QUICK INSTALL GUIDE (Models Encharge-3T-1P-NA and Encharge-10T-1P-NA)
Install the Enphase IQ
To install the Enphase IQTM Battery 3T system or IQ
in this guide. Safety warnings are listed on the back of this guide. These instructions are not meant to be a complete explanation of how to design and install
an energy storage system. All installations must comply with national and local electrical codes and standards. Only qualied electricians shall install, trou-
bleshoot, or replace the IQ
TM
The IQ
Battery system includes the Enphase IQTM Battery(ies) with integrated Enphase IQ
TM
Battery 3T or IQ
production and home energy consumption. The IQ
when it is abundant and used when scarce. IQ
installed at the site.
Five unique installation
scenarios are shown:
Whole home backup with IQTM System
Controller as service entrance and
PV combiner connected to IQ
System Controller. This is the preferred
conguration for back up of the entire main
load panel. This conguration supports up
to an 80A breaker for the PV circuit and an
80A breaker for battery storage.
NOTE:
1. For M215/M250 connection to Enphase
Energy System, refer tech brief at https://
enphase.com/en-us/storage-m-series
2. M series microinverters require Gateway-S
metered.
TM
TM
Battery 10T system and the Enphase wall-mount bracket, read and follow all warnings and instructions
TM
Battery 10T.
TM
Battery system senses when it is optimal to charge or discharge the battery so that energy is stored
TM
Battery systems are capable of providing backup power when an Enphase IQ
Battery System
TM
Microinverters. The Enphase IQ
TM
Gateway measures PV
TM
System Controller is
(optional)
TM
TM
Whole home backup with IQ
Controller as service entrance and PV
combiner connected to main load panel.
This is the preferred conguration when you
back up the entire main load panel, and the
size of the PV combiner circuit is more than
80A. In this conguration, the PV combiner
circuit connection space in IQ
Controller is left vacant. When existing PV
combiner circuits are connected to the main
load panel, and you want to add battery
storage to the system, you can keep the PV
combiner connected to the main load panel
and connect only the battery storage to IQ
System Controller.
Partial home backup with main load panel
as service entrance and PV combiner
connected to IQ
PV circuits breaker size is less than 80A,
this is the preferred conguration for partial
home backup with subpanel.
Gateway, IQTM combiner, IQTM Microinverter, Enphase Installer App, and
(optional)
Partial home backup with main load panel
as service entrance and PV combiner
connected to subpanel. This is the
preferred connection conguration for
partial home backup using a subpanel when
the PV circuit breaker size is more than
80A. The space available in IQ
Controller for combiner (solar) connection
is left vacant.
Self consumption, no IQTM System
Controller. The preferred conguration
when adding battery storage and PV for
self-consumption in a grid-tied application
with no option for backup during outages.
TM
PV and IQ
the grid is unavailable.
Battery will not operate when
TM
System
(optional)
PREPARATION
A ) Inspect the packaging and the IQTM Battery(ies) for damage, such as cracks,
dents, or leaking electrolyte. Do not install or use the IQit has been damaged in any way. If damaged, contact your distributor for
replacement.
B ) Ensure that your kit includes the following
TM
•
The IQ
Battery 10T includes three batteries and two interconnect
cable assemblies, an IQ
and bottom mounting brackets.
TM
•
The IQ
Battery 3T includes one battery, and single-width cover with a
TM
Battery 10T triple-width cover, top, middle
IQTM Battery components:
single-width mounting bracket.
NOTE: Check the “Energize By” label on the shipping box to verify that
TM
Battery(ies) will be installed by the date shown. If the date has
the IQ
passed, contact your distributor for next steps.
* WARNING: Risk of injury. Take care when lifting. The IQ
unit is heavy (40.5 kg/ 89.3 lbs) and requires two persons to lift.
C ) Ensure you have the following required Enphase items for backup systems:
•
An Enphase IQTM System Controller with microgrid interconnect device
(MID) functionality and an Enphase IQ Combiner.
•
The Enphase IQ
through the
an Internet connection may have an impact on the warranty. See
enphase.com/warranty for full terms.
•
Wireless communications kit (COMMS-KIT-01) to be installed at the
IQTM Gateway for communications with IQTM Battery and IQ System
Controller. Includes USB cable for connection to
Combiner and allows wireless communication with IQ
TM
IQ
System Controller.
D ) Make sure you also have the following required items:
•
Mounting location that is structurally suited to bear the weight of the
IQTM Battery(ies). Total weight for the IQTM Battery 3T, including the IQTM
Battery
base unit, cover and wall mount bracket, is 48.8 kg (107.6 lbs).
TM
Battery system requires an Internet connection
TM
IQ
Gateway in the IQ Combiner. Failure to maintain
TM
Battery(ies) if
TM
Battery
IQTM Gateway / IQTM
TM
Battery and
TM
Total weight for the IQ
Battery 10T, including the three IQTM Battery
base units, cover, and wall mount bracket, is 152.1 kg (335.3 lbs).The
wall must contain blocked studs that can bear the battery weight or
can be of masonry or other suitable structure.
