Horizontal Powerue Wall Terminal attached to the rear
of the installation and run back to the appliance cavity in an electrically safe manner.
26
Page 27
E
Installing the Appliance
E1 Double Sided conversion
If the appliance is to be double sided, you will have been supplied with an extra glass panel and steel support frame and wall lining trim brackets.
1. On the rear of the appliance, unscrew the outer shell cover and remove it as shown
2. Unscrew the Firebox rear panel and remove it. Sometimes extra force may be required to remove this panel as the sealing tape can ‘glue’ itself to the painted surface.
ACDEFGSERVICE
B
3. Screw the Wall Lining trim brackets on to the appliance chassis as shown in photo.
4. Carefully install the extra glass panel and frame onto the appliance, ensuring that the glass does not fall from the frame. Tighten the bolts around the outside of the glass retainer until securely tted.
27
Page 28
E2 Installing the Appliance
A C D E F G SERVICE
Insert the gas re into the cavity and bolt down in correct position using the brackets on each end of the appliance. It is a requirement that this appliance be securely fastened at the base.
□ On the right hand side of the appliance:
B
□ Connect the powerue electrical cable. □ Connect the Duct fan electrical cable □ Plug the appliance Mains power electrical cord into the
230/240volt outlet in the cavity.
E3 Connecting the Flue
Access the top of the appliance and connect both the inlet ue (Ø75mm ID / 85mm OD) and the exhaust ue (Ø100mm ID / 110mm OD) to their respective spigots. Tighten the hose clamps onto the spigots. Ensure the ue connection is air tight. Sealant is not required.
WARNING: The ue connection MUST be secured with the clips provided and tape MUST NOT BE USED. If any of the ue pipe is damaged and integrity compromised then it should not be repaired with tape, it should be replaced.
Connecting the Ducting
Attach the ducting to the top of the appliance at the 250mm diameter spigot and secure using a clamp or appropriate ducting tape to ensure an airtight joint.
E4 Connecting the Network Cable
A network cable has been attached to the appliance. This must be left accessible even if not being used, to make future servicing or upgrades easier. To access the network cable, open the access hatch on the base of the rebox (underneath the burners) and feed the cable through the holes in the outer chassis where the power and gas lines are.
28
Page 29
E5 Removing (and replacing) the Glass
Using the supplied 3mm Allen Key (hex drive) remove the bolts around the glass retainer ensuring that the glass does not fall forward.
Pull the top of the frame toward you slightly and lift the glass and frame out and away from the re. Place the glass & frame carefully aside.
NOTE WHEN REPLACING THE GLASS:
When replacing the glass, note that the metal ange shown to the right must be on top (not the bottom), or the glass will not t correctly to the replace.
ACDEFGSERVICE
B
E6 Remove the Fuelbed Tray & Burners
Remove the Fuelbed tray from the re box, by lifting one end up into the top corner and then out towards you. Take care not to scratch the rebox paint and lift out the burners.
29
Page 30
E7 Gas Type Conversion
THIS APPLIANCE IS CONFIGURED TO OPERATE ON NG
A C D E F G SERVICE
B
If gas type conversion is not required then jump to “checking operating pressure”
Note: Access to the valve and control system can be through either of the 2 hatch panels shown shaded black in the diagram of section E8.
Your gas re has been supplied with the necessary parts for gas conversion. Follow the steps on the following page to change from NG to ULPG/Propane or vice versa. WARNING: The regulator that is supplied with the re MUST NOT BE REMOVED. Removal of the regulator, or replacing it with one not intended for use with this Escea re, will void the limited appliance warranty. Turn o power and gas rst
Step 1: Ensure power and gas is o. Remove the fascia, glass and fuelbed as per
section E6
Step 2: Lift out the two burners and the surrounding perforated grill as per section E7.
Step 3: Remove the screws in the bottom and the inner side of the rebox as per shown.
Remove ‘engine’ by lifting up and to the left. This is still connected internally to the gas hose and power cables. Place engine just to the left within rebox as shown.
Step 4: Change the two main burner jets with the jets supplied in kitset.
DX1500 DX1000
NG (Both jets) Ø2.3mm Ø1.95mm
Propane / ULPG (Both jets) Ø1.3mm Ø1.10mm
30
Page 31
Step 5: Remove the regulator screw cap and screw out the nylon adjuster screw to
remove the existing spring. Replace the spring with the purple spring supplied in the conversion kit and reassemble the regulator.
