enphase ENV-S-WM-23, Enphase Envoy-S Metered Quick Install Manual

QUICK INSTALL GUIDE
Installing the Enphase Envoy-S Metered
Multiphase for Europe | Multiphase +DRM for Australia and New Zealand
To install the Enphase Envoy-S Metered™ gateway with integrated meter, read and follow all warnings and instructions in this Guide and in the Enphase Envoy-S Installation and Operation Manual at: enphase.com/support. Safety warnings are listed on the back of this guide.
PREPARATION
Toolkit mobile app and open it to log in to your Enlighten account. With this app, you can connect to the Envoy-S to track system installation progress. To download, go to
enphase.com/toolkit or scan the QR code at right.
B ) Check the box for the following items:
Enphase Envoy-S Metered gateway
Two split-core current transformers (CTs) for production and consumption metering
Length of DIN rail for mounting
Ferrite bead to attach to your Ethernet Cable, if used
Quick Install Guide (this document)
C ) Check that there is enough space in the switchboard to install CTs.
Do not install the CTs in a panel where they exceed 75% of the wiring space of any cross-sectional area within the panel.
D ) Install the Envoy-S Metered in an IP54-rated, or better enclosure with
conduit attachment when installing outdoors. Do not drill holes on the top of the enclosure or anywhere that allows moisture ingress. Metallic enclosures may impair Wi-Fi signal strength. Use an appro­priately rated enclosure if installing the Envoy-S indoors.
E ) If you are installing the Envoy-S in a multi-phase application, make
sure you have the following items:
Additional CTs (CT-100-SPLIT) for multi-phase installations. Make sure you have one CT for each phase monitored, for both produc­tion and consumption.
A phase coupler. Install a phase coupler on the load side of the over-current protection device. See the Technical Brief on Phase Coupling for your region at enphase.com/support. Consult En­phase support for compatible devices.
F ) Decide how to connect the Envoy-S to the Internet: choose to use
Wi-Fi, an Enphase Mobile Connect modem, or Ethernet.
G ) Make sure you have the following optional items, if needed:
Enphase Mobile Connect™ modem (order CELLMODEM-02)
Ethernet over power line communication (PLC) bridge with Ether­net cables [order EPLC-02 (EU), EPLC-03 (UK) or EPLC-04 (AU/NZ)]
Ethernet cable [802.3, Cat5E or Cat6, unshielded twisted pair
(UTP)]. Do not use shielded twisted pair (STP) cable. H ) Install the PV system as directed by the installation manuals. I ) If an Enphase PV system is or will be installed at the site, create a
paper installation map to record device serial numbers and positions in the array. You will scan this map later using Installer Toolkit and your mobile device.
As you did with the microinverters (and Enphase AC Batteries, if
installed), peel the removable label from the bottom of the Envoy-S
and afx it to the paper installation map.
Always keep a copy of the installation map for your records.
NOTE: If needed, you can nd an installation map with any Enphase Microinverter Quick Install Guide.
(Model ENV-S-WM-230)
Envoy-S Display and Controls
Network Communications LED
Green when Envoy-S is connected to Enphase Enlighten™.
AP Mode LED
Green when Envoy’s AP Wi-Fi network is available.
AP Mode Button
Press to enable Envoy’s AP Mode for connecting with a mobile device. Hold for 5 seconds to start WPS connection to a router.
Power Production LED
Green when microinverters are producing power.
Device Communications LED
Green when devices are communicating with Envoy-S.
Device Scan Button
Press to start/stop 15 minute scan for devices over the power line.
Track system installation progress with the Enphase Installer Toolkit™ mobile app. The LEDs on the Envoy-S are solid green when a function is
enabled or performing as expected, ashing when an operation is in
progress, or solid amber when troubleshooting with Installer Toolkit is required. For a legend of all LED states, see Troubleshootinga.
Enphase Installer
Toolkit mobile app
How It Works
POWER LINE COMMUNICATIONS
NETWORK
COMMUNICATIONS
Microinverters
Envoy-S
Switchboard
Router
Enlighten
To Internet
Wire the Envoy-S for Power and Metering
For this step, refer to the Wiring Instruction Sheet for your region.
Energise the Envoy-S
A ) Close the terminal block door, and secure it with the screw. B ) Turn on the circuit feeding the Envoy-S.
C ) All four LEDs ash amber during boot up (approximately 2 minutes).
When boot up is complete, the Device Communications LED lights solid amber, indicating that devices are not yet detected.
