Equalizer NS12TI, NS15TI, NS20TI Operator's Instruction Manual

OPERATOR INSTRUCTION MANUAL
NS12TI NS15TI NS20TI
EQUALIZER INTERNATIONAL LTD
www.equalizerinternational.com
INTEGRAL HYDRAULIC NUT SPLITTERS
OPERATOR INSTRUCTION MANUAL
IM_NS12_15_20TI_Rev03_A4
NS12TI, NS15TI, NS20TI
INTEGRAL HYDRAULIC NUT SPLITTERS
2
CONTENTS
1. INTRODUCTION
2. TOOL SAFETY
2.1 GENERAL SAFETY
2.2 PERSONNEL COMPETENCY
2.3 DISCLAIMER
2.4 DEFINITION OF TERMS
2.5 HAZARDS
3. TOOL OPERATION
3.1 GENERAL GUIDANCE
3.2 TOOL SELECTION
3.3 HYDRAULIC TOOL OPERATION
3.4 HANDLE
3.5 SAFETY LANYARD
3.6 POSITIONING THE TOOL
4. TOOL MAINTENANCE
4.1 INSPECTION
4.2 CLEANING
4.3 CUTTING TIP REPLACEMENT
4.4 MAINTENANCE
4.5 STORAGE & TRANSPORTATION
4.6 OPERATING CONDITIONS
4.7 SUB-SEA USAGE
5. TECHNICAL SPECIFICATIONS
5.1 NS12TI KIT CONTENTS
5.2 NS12TI TOOL DIMENSIONS
5.3 NS15TI KIT CONTENTS
5.4 NS15TI TOOL DIMENSIONS
5.5 NS20TI KIT CONTENTS
5.6 NS20TI TOOL DIMENSONS
6. TROUBLESHOOTING
6.1 NS12TI/NS15TI/NS20TI TROUBLESHOOTING
7. REGULATORY INFORMATION
7.1 REGISTERED HEAD OFFICE
8. PARTS LISTS & SERVICE KITS
22/08/2017
OPERATOR INSTRUCTION MANUAL
IM_NS12_15_20TI_Rev03_A4
NS12TI, NS15TI, NS20TI
INTEGRAL HYDRAULIC NUT SPLITTER
3
2.
TOOL SAFETY
2.1
GENERAL SAFETY
These instructions cover the safe operation and maintenance of THE EQUALIZER NS12TI, NS15TI and NS20TI NUT SPLITTER tools. The use of these tools should be as part of a broader task-based risk assessment, which should be carried out by the operation supervisor or other competent person.
Failure to comply with the safety information contained within this manual could result in personal injury or equipment damage. Read all instructions, warnings and cautions carefully, and follow all safety precautions.
The safety of the operator, any assisting personnel and the general public is of paramount importance. Always work in accordance with applicable national, local, site & company-wide safety procedures.
2.2
PERSONNEL COMPETENCY
Only personnel deemed competent in the use of mechanical and hydraulic equipment should use these tools.
2.3
DISCLAIMER
Equalizer cannot be held responsible for injury or damage resulting from unsafe product use, lack of maintenance or incorrect product and/or system operation. If in doubt as to the safety precautions and applications, contact Equalizer using the contact details at the back of this manual.
1.
INTRODUCTION
The Equalizer™ NS Range of tools has been developed to assist in the removal of corroded, seized or damaged nuts.
The NS tools have a shrouded cutting head to contain the split nut and have been developed to increase the access
to tight ange joints. The tools have no exposed nger
pinch points and are supplied with a swivel handle and a safety lanyard as standard.
It is essential that the users familiarise themselves with the contents of this manual prior to using the tool.
This manual contains information for the following tools:
NS12TI Integral Hydraulic Nut Splitter
NS15TI Integral Hydraulic Nut Splitter
NS20TI Integral Hydraulic Nut Splitter
OPERATOR INSTRUCTION MANUAL
IM_NS12_15_20TI_Rev03_A4
NS12TI, NS15TI, NS20TI
INTEGRAL HYDRAULIC NUT SPLITTERS
4
WARNING: Applying pressure to a damaged hose may cause it to rupture.
WARNING: Immediately replace worn or damaged parts. Use only genuine Equalizer parts from approved distributors or service centres. Equalizer parts have been engineered
and manufactured to be t-for-purpose.
DANGER: To minimise risk of personal injury keep hands and feet away from the tool and workpiece during operation.