Step 6: Cover the existing gas type label (located on underside of hatch shown in
section C4) with the new gas type label supplied in kitset. Ensure serial number and date of manufacture are still visible. Write your name, company (if appropriate) and date of conversion on new label with permanent marker.
ACDEFGSERVICE
Step 7: Place engine back into rebox. Take care not to pinch any wires. Don’t replace
the screws at this stage.
Step 8: The burner tubes on both burners have convertible collars. Ensure the collars on
both are set to the correct orientation. Place one burner only into position.
ULPG/Propane NG 11mm hole exposed 3.5mm hole exposed
Step 9: Adjusting the electronic controller for gas type
Ensuring the gas is still OFF, Turn the power ON. On the remote control, insert the new “AA” size batteries. You should now see the time on the display showing 0:00 Press the MINUS (4), PLUS (8) and FAN BOOST (7) buttons simultaneously (as shown right) until the characters “03” light up on the display. Release the buttons and the remote will count down and display “GO”. The screen will then display all characters. This will put the remote into test mode and the two big temperature digits should begin counting from 0 to 99 repeatedly.
B
Now hold down the “Edit Timer” button and “Activate Timer” button simultaneously, the remote display will show the current conguration of either “NG” for Natural or “LP” for ULPG/Propane. To change this conguration, hold down the same 2 buttons “Edit Timer” and “Activate Timer” simultaneously for 5 seconds. This will now have toggled between gas types. Once you are have chosen the correct gas mode, simply press the “ ” power button once to exit this diagnostics mode.
31
Page 32
E8 Checking the Gas Operating Pressure
A C D E F G SERVICE
B
Note: Access to the valve and control system can be through either of the 2 hatch panels shown shaded black in the diagram to the right. Note: ensure the thermostat control within the remote does not cause the ame to modulate down by increasing the set temperature and keeping the remote in a cool environment
Turn on the gas. Turn the power on.
Check the inlet pressure upstream of the ap­pliance using the test point that you installed earlier. Note: The regulator that is supplied with the re MUST NOT BE REMOVED. Removal of the regulator, or replacing it with one not intended for use with an Escea re, will void the limited appliance warranty and may be dangerous. The gas valve is shown right with Manometer test points at A or D and C.
Gas Pressure Table - DX1000 Gas Type
Propane (AUS)
Natural Gas
or ULPG (NZ)
Minimum Inlet Pressure - Pre-Regulator 2.75 kPa 1.13 kPa
Maximum Inlet Pressure - Pre-Regulator 5.0 kPa 5.0 kPa
Operating Pressure when on high - (Point A or D) 2.32 kPa ±5% 0.82 kPa ±5%
Operating Pressure when on low - (Point A or D) 0.72 kPa ±5% 0.28 kPa ±5%
Max operating pressure - at burner jet 2.30 kPa 0.76 kPa
Operating pressure - Post-Regulator (Point C) 2.30 kPa 1.00 kPa
Gas Pressure Table - DX1500 Gas Type
Propane (AUS) or ULPG (NZ)
Minimum Inlet Pressure - Pre-Regulator 2.75 kPa 1.13 kPa
Maximum Inlet Pressure - Pre-Regulator 5.0 kPa 5.0 kPa
Operating Pressure when on high - (Point A or D) 1.96 kPa ±5% 0.76 kPa ±5%
Operating Pressure when on low - (Point A or D) 0.96 kPa ±5% 0.28 kPa ±5%
Max operating pressure - at burner jet 1.94 kPa 0.75 kPa
Operating pressure - Post-Regulator (Point C) 2.30 kPa 1.0 kPa
32
Natural Gas
Page 33
Loosen test point C (shown in diagram above) and attach a manometer tube in prepara­tion for measuring the operating pressure - post regulator. Turn the re on high and adjust the operating pressure at the regulator. Once the operating pressure - post regulator - is set, check the operating pressure at test point A or D ( Shown in the rst diagram of this section).
Changing the Operating Pressure from the Remote
ACDEFGSERVICE
The following instructions must only be undertaken by a suitably approved person. Any tampering by an unauthorized person will void the product’s
warranty and may result in a dangerous condition.
While the remote is in its “OFF” mode with only the time showing on the display, press the MINUS, PLUS and FAN BOOST buttons simultane­ously (as shown right) until the characters “03” light up on the display. Release the buttons and the remote will count down and display “GO”. The screen will then display all characters and should be reading 00. This will put the remote into test mode.
Whilst in test mode: press and hold the “Activate Timer” and “Fan Boost” buttons for 4 seconds to access the gas valve settings. The appliance will automatically turn on while in this mode.
