ESAB AC/DC Digital Meter Kit for Heliarc 252 Power Source Troubleshooting instruction

INSTRUCTIONS for
AC/DC DIGITAL METER KIT
F15-289
January, 1996
Item No. 36226
for Heliarc 252 Power Source
INSTALLATION
To install Meter Kit, proceed as follows:
1. Remove the two (2) screws from the upper corner of the control panel on the power source and open the control panel.
2. Remove the black plastic hole plug from the Volt/ Amp (V/A) switch mounting hole.
3. Install the meter panel assembly from the rear of the control panel by inserting the V/A switch into the hole in the control panel and securing the PC
board with two (2) #4-40 screws and washers provided.
4. Place the black rubber switch seal on the switch from the outside of the control panel and tighten.
5. Connect the 16-pin ribbon cable provided be­tween connector “P2” of the power source main control PC board and connector “P1” of the meter PC board.
6. Close the power source control panel and secure with the two (2) screws previously removed.
OPERATION
1. With the V/A switch in the “V” position, the meter will read “Actual” output voltage.
2. With the V/A switch in the “A” position, the meter will read “Pre-set” amps until the arc is struck. Then it will read “Actual” amps.
Figure 1 Replacement Parts - Meter Kit 36226
Be sure this information reaches the operator.
You can get extra copies through your supplier.
F15-289 09 / 2004
Loading...