•
Tools: conduit (with ttings and tting tools), drill, 5/32 inch pilot bit
level, wire stripper, and stud nder if installing on studs.
•
Fasteners for wall mount bracket. Slots are 9.2mm (0.36”). Check with
a structural engineer and local standards for requirements:
TM
Single-width bracket for IQ
Battery 3T: A minimum of three
#20(5/16”) lag bolts or screws, 7.6 cm (3 inches) long (depending on
attachment wall).
TM
Triple-width bracket for IQ
Battery 10T: A minimum of fteen
#20(5/16”) lag bolts or screws, 7.6 cm (3 inches) long (depending on
attachment wall).
•
Washers for use between fastener heads and wall-mount bracket.
• Copper conductors: No. 14 - 8 AWG (11mm/7/16 inch strip length)
copper conductors (rated at 75° C or 90° C) for terminals.
Conduit ttings: 1/2 inch or 3/4 inch (left side) hubs are required for
all installations, and NEMA Type 3R conduit ttings (hubs) are needed
when installing outdoors.
•
Over current protection: The overcurrent protection in IQ
TM
Battery is not
branch circuit overcurrent protection and cannot be relied upon for that
purpose. The branch circuit overcurrent protection is located in IQ System
Controller or, when combining , in a separate combiner. See the Enphase IQ
System Controller Quick Install Guide for more information.
•
Personal protective equipment (PPE) for handling lithium batteries as
required by local safety standards.
•
Protective gloves for protection against sharp edges.
E ) Verify that main service is 120/240 VAC, and not 208/120 VAC. IQ Batteries
cannot be installed where L1 to L2 measures 208 VAC.
F ) Note that the rated energy capacity of the battery is 3.36 kWh.
G ) Install the PV system and the IQ Combiner as directed by the Enphase
installation manuals.
INSTALLATION
Wood stud
Plan a location for the IQTM Batteries
1
The IQTM Battery housing is NEMA type 3R and can be installed indoors
or outdoors. The terminal blocks accepts copper conductors of No. 14 - 8
AWG.
A ) Following local standards, choose a well-ventilated location where
the ambient temperature and humidity are within -15° C to 55° C
(5° F to 131° F) and 5% to 100% RH, non-condensing, preferably
out of direct sunlight. The optimum ambient temperature range
for installation location is 0º C to 30º C (32º F to 86º F). Provide
smoke alarms in the residence in accordance with building, re and
installation codes.
B ) Ensure that the mounting location can sustain the total weight
of the IQ
IQTM Battery 3T, including the IQTM Battery base unit, cover and
wall mount bracket, is 48.8 kg (107.6 lbs). Total weight for the IQ
Battery 10T, including the three IQ
TM
Batteries and mounting bracket. Total weight for the
TM
Battery base units, cover, and
TM
wall mount bracket, is 152.1 kg (335.3 lbs).
*WARNING: The installer should install blocking between studs
to ensure that no single stud carries the entire weight load of the
TM
IQ
Batteries.
C ) Plan the mounting location to be at least 15cm (six inches) off the
ground and 15cm (six inches) from the ceiling for IQ
TM
Battery 3T
and IQTM Battery 10T.
NOTE: Wherever local codes allow a smaller separation distance
for Energy Storage installations, the minimum spacing around IQ
TM
Battery 10T MUST be at least six inches from the top, bottom, left,
and right side of the product.
Keep the IQ
TM
Battery away from falling or moving objects, including
motor vehicles.
*WARNING: If mounted in the path of a motor vehicle, we
recommend a mounting height that is 91 cm (thirty-six inches)
minimum above the oor.
D ) Ensure that there are no pipes or electrical wires where you plan to drill.
E ) Plan to maintain at least 91cm (thirty-six inches) of clearance in
front of each IQ
F ) Consider the dimensions of the IQ
and length of cable when selecting the location.
G ) Select a location where you can interconnect to the Enphase IQ
System Controller.
H ) Follow all local standards and restrictions set forth by AHJ
(Authority Having Jurisdiction).
I ) Up to two IQ
chained on a single branch circuit. For installations with more than
this number of units, there must be a separate load center, subpanel,
or circuit combiner with over current protection to combine the
daisy chained circuits, and you must run only one circuit for all the
TM
IQ
Battery units to the IQTM System Controller (or to Enphase IQTM
Combiner for grid-tied-only installations). You must select proper
conductors and circuit breakers for these circuits according to local
codes, standards, and other applicable requirements. IQ
Controller supports up to a maximum of 80 A breaker for IQ
Battery connection circuit.
The subpanel could be a small, two circuit box with circuit breakers.