WAIT; allow the appliance to fully light all burners before continuing.
The high setting for the currently set gas type is displayed first (indicated in the clock segments at the top). Pressing the plus or minus keys will change the setting up or down respectively and change the gas pressure measured at point A or D. The large digits will blink rapidly after the setting is made until the verification is received from the fire. Note: the numbers displayed on the remote should only be used to achieve the correct pressure. The numbers by themselves don’t represent anything and should not be relied upon.
B
Toggling to the low setting is done by pressing the “Flame Eect” button (indicated in the clock seg­ments at the top and by the “Flame Eect” icon at the bottom). Settings are made with the Plus Minus buttons as above. Exiting this mode is by pressing the on/o button.
33
Page 34
E9 Operating the Appliance
A C D E F G SERVICE
B
Turn on the re by pressing the “ ” power button the remote and within a few seconds the appliance will begin its startup sequence, with a 15 second purge of the ue fan. After purge it will arc It may take a few attempts to light the rst time due to air in the gas line. You may wish to purge the gas line at the valve by bleeding the rst test point. This requires a small blade screwdriver. Once the re has lit the pilot and main burner you will be able to measure the operating pressure. Set the remote temperature to 30deg by pressing the “+” button. This will allow maximum gas ow into the appliance. Ensure all other gas appliances within the house are also operating at maximum. If the operating pressure does not read within 5% of the table above then remove the cap from the gas pressure regulator within the appliance and adjust the threaded spring stop. The true adjusted pressure can only be read with the cap replaced.
Press the “ ” power button again to shut down the re.
E10 Auxillary On/O button
The auxillary on/o button is used to turn the replace on without the Remote Control, and also used for “teaching” the replace to listen for new remote controls. For information on teaching a new remote control, see section S4 of the service manual at the end of this document.
The auxillary On/O button is accessed by using an allen-key or thin object to poke through in the location shown to the right.
E11 Home Automation Setup
Escea D-Series replaces have a simple interface for connection to a home automation system. Simply put this allows the replace to be woken up and started and then shut down. The “Close to wake” connection shown is essentially taking one of the 3.3 volt DC pins on the replace micro controller and pulling it down to ground. In order to isolate the replace from the automaton system a relay needs to be used as shown. This allows you to use any nominal voltage to drive the relay while keeping the replaces 3.3V supply isolated.
34
Page 35
Fireplace
block supplied by Escea
Required relay
Connector on fireplace
µ
+3.3VDC
Connector and terminal
Terminal block
From Automation system
Note: you will need to match the relay coil voltage with the voltage from your automaton system.
The Home Automation connection can be found in your replace accessory pack and is shown to the right.
This connects to the replace via the removable access panel in the bottom right of the replace, as shown in section C2.
Home Automation Operation:
Relay closed The replace will start in a medium setting until it receives a signal from the remote con­trol unit (up to 4 minutes). Once the remote has communicated with the replace it will turn on and begin operating the replace thermostatically. The remote will use whatever temperature the user has previously set and cannot be altered by the home automation system. The replace will continue to operate while the relay is closed.
ACDEFGSERVICE
B
Note: If the replace cannot communicate with the remote controller within 10 minutes of the relay contact closure then the replace will shut down and return to standby. The remote controller is required to be operating within range of the replace for its safe operation.
Relay open If the replace was operating with a closed relay then upon opening the relay contacts the replace will shut down and return the remote controller to its standby mode when it next updates (up to 4 minutes). While the relay is open the replace will be in standby mode and available for manual operation by the user.
35
Page 36
E12 Reinserting fuel bed and ceramic glass
A C D E F G SERVICE
B
Re-insert the 14 engine screws if removed.
Place the burners and Fuelbed Tray back into position. If removed, place inspection panel back on.
At this stage you should relight the appliance to conrm correct ignition.
END OF SECTION E
By the end of this section, you should have:
□ The appliance installed in the cavity □ The appliance xed to the cavity base and wall lining □ The appliance plugged into a mains electricity supply □ The appliance gas supply attached and pressure tested with all other gas appliances
running
36
Page 37
F
Finishing the Installation
F1 Crystalite, Coal, or Driftwood Fuel Bed Installation
If using the crystalight, coal, or driftwood fuel beds, rst place all the Crystallite/Coal pieces in a single layer atop the Burners and Fuelbed Tray. Cover the entire area except for the pilot shield, ensuring coverage right up to both glass windows and rear of rebox for single sided.
