Enviro C60 Installation Reference Manual

C60 FIREPLACE
B
Installation Reference Guide
REFER TO OWNER’S MANUAL FOR SPECIFIC INSTALLATION REQUIREMENTS AND ADDITIONAL PRODUCT INSTRUCTIONS
Minimum Framing Dimensions
1” (25mm) Clearance from framing studs to venting
STEEL STUD
Depth 20” 508 mm
Width 71” 1803 mm
Header Height 38” 965 mm
Enclosure Ceiling 72” 1829 mm
Note: Vent size 5/8
20”
(508mm)
Clearance to Combustibles
A - Finishing edge to side wall 7" 229 mm
B - Minimum clearance to enclosure ceiling 72" 1829 mm
72”
(1829mm)
38”
(965mm)
71”
(1803mm)
C - Minimum clearance to mantel height See Chart See Chart
D - Front of door to edge of floor protection 0" 0 mm
A
C
E
D
Non-Combustible Board
1 2 3 4 5 6 7 8 9 10 11 12 13 14
MANTLE HEIGHT
MANTLE DEPTH
Minimum Mantle Clearances
8” MANTLE
4”MANTLE
47”
46”
45”
44”
43”
42”
41”
39”
40”
12” MANTLE
Specications
7
1 4
"
186mm
62"
1575mm
65"
1651mm
9
1 4
"
235mm
16
1 2
"
422mm
12
1 4
"
308mm
4"
103mm
9
1 4
"
232mm
7"
176mm
3
1 4
"
81mm
Gas Inlet Bottom (Optional)
70
3 4
"
1797mm
17
3 4
"
453mm
9"
231mm
15"
378mm
Gas Inlet Right Side
Specications
Dimensions:
7
1 4
"
186mm
30
3 4
"
779mm
62"
1575mm
65"
1651mm
9
1 4
"
235mm
16
1 2
"
422mm
12
1 4
"
308mm
4"
103mm
9
1 4
"
232mm
38"
965mm
3"
73mm
9
1 4
"
232mm
7"
176mm
3
1 4
"
81mm
20"
507mm
1 2
"
13mm
70
3 4
"
1797mm
17
3 4
"
453mm
9"
231mm
15"
378mm
Electrical Inlet Left Side
Gas Inlet Right Side
Specications
7
1 4
"
186mm
30
3 4
"
779mm
62"
1575mm
65"
1651mm
9
1 4
"
235mm
16
1 2
"
422mm
12
1 4
"
308mm
9
1 4
"
232mm
7"
1
20"
70
3 4
"
1797mm
17
3 4
"
453mm
9"
231mm
15"
378mm
Gas Inlet Right Side
Specications
1797mm
9"
4"
103mm
9
1 4
"
232mm
"
Gas Inlet Right Side
20"
Fireplace Dimensions
Placement
Framing
COMBUSTIBLE
56 1/2”
MetalStud
Concrete Board
Drywall
Sidewall
7”
72
NON COMBUSTIBLE
Minimum Venting Requirements
Minimum venting is shown in figure 20. the framing height to the
center of the thimble is 62”. Minimum venting must include a 24”
vertical section and a 90 degree elbow which is then terminated
horizontally. For a vertical termination please follow the vent
pipe manufacturer’s installation instructions for vertical vent
termination framing. A minimum of 1 in. (25 mm) clearance on
all sides of the vertical vent pipe must be maintained. For every
12” of horizontal run there must be a 1/4” of rise. 1” of clearance
between framing and venting must be maintained at all times. 2”
above the venting and 3” above an elbow.
509mm
62"
[1575mm]
*Do not use two 12” vent sections or this dimension will not work.
Use one 24” section.
15"
378mm
453mm
3
"
17
4
5 3/16
13 3/4”
231mm
20"
507mm
1
"
2
13mm
10”
3
"
70
4
Mantel Projections
Mantel graph dimensions are measured from the bottom of the
replace, if you wish to reference the mantel height from the
tiling edge subtract 15 inches (381mm) from the mantel height
depicted on the graph. If you plan to install a TV above your
replace refer to the appropriate section of the owner’s manual
for available options. It is acceptable to install a combustible
mantel over top of the non-combustible board. If you are
activating the Cool Surface System you are eligible to subtract
12” (305mm) from the mantel height shown in this diagram.
Loading...
+ 4 hidden pages