WARNING: Always wear suitable clothing and Personal Protective Equipment (PPE). Do not handle pressurised hoses; escaping oil under pressure can penetrate the skin, causing serious injury. Seek medical attention immediately if oil penetration is suspected.
WARNING: Only pressurize complete and fully connected hydraulic systems. Do not pressurize systems that contain unconnected couplers.
CAUTION: Do not lift hydraulic equipment by the hoses or couplers. Use only the designated carrying handles.
CAUTION: Lubricate tools as directed in this manual prior to operation. Use only approved lubricants of high quality , following the lubricant manufacturers instructions.
CAUTION: Only use the designated anchor
point for xing the safety lanyard. Do not attach
the safety lanyard to the plastic handle.
DANGER: Care should be taken when using the safety lanyard to avoid entanglement with body parts.
The vibration total value to which this tool is
subjected does not exceed 2.5 m/s
2
.
2.4
DEFINITION OF TERMS
A CAUTION is used to indicate correct operating or maintenance procedures and practices to prevent damage to, or destruction of equipment or other property.
A WARNING indicates a potential danger that requires correct procedures or practices to avoid personal injury.
A DANGER is only used when your action or lack of action may cause serious injury or even death.
DO: an illustration showing how the tool should be used.
DON’T: an illustration showing an incorrect way to use a tool.
2.5
HAZARDS
WARNING: ensure all hydraulic components
are rated to a safe working pressure of 700 bar (10 000 psi).
WARNING: Do not overload equipment. The risk of hydraulic overloading can be minimised by using the Equalizer Hand Pump, which has a factory-set safety valve preventing the safe
working pressure being exceeded.
If alternative hydraulic pumps are used, ensure that there are adequate systems to limit the working pressure to 700 bar (10 000 psi).
CAUTION: ensure components are protected
from external sources of damage, such as excessive heat, ame, moving machine parts,
sharp edges and corrosive chemicals.
CAUTION: Take care to avoid sharp bends and kinks in hydraulic hoses. Bends and kinks can cause severe back-up pressure and cause hose failure. Protect hoses from dropped objects; a sharp impact may cause internal damage to hose wire strands. Protect hoses from crush risks, such as heavy objects or vehicles; crush damage can cause hose failure.
OPERATOR INSTRUCTION MANUAL
IM_NS12_15_20TI_Rev03_A4
NS12TI, NS15TI, NS20TI
INTEGRAL HYDRAULIC NUT SPLITTER
5
If the specication of the nut is unknown then a vernier
calliper or measure tape should be used to determine the Across-Flats (A/F) size of the nut to be split and the correct tool.
A/F
3.
TOOL OPERATION
3.1
GENERAL GUIDANCE
The Equalizer™ Nut Splitter Tools have been designed to
t a range of nut sizes and grades and the correct tool
should be selected prior to commencing work by following the instructions in this section.
CAUTION: A thick grease should be applied to the Cutting Tip before every cut. This will ease the splitting operation, prolong the life of the Cutting Tip and limit the risk of sparking and debris projectiles.
3.2
TOOL SELECTION
CAUTION: It is important that the correct tool is selected for each nut and the correct Cutting Tip is used for each tool. Each tool in the Nut Splitter range comes with the appropriate Cutting Tips for that tool. Please refer to the table below to choose the correct tool for your application.
NS TOOLS
UNC HEAVY HEX
STUD SIZE
UNC HEAVY
NUT A/F SIZE
METRIC
STUD SIZE
METRIC
NUT A/F SIZE
NS12
1/2”, 5/8”
0.88” to 1.06”
M12, M16, M20
19 mm to 30 mm
NS15
3/4”, 7/8”
1.25” to 1.44”
M16, M20, M22
24 mm to 32 mm
NS20
7/8”, 1”, 1-1/8”
1.44” to 1.81”
M24, M27, M30
36 mm to 46 mm
NS36
1-1/4”, 1-3/8”,
1-1/2”, 1-5/8”
2” to 2.56”
M33, M36, M39, M42
50 mm to 65 mm
NS50
1-5/8”, 1-3/4”,
1-7/8”
2.56” to 2.94”
M42, M45, M48
65 mm to 75 mm
OPERATOR INSTRUCTION MANUAL
IM_NS12_15_20TI_Rev03_A4
NS12TI, NS15TI, NS20TI
INTEGRAL HYDRAULIC NUT SPLITTERS
6
USING THE NS12TI/NS15TI/NS20TI
Position the tool as per Section 3.6.
When the pump is operated the piston and the Cutting
Tip will advance. Ensure the tool is at against the ange
and the Cutting Tip perpendicular to the nut throughout the operation. Slowly actuate the Nut Splitter to advance
the Cutting Tip against a at of the nut and increase the
pressure until the nut splits.