The circuit breakers in the box would have to be suitable for
back-feeding, per NEC 408.36(D).
Select the right size subpanel and breakers based on the number
TM
of IQ
Battery units being installed. Up to four IQTM Battery 10Ts or
twelve IQ
To do this, you must purchase an off-the-shelf subpanel and install
as shown in the image in next column.
J ) The maximum conductor size for IQ
10T is 8 AWG and the maximum breaker rating with this conductor
size is 40 A.
TM
Bat tery.
TM
Batteries, easy access, height,
TM
Battery 10T (or six IQTM Battery 3T) units can be daisy
TM
System
TM
Battery 3Ts can be safely connected to 80A load center.
TM
Battery 3T and IQTM Battery
TM
TM
*WARNING: Parallel power production sources only. Do not connect
load circuits.
Install the AC disconnect
2
Following all local codes and standards:
A ) Install an AC disconnect that can break the maximum rated current
of the branch circuit under load. The AC disconnect must be readily
accessible and located within line-of-sight of IQ
TM
Battery, per NEC
2017 706.7(A).
B ) Each IQ
TM
Battery unit is suitable for use with up to No. 8 AWG wires
on a maximum 40 A branch circuit. If more than 32 A of IQTM Batteries
(corresponding to a 40 A branch circuit) are installed, a separate
subpanel must be installed between the IQ
TM
Battery units and IQTM
System Controller to combine the IQTM System Controller circuits
together. All circuit breakers in the subpanel must be suitable for
back-feeding, per NEC 408.36(D).
C ) Verify that AC voltage at the site is within range: single-phase L1 to L2
voltage must measure between 211 and 264 VAC, while L-N should
measure between 106 and 132 VAC.
3
Prepare to install the wall-mount bracket
A ) Make sure that the planned position for the wall-mount bracket
meets clearance requirements as shown. The image depicts a
single-width bracket for the IQ
requirements are the same when installing a triple-width bracket for
TM
the IQ
Battery 10T.
B ) Ensure that the mounting location can sustain the weight of the
TM
IQ
Batteries and mounting bracket. Total weight for the IQTM
Battery 3T including the mounting brackets and cover is 48.8 kg
(107.6 lbs), while the total weight for IQ
the mounting bracket and cover add up to 152.1 kg (335.3 lbs).
TM
Battery 3T, but clearances and
TM
Battery 10T including
C ) Starting at installation position closest to the power source, mark a
level line on the wall as a guide.
* WARNING! Multiple risks. Make sure not to drill or attach into
electric wiring or pipes that are in the wall!
Mounting on vertical stud
IQTM Battery 3T
NOTE: The above shown image is just for reference. Use other slots
on the wall mount if additional xing is required for stability (To be
assessed by the installer).
Vertical+5° inclination-5° inclination
430 mm
775 mm
188mm
4
IQ Battery 10T
MOUNTING SURFACE
IQ Battery 3T
MOUNTING SURFACE
Install the IQTM Battery 3T (single width) or IQTM Battery
10T (triple width) wall mount bracket
Follow the instruction below for the bracket style you are installing.
* WARNING! Risk of injury and equipment damage. Attach the wall mount to
the wall so that it is no more than ve percent from vertical. See the following
image for reference:
Allowable tilt from vertical for IQTM Battery installation:
Mounting Surface Flatness (Across
the Installation width and height)
* If the difference in atness is more than 2mm, recommend installing a
substructure like unistrut for better alignment of the units.
IQTM Battery 3T — single-width bracket
A ) Place the wall-mount bracket on the wall so that the mounting holes of the
bracket align with the center of the stud.
* WARNING! Risk of injury and equipment damage. Use the unit mounting
holes only to mount the base unit of IQ
use the unit mounting holes to secure the bracket to the wall.
B ) Use a level to keep the bottom of the wall-mount bracket level.
C ) Use #20(5/16”) screws (or masonry attachments for masonry) to attach
the bracket using one screw and washer for each slot (9.2mm/0.36”). Use
minimum of three screws in each mounting bracket. Tighten all screws to
manufacturer’s specied torque values.
D ) Verify that the wall-mount bracket is solidly attached to the wall.
* WARNING! Risk of injury and equipment damage. Do not mount an
TM
IQ
Battery 3T on a bracket that is not properly mounted.
E ) If installing additional batteries, install adjacent wall-mount brackets, as
needed. Be sure to align the mounting holes in the wall-mount bracket to
the center of the wall stud. You may install another row of brackets above
the one already installed. Maintain at least 15 cm (six inches) vertical
clearance between rows and and 2.54 cm (1 inch) horizontal clearance
between units of IQ
support the structural load (weight) of the installation.
* WARNING! Risk of injury and equipment damage. Do not install more
than three IQ
Single-width mounting bracket
Front view
478 mm
TM
Battery 3T installations, and ensure that the wall can
TM
Battery 3T units per 20A branch circuit.
