EPS EF90H-CLR, EF100H-CLR, EF120H-CLR User Manual

DarkStar® UST eFinity Series
EDGE FREE® Ultra-short throw Fixed Frame Screen
USER’S GUIDE
The DarkStar® UST Series is an ultra-short throw fixed frame projection screen that uses EPV’s EDGE FREE® technology. It is designed for Ultra-Short Throw Projectors only, for use in environments where ceiling light cannot be entirely controlled. It includes an LED backlight kit and an ultra-thin bezel to further enhance the frame appearance.
Screen Maintenance
Dust, dirt and scratches on the projection screen surface will affect the quality and performance of the projection image. For optimal results we advise to pay attention to the following instructions.
1) The screen surface has a horizontal lens structure. DO NOT wipe the screen up and down or in a circular motion.
Wipe from left to right only.
2) Please clean the dust on the screen surface with a soft brush or microfiber cloth (rough towel or cloth may damage the screen’s surface).
3) Gently wipe the screen with a moistened microfiber cloth with mild soap diluted in water.
Notes
The following precautions should be followed at all times to avoid damaging the material, which is not covered under warranty.
Don’t touch the screen material to avoid leaving fingerprints. Use gloves when handling the material. Don’t scratch the material, as it will leave permanent markings on the screen’s surface. Don’t point to the screen material with a fingertip or other sharp objects to prevent damage to the
material.
Don’t use acetone, benzene, alcohol and any other organic solvents to clean the screen material. Using
such chemicals will permanently damage the screen.
Rev. 04/27/17 DR www.epvscreens.com 1
1. Frame and Edge Trim Parts List
Qty
item
Qty
item
a.
b.
c.
d.
e.
f.
g.
h.
i
j.
k.
l.
m.
n.
E.
F.
F.
D.
B.
Part
A.
Part
B.
Part
C.
2 pcs
Main Frame Parts
vertical frame
½ horizontal frame
½ horizontal frame
Part
D.
Part
E.
Part
F.
2 pcs
Edge Trim Parts
Rev. 04/27/17 DR www.epvscreens.com 2
2. Hardware Parts List
Item
Parts List Qty
EF90H-CLR
EF100H-CLR
EF120H-CLR
a.
c.
M4x6 Screws
66
66
66
e.
Spring
84
92
104
f.
Top wall brackets
2 2 2
6 6
h.
Hollow Wall anchors
6 6 6
2 2
j.
Angle cover
4 4 4
k.
LED light strip clip
8 8 8
l.
Center Support Bar
1 1 1
m.
white gloves
2 2 2
n.
b.
Center Joints (1) 4 4 4 Elbow Joints (2) 8 8 8
d.
g.
i.
Spring Hook 2 2 2
Φ5x50 Wall Screws 6
Bottom wall brackets 2
Extension spring 4 4 4
Frame Assembly
Step 1: Place the soft padded EPE sponge on a clean area on the ground where the screen will be assembled. Step 2: Position the pieces of the frame on the EPE sponge in the arrangement shown below
Step 3: Remove the tape on all frame ends before assembling the frame.
Step 3: Insert the center joint (a) connectors into one-half of the horizontal frame (b/c) and secure with the
M4x6 screws (c).
Rev. 04/27/17 DR www.epvscreens.com 3
Step 4: Insert the springs (e) into the grooves of the frame. The spring’s hooks should be facing the front side
Model Number
EF90H
EF100H
EF120H
of the frame. For the correct amount of springs to place into the frame, please refer to the table listed below.
Note: The springs are pre-installed into the grooves of the frame.
Step 5: Connect the elbow joints (b) to the top and bottom sections of the vertical frame. Once inserted, connect
the vertical sections to the horizontal frame sections. Make sure all holes are in alignment and the frame pieces are flush (no gaps). They should form perfect right angles.
Step 6: Secure the elbow joints by fastening them with M4x6 screws (c), 4 at each corner.
Qty
A(Spring) B(Spring)
27 29 35 15 17 21
Rev. 04/27/17 DR www.epvscreens.com 4
Screen Material Installation
Back Side
Please read this important note before proceeding with the installation process of the material.
Before handling the DarkStar® UST material, put on the supplied pair of white gloves to avoid leaving fingerprint marks, dust or hand oil on the material’s surface. The DarkStar® UST material is very delicate and should be handled with extreme care. Do not allow the material to fold or bend. Failu r e to fo llo w instructions will result in permanent damage to the screen material, which is not covered by warranty.
Step 7: It is strongly recommended for two people to unroll the material to prevent it from rolling unevenly. Each person holds one end of the roll. Slowly unroll the screen in a clockwise direction.