Releasing the pump will depressurise the cylinder and cause it to retract under the force of its internal spring.
It is likely that the nut will require a second split to fully remove the nut from the stud. Ideally a second split
should be carried out at 180° to the rst cut, splitting the
nut in half to enable removal.
After the nut has been split, always check the Cutting Tip for damage and replace if required before positioning the tool on another nut.
CAUTION: Split nuts often have sharp edges and should be handled with great care.
3.4
HANDLE
The handle can be swivelled around the central axis of the
tool, to improve access to the nut and allow the tool to be easily held in the vertical or horizontal orientation.
3.5
SAFETY LANYARD
The NS tools are supplied with a secure anchor point and a safety lanyard. The safety lanyard should be used to minimise the risks associated with the tool dropping.
Attach one end of the safety lanyard to the tool using the supplied shackle. The other end of the safety lanyard
should be xed to a secure point close to the work-site
using an appropriate shackle.
Avoid using the safety lanyard as a means for picking up
or carrying the tool. Do not x the safety lanyard to the
handle.
3.3
HYDRAULIC TOOL OPERATION
Prior to operation, ensure the air-vent in the integr al hand pump is not obstructed. Any obstruction in the air-vent can cause a vacuum in the system which can limit the cylinder’s travel.
The NS12TI, NS15TI and NS20TI Nut Splitter use an integral hydraulic pump to drive the cylinder and advance the Cutting Tip to split the nut. The hydraulic pressure is applied using the integrated hand pump, enabling accurate control of the force applied.
The integral hand pump has a control lever which allows the user to select advance (+) or retract (-)
ACTUATING THE NS12TI/NS15TI/NS20TI
When advance (+) is selected, pumping the handle will advance the piston with the Cutting Tip and split the nut.
RETRACTING THE NS12TI/NS15TI/NS20TI
Selecting Retract (-) will depressurise the cylinder and cause it to retract under the force of its internal spring. The handle doesn’t need to be pumped to retract the cylinder.
OPERATOR INSTRUCTION MANUAL
IM_NS12_15_20TI_Rev03_A4
NS12TI, NS15TI, NS20TI
INTEGRAL HYDRAULIC NUT SPLITTER
7
The anchor point and safety lanyard hav e been engineered to safely sustain a drop over the full safety lany ard length. It is recommended that all parts are inspected following a drop incident, as damage may compromise the safety of the tool.
CAUTION: Only use the designated anchor
point for xing the safety lanyard. Do not attach
the safety lanyard to the plastic handle.
DANGER: Care should be taken when using the safety lanyard to avoid entanglement with body parts.
3.6
POSITIONING THE TOOL
Prior to splitting the nut, an assessment should be carried out to determine the most appropriate positioning of the tool around the nut.
Please see next page for more information.
OPERATOR INSTRUCTION MANUAL
IM_NS12_15_20TI_Rev03_A4
NS12TI, NS15TI, NS20TI
INTEGRAL HYDRAULIC NUT SPLITTERS
8
CAUTION: It is recommended that suitable hearing protection, i.e. ear defenders or ear plugs are worn.
CAUTION: It is recommended that a face shield or suitable eye protection, i.e. safety glasses or goggles are worn.
Place the tool on the nut with the at surface of the cutting head at against one of the nut ats and the Cutting Tip
centered. Ensure the bottom face of the cutting head sits
at on the same surface that the nut is seated.
OPERATOR INSTRUCTION MANUAL
IM_NS12_15_20TI_Rev03_A4
NS12TI, NS15TI, NS20TI
INTEGRAL HYDRAULIC NUT SPLITTER
9
4.3
CUTTING TIP REPLACEMENT
Ensure the correct Cutting Tip is tted to the tool and
has been checked for damage. Some minor bluntening is acceptable, but cracked or chipped Cutting Tips should be replaced.
The Cutting Tip is retained in the piston by the tip retention
screw. Unscrew the tip retention screw with a hex-key and pull the Cutting Tip out to replace. Do not apply excessive
force when inserting the Cutting Tip into the tool. If the
Cutting Tip does not come out easily, slightly extend the
piston to gain better access. When replacing the Cutting Tip, the tip retention screw and alignment screw should also be replaced every time.
TIP RETENTION SCREW
SMALLER HEX KEY
CUTTING TIP
CAUTION: Ensure the retention grub screw is fully inserted in the piston before actuating the tool.