Wall mount
418 mm
slots
43 mm
9.2 mm
Unit
mount
key
holes
TM
recommended to be within 2mm*
Battery to the wall mount. Do not
Angle view
IQTM Battery 10T — triple-width bracket
A ) Place the middle wall-mount bracket on the wall so that the mounting
holes of the bracket align with the center of the stud, and the mounting
holes on the left and right align with the adjacent studs.
* WARNING! Risk of injury and equipment damage. Use the unit mounting
holes only to mount the base unit of IQ
use the unit mounting holes to secure the bracket to the wall.
B ) Use a level to keep the bottom of the wall-mount bracket level.
C ) Use #20(5/16”) screws (or masonry attachments for masonry) to attach
the bracket using one screw and washer for each slot (9.2mm/0.36”). Use
a minimum of six screws in each middle mounting bracket (within the red
dotted rectangle) to support three IQ
slots so that you can choose those that allow you to mount the bracket on
studs. Tighten all screws to manufacturer’s specied torque values.
Triple-width mounting bracket
417 mm
D ) The screws on the area below the red dotted rectangle would be
utilized in the next steps.
E ) Verify that the wall-mount bracket is solidly attached to the wall.
F ) Place the bottom wall-mount bracket below the middle bracket
aligning the holes and edges as shown in the image below:
417 mm
61 mm
G ) Use three number of #20(5/16”) screws and utilize three wall mount
slots that are common between middle and bottom wall-mount
brackets to attach bottom wall mount bracket on wall.
H ) Place the top wall-mount bracket sitting on top of middle wall-mount
bracket as shown in the image below:
284.5 mm
417 mm
61 mm
I ) Use six number of #20(5/16”) screws and utilize six wall mount slots
to attach top wall mount bracket on the wall.
* WARNING! Risk of injury and equipment damage. Do not mount IQ
Battery 10T batteries on a bracket that is not properly mounted.
J ) If installing additional batteries, install adjacent wall-mount brackets,
as needed. Be sure to align the mounting holes in the wall-mount
bracket to the center of the wall stud. You may install another row of
brackets above the one already installed.
Maintain at least 15 cm (six inches) vertical clearance between rows
and and 15 cm (six inches) horizontal clearance between units of IQ
Battery 10T installations, and ensure that the wall can support the
structural load (weight) of the installation.
* WARNING! Risk of injury and equipment damage. Do not install more
than one IQ
TM
Battery 10T unit per 20A branch circuit.
TM
Battery to the wall mount. Do not
TM
Battery units. There is an array of
1270 mm
Wall mount
slots
Unit mount
key holes
TM
TM
5
Mount the IQTM Battery(ies) on the wall
* WARNING: Risk of injury. Take care when lifting.
TM
Each IQ
Battery base unit is heavy (40.5 kg/ 89.3 lbs) and re-
quires two persons to lift.
* WARNING! Risk of injury and equipment damage. Avoid dropping
TM
the IQ
Battery(ies). Doing so may create a hazard, cause serious
injury, and/or damage the equipment.
* WARNING! Risk of injury and equipment damage. Protect the IQ
Battery(ies) from impact damage and improper use.
* WARNING! Risk of injury and equipment damage. Do not hold the
microinverters to lift the unit during installation.
A ) Two person together must lift a single IQ
packaging and place it in upright position (as shown in the following
image) on a at surface.
B ) Locate the IQ
TM
Battery lifting points:
C ) The rst person lifting must use points a and d (as shown) to lift the
battery.
D ) The second person lifting must use points b and c (as shown) to lift
the battery.
E ) Together, lift the IQ
TM
Battery and bring it to the already mounted
bracket.
F ) Hold the IQ
the IQ
TM
Battery straight so that the four bolts on the back of
TM
Battery pass through the four key hole slots on the corner of
the mounting bracket.
* WARNING! Risk of injury and equipment damage. Do not release
TM
the IQ
Battery unit until you ensure that the IQTM Battery unit is fully
seated in the wall-mount bracket shelf.
G ) Once all four battery bolts fully pass through the mounting bracket
key hole slots, lower the battery down until fully seated within the
wall-mount bracket and set into the bottoms of the key holes.
H ) Attach the battery to the mounting bracket aligning the screw hole
at the bottom of the battery with the screw hole at the bottom of the
bracket. Tighten the bottom screw to 8Nm (70.8 lb-in).
I ) To record the installation of each IQ
serial number label using Enphase Installer App and your mobile
device.
TM
Battery base unit from the
TM
Battery base unit, scan the
6
Prepare for eld wiring
DANGER! Risk of electric shock. The DC switch must be in the
+
Locked position before performing this step.
A ) Drill the left wall of eld wiring compartment to accommodate the conduit.
B ) Connect eld wiring to the top three terminal blocks.