If the Driftwood fuelbed style has been chosen, follow the above directions for placing the Crystallite and then place the Driftwood pieces randomly atop the Crystallite layer. Ensure the wood pieces are spread out across evenly and not over the pilot assembly.
Do not heap or mound any fuelbed. Continue onto following page >
F2 Log and cone Fuel Bed (Woodland Selection)
If using the Logs and cones with Shale (chips) fuel bed, rst place the logs and cones in the positions as shown below.
ACDEFGSERVICE
B
Once the logs and cones have been correctly positioned, scatter the Shale (chips) fuel bed media evenly across the re base to cover as much area as possible without obstructing the pilot ame.
37
Page 38
A C D E F G SERVICE
B
For the DX1000 you should use the 7x supplied 600ml bags of shale (chips), and for the DX1500 you should use the 10x supplied bags. Note: Improper positioning of any fuelbed media may create carbon build-up and will alter the unit’s performance. Malfunctioning due to improper fuel media placement will not be covered under warranty.
Reinstall the glass and retainer frame, being careful that the glass does not fall from the frame. Tighten the bolts around the outside of the glass retainer until securely tted. Do not over-tighten the glass retainer bolts. Just nip them up.
NOTE: If there is any residue left on the glass from the plastic wrap packaging of the replace, it must be cleaned using any standard glass cleaner prior to operation.
Note: If the glass gasket requires a replacement, call your nearest Escea agent who will ensure the part is replaced with the correct type. In the event that the glass is broken by impact, purchase the replacement from an authorised Escea agent only.
Conrm the appliance is working correctly by lighting it 2 or 3 times to ensure correct operation & smooth ignition. Also conrm both ue and room duct fans are running cor­rectly.
NOTE WHEN REPLACING THE GLASS:
When replacing the glass, note that the metal ange shown to the right must be on top (not the bottom), or the glass will not t correctly to the replace.
F3 Wall lining
Only after the above list is satised, can you commence with the nal wall linings. The appliance and all corresponding ducting needs to be adequately covered (both sides if double sided) to prevent plasterboard and building dust from entering the ducting system during completion of the wall lining. Wall lining cutout dimensions around the glass must be adhered to.
Please refer to section B8 for wall nishing dimensions surrounding glass. Ensure the air inlet gap surrounding the glass is maintained. The glass frames must still be
able to be removed after wall linings installed.
38
Page 39
F4 Fitting the Fascia Panels
To avoid scratches or knocks to the fascia panels of this heater they must be tted at the complete conclusion of the installation process, after wall linings are in place.
Note: Never ever rub the fascia.
Step 1: Ensure the plastic spacer is placed on the thread of the studs.
Step 2: Screw and tighten the 4 studs with spacers onto the back of the fascia.
Step 3: Rivet the 4x spring clips onto the chassis of the appliance as shown
ACDEFGSERVICE
B
Step 4: After the 10-15mm thick wall has been nished, the fascia clips onto the appliance as shown. Note: wall linings larger than 10mm may require the ‘Linear Trim’ available from your local dealer to hide any exposed wall lining.
39
Page 40
F5 Locating Wall Mount Cradle for Wireless Control
The appliance’s remote contains the thermostat that will sense the room temperature
A C D E F G SERVICE
B
and communicate this back to the heater via radio frequency. A wall mount cradle has been provided for the wireless control and where possible the control should be housed in this cradle.
The location of this cradle should be decided by taking into account the following factors;
□ Simple, convenient access for the user □ Away from air ow and drafts through the
room
□ The parts of the room that people are likely to
spend time
□ Away from direct sun light □ A suitable distance away from the heater □ Ideally 1.2m to 1.5m from the oor
The radio frequency signal will go through some walls but for best results Escea suggest that the cradle position is less than 10 metres away from the heater.
The best height o the ground to locate the cradle is about chest height. This gives a good average room temperature and easy access for the user. Please ensure that cradle is screwed rmly onto the wall using the screws provided.
F6 Operating the Appliance
If you haven’t done so already, insert the supplied “AA” size batteries, being careful of the polarity. You should now see on the display of the remote the time showing “0:00”.
To turn the re on, press the “POWER” button once, and within a few seconds the appli­ance will begin its startup sequence. NOTE: The appliance begins its startup with a 15 second pre-start purge, where the combustion fan runs on its own to clear the rebox before it tries to ignite. During the pre-purge the remote will alternately show the remote’s “Set” temperature and a rotating segment indicator to show that the re is in start up mode and will try to ignite.
