ESAB PB-3 Plumbing Box Troubleshooting instruction

INSTRUCTIONS for
F-15-526
August, 1996
PB-3 PLUMBING BOX
P/N 34749
GENERAL
Plumbing Box Model PB-3 is designed for use with the robotic analog interface to control gas on/off and to de­tect torch coolant flow. Gas control is activated from the analog interface switching 1 10 vac to pins A and B of the plumbing box receptacle. Water flow is sensed via a flow switch on pins E and F of the plumbing box receptacle. Activation of the 24 vdc circuit is set for .25 GPM. Safety ground for the plumbing is connected to pin D. No con­nection is made on pin C. Provisions have been made for the user to install a gas flow/pressure sensor if de­sired (See schematic diagram). Due to the inherent sen­sitivity problems with such devices, it is up to the user to determine and install a suitable device for his particular application.
INSTALLATION
1. Secure the plumbing box in a suitable location us­ing the mounting brackets provided. All plumbing box interconnections are clearly marked for ease of as­sembly . See FIG. 1.
2. Connect the PB-3 plumbing box to the analog inter­face by means of the 6 pin control cable assembly . The control cable is installed between the analog interface receptacle J4 and the plumbing box re­ceptacle marked Weld Interface. Two control cable lengths are available;
4.5 ft. Part Number 34199 25 ft. Part Number 34845
3. Connect the gas supply from a flowmeter/regulator to the gas in fitting on the plumbing box. The sys­tem is designed to deliver adequate flow for all typi­cal welding applications. Maximum recommended delivery pressure is 50 psi.
4. Connect the welding torch gas “IN” hose to the gas “OUT” fitting on the plumbing box.
5. Connect the coolant supply line to the water “IN” connection in the plumbing box.
6. Connect the welding torch coolant (water) “IN” hose to the water “OUT” connection on the plumbing box.
Left Side View
FIGURE 1 - CONNECTIONS
Be sure this information reaches the operator. Y ou can get extra copies through your supplier.
Right Side View
Figure 2 - Schematic Diagram
Figure 3 - Wiring Diagram
Part # Qty. Description
N
F-15-526 8/96
34749 Plumbing Box, PB-3 636386 1 Solenoid Valve 110 vac 634772 1 Connector, Receptacle 6 pin 950001 1 Flow switch, coolant, .25 GPM 93W21 1 Terminal Strip, 6 position 58V58 2 Bulkhead fitting, gas B size 5/8"-RH 58V75 2 Bulkhead fitting, water B size 5/8"-LH 2061361 1 Warning Label
Table 1 - Replacement Parts