C ) Size the conductors (Lines and Ground) to account for voltage rise and
TM
to conform to the tables below. Design for a voltage rise total of less
than 2%. IQ
TM
Battery can use any circuit breaker size between 10 A and
40 A. Breaker rating and wire size are installation dependent.
Number of
IQ3T/IQ10T units
1*IQ3T5.31410
2*IQ3T10.71415
3*IQ3T or 1*IQ10T16.01220
4*IQ3T or (1*IQ10T + 1*IQ3T)21.31030
5*IQ3T or (1*IQ10T + 2*IQ3T)27.7835
6*IQ3T or 2*IQ10T or
(1*IQ10T + 3*IQ3T)
Current (A)Minimum wire
32.0840
size (AWG)
Breaker
rating (A)
*IQ3T refers to IQTM Battery 3T
*IQ10T refers to IQTM Battery 10T
In all cases in the table, it is possible to always use larger conductors
and a breaker sized for that conductor or smaller. For Example in row 3,
with 3*IQ3T or 1*IQ10T, it is possible to use:
a) 12 AWG wire with 20 A breaker, or
b) 10 AWG wire with 20 A or 30 A breaker, or
c) 8 AWG wire with 30, 35, or 40 A breaker
+DANGER! Risk of electric shock. Check that the dedicated circuit
breaker protecting the branch where the IQTM Battery(ies) will be
connected is turned off before wiring.
* WARNING! Risk of equipment damage. The DC switch must be
OFF before installing, otherwise IQTM Battery will try to form a grid.
d
DC Switch
PCBA Serial
Numbers
c
Location for
conduit cut out
7
Install conduit and eld wiring
DANGER! Risk of electric shock. The DC switch must be in the
+
Finished Goods
Serial numbers
labels
locked position before performing this step.
A ) If installing an IQ
•
Face the front of the batteries, and insert the interconnect cable
TM
Battery 10T, install the interconnect cable assembly.
assembly through the front cable slot from within the eld wiring
compartment, with the arm of the interconnect cable pointing up,
making a “U” shape.
B ) Using the conductors and suitable conduits, connect the AC disconnect
and the rst adjacent IQ
TM
Battery. Use the conduit openings provided
to connect the conduit and pass the wires through them. Note that if an
Enphase IQ System Controller is in line-of-sight, the breaker can service
as a disconnect.
* WARNING! Risk of equipment damage. Do not modify or rewire the
pre-installed wiring or bonding connections in the eld wiring compartment.
* WARNING! Risk of equipment damage. Always connect to two Lines
(active) and one ground.
ab
Bottom screw hole
(CONTINUED ON NEXT PAGE)
7
1
2
Install conduit and eld wiring (continued)
C ) Connect each wire in the eld wiring compartment to its corresponding
conductor (Lines and Ground). Each terminal accepts two 14-8 AWG
conductors (11mm/7/16 inch strip length). Tighten to 1.6 Nm (14 lb-in).
D ) If installing an IQ
TM
Battery 10T, secure the inter-connection cable
assembly between the IQTM Battery units. You must connect the
interconnect cable to the bottom three terminal blocks for the left unit
and top three terminal blocks for the right unit.
1
2
Tab 1 and 2 to
be broken
Tab 2 to be
broken
* WARNING! Risk of equipment damage. Do not daisy chain more than
six total IQTM Battery 3T or two IQTM Battery 10T on a single branch circuit.
2
3
1
4
Ensure that the
interconnect
cable is properly
seated in the
slot.
Interconnect
cable
Assemble using two
M4 screws from the
c o v e r a c c e s s o r i e s k i t :
Tighten to 1.9Nm/16.8 lb-in.
E ) After all wires in the eld wiring compartment are connected and
secured, check that there are no exposed conductors.
F ) If connecting additional IQ Batteries, use another conduit and another
set of wires to connect between eld wiring compartments.
G ) Gently arrange all the wires and connectors inside the eld wiring
compartment.
H ) Secure the eld wiring compartment cover. Use a cross-head screw
driver to tighten the cover screws to 2.3Nm (20.3 Ib-in).
I ) Break tab 1, tab 2,
or both tabs on the
eld wiring door
along the yellow
lines indicated for
interconnect cable
entry as shown.
J ) Do not break tabs
when installing the
TM
IQ
Battery 3T.
DANGER! Risk
+
of electric shock. The
system is not ready
to be energized! Do
not close the circuit
breaker or turn on the
DC switch.
1. Terminal for L1 in
from conduit
opening
2. Terminal for L2
in from conduit
opening
3. Terminal for
ground in from
conduit opening
4. DC Switch
Tab 1 to be
broken
8
Cover and energize the system
*WARNING: Before energizing, make sure that ALL IQ Batteries in
the system are properly installed and conductors terminated.
* WARNING! Risk of equipment damage. Ensure that no wires are
pinched before replacing the cover.
NOTE: Check the box for updates on cover installation instructions.