Step 8: Put on the white gloves (m) and carefully unroll the screen material on a clean surface from the roller to the other side as shown below. The back side (black) of the screen material should be placed upwards.
Step 9: Carefully and gently place the assembled frame on top of the screen material. Make sure to not allow the angle edge of the frame to come in direct contact with the screen material to avoid puncturing it.
Note: Make sure all of the corners of the frame are aligned according to the markings on the back of the
material as indicated below.
Step 10: Use the spring hook (d) to attach the spring (e) to the grommet hole located on the screen material’s outer edge in the following order. Attach all four corners first (1) and (2) on the outer grommet holes. Then attach the Extension spring (n) on the two inner grommet holes. See illus tration below.
Rev. 04/27/17 DR www.epvscreens.com 5
After all four corner s have b een attache d , proceed to attach the vertical sides of the material. Begin in the cen ter
To avoid ripples forming in the material it is imperative that all of the corners are properly wrapped around
the edges as illustrated in the check mark diagrams.
4
5
4
5
7
7
8
8
6 6 3
3
2 1 2
1
Yellow label
Yellow spring
and move towards the corners from (3) to (4) to (5). Lastly, attach the horizontal sides of the material by starting with the center of the material and mak e y our way towards the corners from (6) to (7) to (8).
Note: Please make note of the yellow label and spring in the center of the frame. This is an indicator to start the screen material instal la tion proce ss from the middl e are a of the frame.
Note (after all springs have been attached): Correct material installation – Corners of the screen material are properly wrapped around the corner edges of
the frame and material is evenly tensioned and flat, creating a nicely taut surface.
Incorrect material installation –The corners of the s cree n m aterial are not properly wrapped along the edge of the frame leaving the material with unbalanced tension and an uneven finish. To correct, detach springs from material at the corner(s) where material does not lie flat along the edge of the frame, reposition the material so that it lies flat and wraps along the edge of the frame as much as possible, and reattach springs to the materi al.
Rev. 04/27/17 DR www.epvscreens.com 6
Center Support Bar
Step 11: Insert the Center Support Bar (i) into the upper top groove on the back of the frame with the bot to m
end near the approximate center point of the frame and rotate it in at an angle so that both ends of the bar are in alignment with the groove.
Diagonal Models 150” an d below use 1 x Center Sup port Bar
Pre-check prior to Edge Trim Installation
Correctly distinguish the top and bottom of the DarkStar® UST material. Place the assembled screen on the ground. Look down on the screen. If the material looks white/gray as shown below then it is correct.
If the material looks black as shown below, then it is upside down.
Rev. 04/27/17 DR www.epvscreens.com 7
Edge Trim
1
1
2
2
2
Step 12: Place the Edge Trim over each end of the frame and secure with M4x6 screws (c), Start with the
center points first, then the rest of the corners as shown.
2
Step 13: Install the angle cover (j) on each corn er of the frame and install the LED light strip to hold down the angle cover.
Note: Make sure the edge trim with the EPV logo does not get installed on the bottom.
Then insert the LED light clip (l) to hold the LED light strip in place.
Please use the following installation instructions to obtain superior optical performance from EPV’s innovative DarkStar® UST screen materi al .
The DarkStar® UST is exclusively for table-mounted ultra-short throw projectors as illustrated in the Example 1 diagram. Overhead placement or a standard projector will make the image very dark, on account of the screen’s absorbent layer deflecting light that is not aligned with its reflective angle.
Rev. 04/27/17 DR www.epvscreens.com 8
Notice to Install e r:
Please use the following installation instructions to obtain superior optical performance from the Retro-Reflective A LR (Am bi ent Light Reject ing) Screen.
Example 1: Proper Projector Installation
Example 2: Improper Projector Type/Installation
Note: Improper installation will result in light loss and produce a dark image. This is due to the
projector’s light reflecting in the wrong direction.
Images are not up to scale and are for illustration purposes only.www.Elitescree
Rev. 04/27/17 DR www.epvscreens.com 9
Wall Installat ion
Step 14: Measure the overall length and height of the frame and drill holes for the top brackets. Line up the wall
brackets with the drilled holes on the installation location and screw them in using a Phillips screwdriver. If not installing into a structural wood stud, use a hollow wall anchor then screw in the M5x50 wood screws with a screwdriver. Make sure the brackets are lev eled.
Step 15: Position the fixed frame screen onto the top wall bra ck ets as shown below and push down at the center of the top of the frame to secure.
Step 16: With the frame slightly tilted outward; connect the bottom brackets onto the bottom groove of the frame. Then secure them by screwing onto the wall.
For Technical Support or an Elite Prime Vision contact in your area, visit
Rev. 04/27/17 DR www.epvscreens.com 10
www.epvscreens.com
Loading...