When the appliance has lit, set the room temperature by pressing the ‘plus’ or ‘minus’ buttons repeatedly until the display is showing the desired temperature. The remote will then revert back to the ‘current’ room temperature 30 seconds after making the change.
Run the appliance on full for an hour with the windows and doors open in the dwelling. This will ensure any running-in smells have the chance to dissipate.
The appliance is turned o by pressing the “POWER” button once more. The remote will display the time only.
40
Page 41
Run the appliance again and check the operation of the thermostat by increasing and re­ducing the set temperature. Check the Flame Eect function and the Fan Boost functions work correctly.
For further operation instructions please refer to the User Guide.
Final checklist
□ Run the appliance on full for an hour with the doors & windows open □ Dwelling owner shown how to operate the appliance correctly □ Warranty card lled in with installer details and appliance serial number □ User Guide made available for dwelling owner □ Plumbing Industry Commission Compliance Certicate given to dwelling owner
ACDEFGSERVICE
B
Page 42
F7 Normal Operating Sounds and Smells
Note: Each time the re is lit from cold the glass may fog up with condensation. This is normal and the
A C D E F G SERVICE
condensation will disappear within a few minutes once the glass heats up.
Sounds
It is possible that you will hear some sounds from your gas appliance. This is perfectly normal due to the fact that there various types of materials used within your appliance. Listed below are some examples. These are all normal operating sounds and should not
B
be considered as defects in your appliance.
Fan: Escea gas appliances use electric fans to push heated air into the room. It is not unusual for the fan to make a “whirring” sound when ON. This sound will increase or decrease in volume depending on the speed setting of your fan.
Gas Control Valve: As the gas control valves turn ON and OFF, a dull clicking sound may be audible, this is the normal operation of a valve. When the re is switched o after being run for a while, there may be popping and uttering noises as the residual gas in the burners burns away. These are normal and should be no cause for concern.
Unit Body/Firebox: Dierent types and thicknesses of steel will expand and contract at dierent rates result­ing in some “cracking” and “ticking” sounds being heard throughout the heating and cool down processes.
Smells
The rst few times the unit is operated, the unit may release an odour and the ames will appear orange caused by the curing of the paint, the burning o of the starch in the gas logs and the oils in the metal. This is a temporary curing process which will disappear with use.
A deposit on the inside of the glass, caused by the starch in the logs, may appear as a build up after several uses. If this lm is not removed, it will bake on and may become dicult to remove. When the glass is cold, remove it (see section E5) and clean the inside with a non-abrasive cleaner.
DO NOT ATTEMPT TO CLEAN THE GLASS WHILE IT IS HOT. UNDER NORMAL USE, NEVER OPERATE THE UNIT WITH THE GLASS REMOVED.
END OF SECTION F
By the end of this section, you should have:
□ A completely tted fascia □ The remote control mounted on its cradle on a wall □ Operated the re and veried that it lights reliably and safely □ Run the appliance on full for an hour with the doors & windows open □ Checked the operation of the thermostat, Flame Eect & Fan Boost functions
42
Page 43
G
Installation Checklist
Go through the following checklist to ensure you have installed the appliance correctly
□ Correctly sized cavity to suit your fascia and ue conguration □ Correct clearances to combustibles and mantles around the fascia □ An electrical isolating switch to the appliance, accessible after nished installation □ Correctly sized gas supply with a pressure test point, ensuring adequate supply with
all other gas appliances in the dwelling running
□ A weather-tight installed Horizontal or Vertical Powerue Terminal with clearance as
specied by AS/NZ5601.1
□ If chosen, reasonable access to the outside face of the Horizontal Powerue Wall Ter-
minal for maintenance purposes and ue attached to the rear of the Horizontal Powerue Wall Terminal leading back to the appliance (and similar for Vertical Powerue Terminals)
□ The electrical cable from the Powerue Terminal attached correctly and run back to
the appliance cavity in an electrically safe manner
□ The appliance xed to the cavity base □ The appliance plugged into a mains electricity supply □ All gas joints and pressure points leak tested, and suitable leak detection solution and
drop tests completed on gas pipework
□ Fuel bed correctly installed □ Glass correctly tted □ Operated the re and veried that it lights reliably and safely □ Appliance functions checked, including thermostat operation, Flame Eect and Fan
Boost
□ Data label marked up with correct gas type, and dated by installer if converted during
installation
ACDEFGSERVICE
B
Page 44
Service Manual
S
A C D E F G SERVICE
IMPORTANT:
• This appliance must be serviced every 12 months.