IMPORTANT: The section 8 and 9 will depict instructions for assemby
and disassembly of IQTM Battery 3T cover, simillar instructions are
applicable for IQTM Battery 10T cover.
A ) Check that the eld wiring compartment cover(s) for all IQ Batteries in
the system are closed and secured.
*WARNING: Complete the Enphase IQ System Controller and En-
phase Combiner installations before turning the DC switch(es) ON.
+DANGER: Risk of electric shock. Before continuing, check that
IQTM Battery units are properly wired, and ground connection does
not have a L1 or L2 connection, as this introduces a safety hazard.
• Apply AC power to the IQ
TM
Battery circuits. Do NOT turn on the IQTM
Battery DC switch(es).
• Using a voltmeter measure the
grounded conduit) and ensure there is no AC voltage source present. If
wiring is incorrect, a ground fault may exist, and the AC voltage may read
~120VAC. If voltage is present, DO NOT touch the chassis, and immediately
remove AC power from the
• Remove AC power to the
IQTM Battery chassis metal to ground (e.g.,
IQTM Battery circuits.
IQTM Battery circuits and correct the wiring.
+ WARNING! Risk of electric shock and equipment damage. If the
DC switch is ON, AC voltage might be present at the terminals.
+DANGER: Risk of electric shock. AC voltage might be present
at the output when the DC switch is on.
*WARNING: Branch Circuit protection for IQ
be ON (with AC voltage present) before turning DC switch ON.
Wait for 15 seconds after turning branch circuit protection ON and
check that LED on IQTM Battery is ON (Any color LED is ON) before
turning DC switch ON.
TM
Battery MUST
8
Cover and energize the system (continued)
B ) Turn ON the AC power rst (branch circuit protection) and then turn
ON the DC switches of the IQ Batteries.
NOTE: Do NOT leave the IQ
any extended period of time (such as overnight or for more than 24 hours)
unless IQTM Battery is commissioned (communicating with IQTM Gateway),
connected to AC, and has passed functional testing and is operational.
Leaving the DC switch ON without AC connection and communication with
the system will drain the battery and may cause damage to the battery
cells such that they no longer be able to charge. Damage resulting from
this improper installation and misuse is not covered under the product’s
limited warranty.
TM
Battery unit’s DC switch in the ON position for
C ) Slide the IQTM Battery cover in the indicated direction so that the hook of
the cover in the highlighted region goes into the slot provided for it in the
main unit (both sides of the main unit).
D ) Pull out the lower edges while sliding in the
cover and ensure that the tabs are locked to the back
plate as shown below before releasing.
IQTM Battery 10T Cover
NOTE: Only for reference purpose, the Enchage 10T Cover image is
shown above for locking.
F ) After assembling the IQTM Battery cover, remove the break-out tab from
the conduit cover and assemble with the ribs
snapping in as shown:
G ) Break the conduit cover tab along the yellow
line as indicated before assembling to the main
unit:
E ) Once the cover reaches the position as shown in the side view image.
push the top portion of the cover and make sure that the cover is
locked in place, in the indicated regions.
Before pushing
into place:
Locked into
place:
TM
Battery 3T Cover
IQ
TM
Disassembly of the IQ
9
Battery Cover
A ) Remove the conduit cover from the IQTM Battery cover.
B ) Using the hand access slots pull the top plastic grill slightly in the
direction shown below (in order to unlock the top plastic cover from the
ribs highlighted in red.):
Hand Access slots
TM
IQ
Battery 3T Cover
Disassembly of the IQTM Battery Cover (continued)
9
IQTM Battery 10T Cover
NOTE: Only for reference purpose, the IQTM Battery 10T Cover image is
shown above for unlocking.
Ensure that the IQTM Battery cover reaches the position shown in the side
view image after the completion of the step B.
Before Step B
After Step B
CONFIGURE and ACTIVATE
A ) Use the Enphase Installer App to commission the IQ
connected to the IQTM Gateway, refer to the Enphase Installer App help
topics for more information.
B ) After the IQTM Gateway has detected the IQTM Battery(ies), the IQTM
Battery LEDs operate as described in the following section.
TM
Battery(ies). Once
OPERATION
a
LED overview
After being commissioned, the LED ashes yellow while each IQTM Battery
boots up. If the LED rapidly ashes green for more than two minutes, the bat-
tery is in trickle charge mode and will remain so until it reaches a minimum
state of charge (up to 30 minutes). After the IQTM Battery is booted up, the
LED becomes blue or green depending on the charge level. If the LED ashes
yellow after one hour or changes to a ashing red state, contact Enphase
Customer Support at enphase.com/en-us/support/contact.
StateDescription
Uncommissioned
Flashing blueAfter booting up, IQ
Flashing greenAfter passing the three-way handshake with the IQ
After commissioning (normal operation)*
Rapidly ashing yellowStarting up / Establishing communications
Red ashes in sequences of 2 Error. See “Troubleshooting”.