ALIGNMENT SCREW
LARGER HEX KEY
4.
TOOL MAINTENANCE
4.1
INSPECTION
A thorough inspection should be carried out prior to usage, storage or transportation to ensure the completeness and condition of the tool.
Inspection should include:
visual inspection of the outer parts of the tool, checking for obvious damage, degradation or missing parts
visual inspection of the Cutting-Tip (this may require tool actuation)
Cleaning and servicing should be undertaken as required prior to the tool being used, stored or transported.
4.2
CLEANING
To lightly clean the tool, wipe gently with a damp cloth.
If more thorough cleaning is required (for example
following immersion in water) carry out the following cleaning procedure:
strip the tool down, observing the schematics in section 8
clean the components using detergent, following the manufacturer’s guidelines
rinse the components to remove traces of detergent
dry the components thoroughly
Inspect, service and lubricate the tool immediately after the cleaning process.
OPERATOR INSTRUCTION MANUAL
IM_NS12_15_20TI_Rev03_A4
NS12TI, NS15TI, NS20TI
INTEGRAL HYDRAULIC NUT SPLITTERS
10
4.6
OPERATING CONDITIONS
Minimum Cutting Tip Contact Temperature: -20 °C
Maximum Cutting Tip Contact Temperature: 70 °C
4.7
SUB-SEA USAGE
Using Equalizer Integral Hydraulic Nut-Splitters
The NS12TI/NS15TI/NS20TI are actuated by means of single-acting spring-return hydraulic cylinder and can be used sub-sea providing the following actions are taken:
The pump release valve is fully opened and remains open until the tool has descended to the working depth. This will allow the pressure to equalise.
The tool is actuated via the hand-pump by a diver.
Upon completion of works the release valve is left in
the fully-open position until the tool has ascended to the surface.
The tool and pump are stripped-down, cleaned and lubricated immediately to minimise corrosion.
4.4
MAINTENANCE
Replace missing, worn or damaged parts. Use only genuine Equalizer parts from approved distributors or service centres. Equalizer parts have been engineered and
manufactured to be t-for-purpose.
Do not apply excessive force when inserting the Cutting
Tips into the tool. Always replace the tip retention screw and alignment screw when replacing the Cutting Tip.
The alignment screw in the side of the cutting head sits in the slot of the piston and keeps the Cutting Tip aligned. This screw should not be fully tightened; back off the alignment screw by 1/4 turn after insertion.
If topping up or replacing hydraulic oil as part of a service, use only premium quality hydraulic oil of the grade 15 cSt.
A thick grease should be applied to the Cutting Tip before every cut. This will ease the splitting operation, prolong the life of the Cutting Tip and limit the risk of sparking and debris projectiles.
4.5
STORAGE & TRANSPORTATION
Equalizer tools should be stored in a cool dry place. Tools should always be cleaned, serviced and lubricated prior to storage. Ensure that tools are stored in their designated packing cases.
OPERATOR INSTRUCTION MANUAL
IM_NS12_15_20TI_Rev03_A4
NS12TI, NS15TI, NS20TI
INTEGRAL HYDRAULIC NUT SPLITTER
11
5.
TECHNICAL SPECIFICATIONS
5.1
NS12TI KIT CONTENTS
Product Code: NS12TISTD
1 x NS12TI Nut Splitter 1 x Spare Cutting Tip 1 x Spare Tip Retention Screw 1 x Spare Alignment Screw 1 x Hex key for Tip Retention Screw 1 x Hex key for Alignment Screw 1 x Safety Lanyard 1 x Instruction Manual 1 x Carry Case
580 mm x 350 mm x 180 mm (22.8” x 13.8” x 7.1”)
Tool only Weight: 5.8 kg (12.8 lb) Gross Kit Weight: 9.0 kg (20.0 lb)
5.2
NS12TI TOOL DIMENSIONS
350 mm
(13.8”)
152 mm
(6.0”)
81 mm
(3.2”)
5.3
NS15TI KIT CONTENTS
Product Code: NS15TISTD
1 x NS15TI Nut Splitter 1 x Spare Cutting Tip 1 x Spare Tip Retention Screw 1 x Spare Alignment Screw 1 x Hex key for Tip Retention Screw 1 x Hex key for Alignment Screw 1 x Safety Lanyard 1 x Instruction Manual 1 x Carry Case
580 mm x 350 mm x 180 mm (22.8” x 13.8” x 7.1”)
Tool only Weight: 6.3 kg (13.9 lb) Gross Kit Weight: 9.4 kg (20.7 lb)
Loading...