ERICO TDX Series Flush User Manual

Flush Cover Plate
Loosen front screws
FIGURE 3
Flush Mounting Instructions
PREPARATION
DANGER: Electrical shock or burn hazard. Installation
can result in fatal electrocution or severe burns.
These installation instructions apply specifically for the Flush Mount installation of the TDX range of Surge Protectors. These instructions are to be used in conjunction with the installation instructions for the TDX product.
To simplify installation it is recommended to use a short (<6”) flexible conduit to connect the TVSS nipple to the electrical panel. The TVSS is then mechanically fixed by connecting the TVSS to the Flush Cover Plate, which in turn is fixed to the drywall.
TDX
on TDX and attach FCP mounting brackets
FIGURE 1
Alternatively the TVSS can be mechanically fixed via its flanges and/or nipple. However, care is required to ensure the TVSS is positioned so the front is flush with the outer drywall.
This kit includes: a) 1 x Flush Cover plate (FCP)
b) 2 x Mounting Brackets c) 4 x FCP Mounting Screws d) Instructions
Quick Installation
1. Disconnect and lockout electrical power to the electrical panel
(load center / panelboard / circuit breaker box) where the TDX/FCP is to be installed. Follow all applicable electrical codes and procedures.
2. Loosen front screws in TDX end plates as shown in Figure 1.
Apply FCP Mounting Brackets and retighten TDX screws.
3. Attach flexible conduit (not included in FCP kit) to the TDX unit.
4. Mark and cut out section of drywall allowing approximately 1/2"
clearance around TDX enclosure and attached Flush Cover Plate Mounting Brackets.
5. Align FCP with drywall opening, mark locations of drywall
anchors (not included) and install anchors per manufacturer’s instructions.
Electrical Panel
Drywall
FIGURE 2
6. Insert TDX into drywall cutout and connect flexible conduit to
electrical panel (Figure 2).
7. Attach the Flush Cover Plate to the TDX unit using the 4
Mounting Screws provided (Figure 3).
8. Secure the Flush Cover Plate to the drywall using the drywall
anchors.
9. Complete electrical TVSS connection as per TVSS instructions.
2002 ERICO Inc, 34600 Solon Rd, Solon, OH 44139 Page 1 of 1 Doc: HBCR1611, Rev: 1, Date: JULY 17, 2002
Loading...