Solid yellowNot operating due to high temperature. See “Trouble-
Solid blue or greenIdle. Color transitions from blue to green as state of
Batteries have a one-hour orphan timer. If the IQTM Gateway stops communicating with
* IQ
them, after one hour the IQ Batteries return to an “uncommissioned” state.
Gateway but has not passed the commissioning
three-way handshake to conrm that it is an Enphase
device.
Gateway.
shooting”.
charge increases. Check Enphase Installer App for
charge status.
TM
Battery has paired with an IQTM
TM
C ) Pull out the lower portion of the cover in the directions shown below and
move it away from the wall slightly(in order to unlock the highlighted
angular tabs):
D ) Pull out the cover in the indicated direction.
b
Operating mode and set points
IQTM Battery supports multiple storage interactive system modes based on usage.
A ) Using Enphase Installer App, select Menu > Settings > Battery Storage.
B ) Select one of three battery modes:
• Self-consumption mode (default, no setting change required)
• Savings mode
• Full backup
For more information on Operation modes, refer to the Storage System Owner’s guide at enphase.com/en-us.
c
Troubleshooting
If the IQTM Battery(ies) are not operating correctly, do the following. If the issue
persists, contact Enphase at enphase.com/en-us/support/contact.
A ) If the IQTM Battery(ies) do not operate, check the temperature in the room
and increase cooling and/or ventilation as required. Check that the front,
and top sides of the IQTM Battery 3T and IQTM Battery 10T have at least
15cm (six inches) of unobstructed clearance.
B ) If the IQ
TM
Battery LED is off, turn off the breaker for the branch circuit, wait
for at least one minute, and turn it back on.
TM
NOTE: During a brownout or blackout, the IQ
Battery powers down
automatically. This is normal. When power is restored, it automatically
starts up again.
C ) If you do not see IQTM Battery information in Enphase Installer App, check that
the IQTM Gateway and the Internet connection are working. If the issue persists,
contact Enphase Customer Support at enphase.com/en-us/support/contact.
Limitation of Use :
Your IQTM Battery unit is not intended for use as a primary or backup power source
for life-support systems, other medical equipment, or any other use where product
failure could lead to injury, loss of life, or catastrophic property damage. Enphase
disclaims any and all liability arising out of any such use of your IQTM Battery unit.
Further, Enphase reserves the right to refuse to provide support in connection with
any such use and disclaims any and all liability arising out of Enphase’s provision of,
or refusal to provide, support for your IQTM Battery device in such circumstances.
SAFETY
IMPORTANT SAFETY INSTRUCTIONS. SAVE THESE INSTRUCTIONS. This guide contains important instructions that you must follow during installation
and maintenance of the Enphase IQ
In Case of Fire or Other Emergency
In all cases:
•
If safe to do so, switch off the AC breaker for the IQ
an isolator switch is present, switch off the AC isolator for the IQ
circuit.
•
Contact the re department or other required emergency response team.
•
Evacuate the area.
In case of re:
•
When safe, use a re extinguisher. Suitable types are A, B, and C dry chemical
re extinguishers. Additional extinguishing media include carbon dioxide, or
alcohol-resistant foams.
In case of ooding:
•
Stay out of the water if any part of the IQ
submerged.
•
If possible, protect the system by nding and stopping the source of the
water, and pumping it away.
•
If water has contacted the battery, call your installer to arrange a inspection.
If you are sure that water has never contacted the battery, let the area dry
completely before use.
In case of unusual noise, smell or smoke:
•
Ensure nothing is in contact with the IQ
TM
of the IQ
•
Ventilate the room.
•
Contact Enphase Customer Support at enphase.com/en-us/support/contact.
Battery(ies).
Safety and Advisory Symbols
DANGER: This indicates a hazardous situation, which if not avoided, will result in
death or serious injury.
+
WARNING: This indicates a situation where failure to follow instructions may be a
safety hazard or cause equipment malfunction. Use extreme caution and follow
*
instructions carefully.
NOTE: This indicates information particularly important for optimal system opera-
✓
tion. Follow instructions carefully.
Safety Instructions
DANGER: Risk of electric shock. Risk of re. Only qualied electricians should install,
+
troubleshoot, or replace the IQ
DANGER: Risk of re or explosion. Only qualied personnel, using personal protective
+
equipment (PPE) should transport or handle the IQ
DANGER: Risk of explosion. Do not dispose of IQTM Battery(ies) in a re or by burn-
+
ing. The IQ
DANGER: Risk of re or explosion. This product is designed for stationary installa-
tion only and should be used accordingly. It is not designed for mobile applications
+
such as installation and on vehicles and trailers and should not be used in such
applications.
DANGER: Risk of re. During use, when stored, or during transport, keep the IQTM
Battery(ies) in an area that is well ventilated and protected from the elements,
+
where the ambient temperature and humidity are within -15° C to 55° C (5° F to
131° F) and 5% to 100% RH, non-condensing, preferably out of direct sunlight. Do
not install the IQ
level.