• Any service operation should be carried out only by a suitably qualied and trained person.
B
S1 Annual service procedure
• Gas and electricity supply MUST be isolated before any service operation is carried out on this appliance.
• This manual should be left with the appliance.
• DO NOT MODIFY THIS APPLIANCE.
□ Isolate power and gas supply to re. □ Remove front glass and clean inside of glass. □ Remove fuel bed and brush o any soot. □ Clean electrode and pilot hood of any carbon build up and ensure correct
gaps between electrode and pilot hood
□ Remove burners and blow compressed air through the burner ports. □ Remove jets and clean injector hole with solvent. □ Vacuum any dust from the cavity that houses the fan and from the underside
of the re box around the valve and solenoids.
□ Test all joints for gas tightness. □ Reassemble heater and check that operating pressure is correct. □ Check glass sealing tape and replace if necessary. □ Check to make sure that ue system is intact and not in any way blocked. □ Trial heater with several start/stop cycles and trial fan-boost, ame eect only
and thermostat modes to ensure that all modes function correctly.
To access the product Dataplate, rst remove the replace glass, any fuelbed media, the burners and the rebox base. An access panel is located to the side of the bottom of the rebox, the dataplate is located underneath this access panel.
44
Page 45
S2 Error Codes
This gas re has been designed to show error codes to help explain and identify any fault situation that occurs. These codes will appear on the wireless remote control in the form of a large letter “E” with a number beside it. Codes can normally be reset by turning the heater o then on again at the wall.
The following table shows what each code means and possible ways to rectify the situa­tion. In the case of persistent or repeated shutdown errors, action must be taken immedi­ately to nd and repair the fault.
Error Code Suggested action
• Excess lint and dust build-up on the PCB / Controller.
• Possibly fascia panels installed incorrectly resulting in restricted air ow.
Electronics Over
Temp
Flame Failure or
Power Flue trip
Appliance Over
Temperature
Sensor Trip
• Ensure correct gaps are present around glass.
• Room air fans may be slowed or stalled. Remove rebox, check that fans are plugged in, cleaned, and free turning.
• (DX only) check that the duct fan is not reversed and blowing “into” the replace instead of out from the replace.
Note: This error has a permanent lock out and will require the unit to be reset after the initial error (turning the power to the re o “at the wall” then on again after a few seconds).
The re has tried to light three times and failed.
• Check gas supply and check other gas appliances to see if they are aected. If you have two separate LPG cylinders, switch over to the full bottle or contact your gas supplier. You may need to retry ignit­ing the re a few times after re-establishing gas supply.
• Check correct gas pressure to the appliance with all other appliances running.
• Check the electrode placement in relation to the pilot ame. Ensure it is well enveloped in ame as per the diagram in the installation instructions. Ensure no small coals have dropped onto the ignition electrodes between the burners.
• Ensure the electrode is not contacting any metalwork including the burners and has the correct air gap.
The bimetallic snap disk mounted on the exhaust collector box has tripped. The possible causes for this could include:
• Possibly fascia panels installed incorrectly resulting in restricted air ow.
• Room air fans may be slowed or stalled. Check that fans are plugged in, cleaned, and free turning
• The regulator being set too high resulting in excess heat build-up.
• The inlet ue not being connected and the appliance drawing warm air from the cavity. Check ues are securely connected at both ends.
• Incorrect Jetting
ACDEFGSERVICE
B
Page 46
A C D E F G SERVICE
B
Valve Solenoid
Check Failure
Remote Cannot
communicate
with re
Duct Air Over-
temp
The valve solenoids have failed the pre-ignition test. This is to detect a faulty valve solenoid. However, it is possible a wire has dislodged.
• Check that the connections to each solenoid are secure and in place. It may be that the connections on the ends of the wires need to be tightened a little (e.g. with a pair of pliers) to ensure a robust con­nection to the valve terminal.
• Disconnect and reconnect the rebox connectors ensuring they are rmly pushed into place.
• It could also be that one of the solenoids on the valve inside the re has failed. If this is the case the valve will need to be replaced.
The remote cannot communicate with the re. Reasons for this could include:
• The re being turned o “at the wall” i.e. a loss of power to the re or the remote is outside of its eective radio frequency range (too far away from the re). Typical remote range is 1m to 10m.
• Ensure there is power to the re by pressing the auxiliary on/o (red) button on the re, then press the on/o button on the remote to clear the error.
The hot air duct temperature sensor has detected excessive heat at the duct outlet.