Launch Installer Toolkit and Start AP Mode
A ) Launch the Installer Toolkit app and tap View Systems. B ) The Envoy’s AP (Access Point) Wi-Fi network allows you to connect
your mobile device (smart phone or tablet) to the Envoy-S. The AP Mode LED lights solid green when the network is available.
On the Envoy-S, if the AP Mode LED is not lit, press the AP Mode button.
On your mobile device, go to Settings and join the Wi-Fi network
“Envoy_nnnnnn” (where “nnnnnn” represents the nal six digits of
the Envoy-S serial number).
Detect Devices and Select the Grid Prole
Use one of the following methods to detect devices (Enphase Microinvert­ers and/or Enphase AC Batteries).
Method A // Provision devices with Installer Toolkit
Use the Installer Toolkit mobile app to congure the Envoy-S with the
serial numbers of the installed devices. A ) Select the system you are working with, or tap [+] to add a system. B ) If the serial number for the Envoy-S you are installing is not displayed
on the System Overview screen, tap the [+] next to the word “Envoys”. When the app displays the serial number of the Envoy-S, tap it to add it to the system.
C ) Following the on-screen instructions to create the arrays and scan the
serial numbers from the installation map..
D ) Tap the Connect button. This provisions the scanned devices on the
Envoy-S.
E ) When prompted, conrm the number of devices that you installed and
select the grid prole.
The Device Communications LED lights solid green if all of the provisioned de­vices are communicating or solid amber if any devices are not communicating.
Method B // Discover devices with Installer Toolkit
Use the Installer Toolkit mobile app to set the number of devices the Envoy-S should search for on the power line.
A ) Tap Connect to an Envoy. B ) When prompted, enter the number of devices that you installed and
select the grid prole.
C ) When prompted to start a device scan, tap OK.
The Device Communications LED ashes green while scanning. It lights
solid green when all of the devices you installed are communicating or solid amber if any devices are not communicating.
With all methods
If the Device Communications LED remains solid amber, see Trouble­shootingb.
Verify System Conguration
While still connected to the Envoy-S with Installer Toolkit, check the Over­view screen for the following:
A ) Conrm that the expected number of devices are detected and com-
municating.
B ) On the Overview screen, check that the new prole is set on all the
devices. This may take up to 5 minutes for a typical system.
C ) Tap the Meters button. D ) If there is a check next to Production Meter, the production meter
is enabled. If a gear
is shown, you must enable the meter:
Tap Production Meter. If the meter mode is Multi-Phase, select
the number of Phases Metered. This is based on how your Envoy-S
is wired. For example, if the Envoy-S is wired for three, select three
phases.
Follow the on-screen instructions to enable the Production Meter. E ) If you installed consumption metering CT(s), tap Consumption Meter
to enable the meter.
If the meter mode is Multi-Phase, select the number of Phases Me-
tered. The available options will match or exceed the value selected
for the Production Meter.
Based on where you installed the consumption CT, indicate whether
the circuit that passes through the consumption CT includes:
- Load with solar production (net) or
- Load only (total or gross), for example, in the case of a line-side tap.
Follow the on-screen instructions to enable the Consumption Meter. If you change the number of Phases Metered to exceed the number selected for the Production Meter, the system increases the number
for both meters and prompts you to conrm.
F ) Return to the Overview screen and verify the meter reading(s).
If you used Installer Toolkit to detect devices, the Power Production LED
lights solid green when all expected microinverters are producing
power. If you did not use Installer Toolkit, it lights solid green if all
communicating microinverters are producing power. It ashes green
when microinverters are upgrading. Check Installer Toolkit for production status details. If the Power Production LED remains solid amber, see
Troubleshootingc.
2
3
4
6
NOTE: In systems where a central disconnect (or contactor)
is installed, you must congure the meters as described in
Step 6 before device discovery can complete.
5
INSTALLATION
Choose a location for the Envoy-S
A ) Install the Envoy-S Metered near the switchboard and consider the
length of the CT leads (4 meters) when choosing the location. If you need to extend the leads (up to 148 meters), refer to the Enphase Envoy-S Installation and Operation Manual at: enphase.com/support.
B ) Install the Envoy-S Metered in a protected dry space. If outdoors,
install the Envoy-S in an IP54-rated, or better, enclosure with con­duit attachment. Use an appropriately rated enclosure if hard wiring the Envoy-S indoors.
NOTE: Metallic enclosures may impair Wi-Fi signal strength. C ) Mount the Envoy-S horizontally using the included DIN rail.