• Ensure that there are at least TWO air vents installed and open in the same room as the replace
• Ensure the duct fan is operating when the replace is running. If not check that the duct fan cord is plugged into the replace.
Combustion Air
Flow Error
46
• Check the the ue fan is plugged in at both ends and operating correctly.
• Check whether the pressure switch is activating at startup (there is an orange indicator LED in the control tray). If not check the pressure switch electrical connection is correct.
• Check that the hoses are connected at both ends. Ensure the hoses are not kinked.
• Ensure the pressure switch is mounted vertically and the diaphragm is operational. The grey hose should be connected to the low pres­sure port and the translucent to the high pressure port
• Check that both ues are securely connected at both ends to the appliance and the powerue wall terminal and that the ue is not damaged
Page 47
S3 Cleaning the Fuel bed and Glass
ALWAYS USE GLOVES WHEN HANDLING THE FASCIA AND GLASS.
NEVER RUB THE FASCIA.
The outside of the fascias must only be cleaned with a clean damp cloth, dry o after cleaning. The high temp silver powder coating that is used on Escea fascia parts contains certain amounts of aluminium that when rubbed too hard will oxidise leaving a black smudge that cannot be removed. Always clean when cold.
This is a service procedure that will need to be carried out whenever soot builds up on fuelbeds and/or inside of glass. If soot build up becomes excessive or regular then one of the following actions may be required;
• Reset gas pressure, pressure may be too high;
• Reposition fuelbed, check with specic fuelbed instructions for details;
• Clear any blockage from primary aeration port of burner;
• Check ue tube is not damaged or disconnected.
• Check exhaust fan is operating and cowl is not blocked in any way.
Step 1: Remove fascia panel (if tted) by pulling it from
the wall.
Step 2: Removing the Glass
Using the supplied 3mm Allan Key (hex drive) unscrew the bolts around the glass retainer.
Take care that the glass and frame does not fall forward at this stage. Pull the top of the frame toward you slightly and lift the glass and frame out and away from the re. Ensure to hold on the glass, and take care that the glass does not fall from the frame. Place the glass & frame carefully aside - This is a two person lift.
ACDEFGSERVICE
B
Step 3: Take out fuel bed and gently clean away any soot from fuelbed with a soft hearth
brush. The burner tops and fuel media tray can be vacuumed to remove any excess mate­rial.
Step 4: Clean the inside and outside of glass with normal glass cleaning products. Use a
CLEAN DRY cloth only. Stubborn marks may be cleaned with a ceramic glass cleaner.
Step 5: Reinstate fuel media and glass and test run heater.
NOTE WHEN REPLACING THE GLASS:
When replacing the glass, note that the metal ange shown to the right must be on top (not the bottom), or the glass will not t correctly to the replace.
Page 48
S4 Checking Operating Pressure
A C D E F G SERVICE
B
WARNING: The regulator that is supplied with the re MUST NOT BE REMOVED. Removal of the regulator, or replacing it with one not intended for use with an Escea re, will void the limited appliance warranty.
By law, the original installer has supplied a test point prior to the appliance. With all gas appliances within the house running on full, including this DX1500, check the inlet pressure upstream of the appliance. It must conform with the table in section E8.
To check the operating pressure, with one burner removed only place your Manometer hose onto the jet spigot as shown. Ensure you place the manometer well away from the other burner as this will get hot.
48
Page 49
S5 Replacing a Remote Control
If the wireless control becomes lost or damaged, a new one can be ordered from any Escea retail agent. When you have the new remote, the following procedure needs to be followed to “teach” the remote to only communicate with that re.
1. Ensure the re and remote are set to “O ” (only the time is displayed on the remote).
2. While the remote is in its “OFF” mode with only the time showing on the display, press the MINUS, PLUS and FAN BOOST buttons simultaneously (as shown right) until the characters “03” light up on the display. Release the buttons and the remote will count down and display “GO”. The screen will then display all characters and should be reading 00. This will put the remote into test mode. Note: if the digits start counting then the remote is already paired.
3. Press and hold the – (minus) button until the two large temperature digits reading 00 start to ash slowly. Release the – (minus) button. The remote control is now ready to be addressed to the re.
4. Press and hold the red auxiliary on/o button on the replace for a minimum of ten seconds, or until the two large temperature digits start counting upwards from 00 to 99 repeatedly.
ACDEFGSERVICE
B
Note: Pressing the red auxiliary button on/o button will start the re. Once the remote control is counting the re can be turned o by pressing the red auxiliary button again.
5. Press the large power button in the middle of the remote control to exit the test mode and return to normal operation. The remote should only be displaying the time. Check the re will start using the remote control by pressing the large power button. Turn it o again using the remote control.
6. The re is now re-addressed to the remote control.
Page 50
S6 Replacing the burners
A C D E F G SERVICE
B
If a fascia is tted, remove this rst.
Using the supplied 3mm Allen Key (hex drive) remove the bolts around the glass retainer ensuring that the glass does not fall forward.
Pull the top of the frame toward you slightly and lift the glass and frame out and away from the re. Place the glass & frame carefully aside.
Remove all of the fuelbed, taking care not to damage any logs or media.
Remove the Fuelbed tray from the re box, by lifting one end up into the top corner and then out towards you. Take care not to scratch the rebox paint and lift out the burners.
50
Page 51
S7 Accessing the control tray
Remove the screws in the bottom and the inner side of the rebox as per shown.
Remove the ‘engine’ by lifting up and to the left. This is still connected internally to the gas hose and power cables. Place engine just to the left within rebox as shown.
ACDEFGSERVICE
B
S8 Removing the Circuit Board
Step 1: Remove the Pilot
cover and 2 jets circled to the right.
Step 2: Remove the 4 screws circled to the right from the inside and lift the cover up­wards to remove it. This will give you easier access to the circuit board.
Page 52
A C D E F G SERVICE
B
Step 3: Remove the clear plastic insulation cover from ontop of the circuit board by removing the screws circled below.
Step 4: Remove all 5 connections to the circuit board as highlighted below.
Step 5: Remove any screws securing the circuit board to the base and remove the circuit
board. Take care that the black spacers underneath the board stay in place until the board is replaced.
Replace the circuit board (if applicable) and reverse these steps to re-assemble the Engine.
52
Page 53
S9 Servicing the Horizontal / Vertical Powerue
Ensure the power to the Powerue is o by disconnecting the power to the appliance inside. If the appliance has been running, allow the Powerue to cool before attempting to service it.
Servicing a horizontal Powerue:
If the Powerue needs servicing, the fan can be accessed from the outside of the instal­lation for Horizontal termination, and accessed from within the roof space for Vertical termination.
Undo the screws on the outside of the Powerue box and seperate the two parts, giving you access to the fan inside.
Removing this plate gives complete access to the fan for servicing or replacement. Check that all the seals are still intact. Check the fan electrical terminals, motor and impellor are not corroded. Ensure there is no signs of leakage in or around the terminal.
When reassembling the powerue, line up the round silicon grommets with the outlet tube of the fan and push the cowl back into place. Ensure all seals are still in place and replace all of the screws to hold the cowl in the correct position.
Servicing a vertical Powerue:
If the vertical Powerue needs servicing the fan can be accessed without disturbing the nal twin walled ue length or roof terminal.
To gain access to the fan and electrical terminals remove the eight screws that hold the base of the Powerue to the lid, making sure to support the base while removing the screws. Note: When inspecting or working on the Powerue take care not to damage the two exible ue pipes that connect to the Powerue base.
ACDEFGSERVICE
B
Once the base has been removed clean away any dust or debris found and check that the fan electrical terminals, motor and impellor are not corroded. Also check for signs of leak­age in or around the Powerue.
When reassembling the Powerue support the base under the lid and replace the 8 securing screws. After assembly check that the two exible ue pipes are sealed and not damaged and that the twin walled nal ue length and roof terminal are still sealed.
Note : Take care not to trap any wires between the base and lid of the Powerue when reassembling.
Page 54
S10 Wiring Diagram
CON6
CON10
CON9
TRANSFORMER
240VAC - 18VAC
ISOLATING
VALVE & PILOT
MAIN BURNER
WIFI
MODULE
FLAME SAFETY CONTROLLER
FENWAL 35-61
i
-
con
OPTIONALWIRELESS NETWORK
Part No. 620278
W
V2
L
1
R
IND
PSW V1
GND S1
SPARK
ELECTRODE
ESCEA
CONTROLLER
MAINS FUSE (2A)
NETWORK
(RJ45)
NETWORK CABLE
FLUE FAN
FUSE (1.5A)
ROOM FAN
FLUE FAN
MAIN BURNER
FLOW CONTROL
i
A
N
N
N
E
Main Tray/Chassis
Connector (CN1)
Controller and Valve
Tray Schematic
A C D E F G SERVICE
B
54
Page 55
ACDEFGSERVICE
B
Loading...