DANGER: Risk of re. If the IQTM Battery(ies) generate smoke, remove AC power
from the Enphase System and turn the DC connect switch to the off position so
+
that charging/discharging stops.
DANGER: Risk of electric shock. Risk of re. Do not attempt to repair the IQTM Bat-
tery(ies). DO NOT OPEN THE ENCLOSURE -- NO SERVICEABLE PARTS. Tampering
+
with or opening the IQTM Battery(ies) will void the warranty. If the IQTM Battery(ies)
fail, contact Enphase Customer Support for assistance at enphase.com/en-us/
support/contact.
DANGER: Risk of electric shock. Do not use Enphase equipment in a manner not
specied by the manufacturer. Doing so may cause death or injury to persons, or
+
damage to equipment.
DANGER: Risk of electric shock. Do not install the IQTM Battery(ies) without rst
removing AC power from the photovoltaic system. Disconnect the power coming
+
from the photovoltaics before servicing or installing.
DANGER: Risk of electric shock. Always de-energize the AC branch circuit during an
+
emergency and/or before servicing the IQ
switch under load.
DANGER: Risk of electric shock. Risk of high short-circuit current. Observe the
following precautions when working on batteries:
+
•
•
•
•
DANGER: Risk of electric shock. Risk of re. Do not work alone. Someone should be
in the range of your voice or close enough to come to your aid when you work with
+
or near electrical equipment.
DANGER: Risk of re. Do not allow or place ammable, sparking, or explosive items
+
near the IQ
TM
Battery(ies) can explode.
TM
Battery(ies) at elevations over 2500 m (8,200 feet) above sea
Remove watches, rings, or other metal objects.
Use tools with insulated handles.
Wear insulating gloves and boots.
Do not lay tools or metal parts on top of batteries.
Battery(ies). Failing to follow any of these instructions may void the warranty (enphase.com/warranty).
Safety Instructions, continued
DANGER: Risk of electric shock. In areas where ooding is possible, install the IQTM
Battery(ies) at a height that prevents water ingress.
+
DANGER: Risk of electric shock. AC voltage is present at the output when the DC
switch is on.
+
DANGER: Risk of electric shock. Branch circuit protection must be off before
switching DC power on or off.
+
DANGER: Risk of electric shock. The DC switch must locked in the OFF position for
shipping and service.
+
WARNING: Risks of electric shock, energy hazard, and chemical hazard. Do not
disassemble.
*
WARNING: Risk of equipment damage. During use, storage, transport, or installa-
*
tion, always keep the IQ
WARNING: You must install the IQTM Battery(ies) only on a suitable wall using an
Enphase wall-mount bracket.
*
WARNING: Before installing or using the IQTM Battery(ies), read all instructions and
cautionary markings in this guide and on the equipment.
*
WARNING: Do not install or use the IQTM Battery(ies) if it has been damaged in any
way.
*
WARNING: Do not exceed the maximum number (3) of IQTM Batteries in a 20 A AC
branch circuit.
*
WARNING: Do not sit on, step on, place objects on, or insert objects into the IQTM
Battery(ies).
*
WARNING: Do not place beverages or liquid containers on top of the IQTM Battery(ies).
*
Do not expose the IQ
WARNING: When placing the IQTM Battery(ies) in storage, ensure that AC power
is not present and that the DC switch is in the Locked position. While in storage,
*
damage to the battery can occur from over-discharge. If the battery state of charge
falls to 0%, the IQ
TM
IQ
Battery(ies) must only be stored for a limited amount of time.
TM
• The
Energize By” date on the shipping box label.
• The
when placed in storage. To do this, the
in Sleep Mode.
• If the
into Sleep Mode prior to uninstalling. A battery in Sleep Mode can be
stored a maximum of two months after being placed into Sleep Mode.
NOTE: Perform installation and wiring, including protection against lightning and
✓
resulting voltage surge, in accordance with all applicable local electrical codes and
standards.
NOTE: Because IQTM Battery(ies) are grid forming, you must install signage in
✓
accordance with NEC articles 705, 706, and 710.
NOTE: Using unapproved attachments or accessories could result in damage or
✓
injury.
NOTE: Install properly rated over current protection as part of the system installa-
✓
tion.
NOTE: To ensure optimal reliability and to meet warranty requirements, the IQTM
✓
Battery(ies) must be installed and/or stored according to the instructions in this
guide.
NOTE: The IQTM Battery(ies) are compatible only with the IQTM Gateway commu-
✓
nications gateway properly tted with USB hub, USB radios, and production
and consumption CTs. The IQTM Gateway is required for operation of the IQTM
Battery(ies). Earlier versions of the Enphase Gateway communications gateway are
incompatible.
NOTE: The Enphase IQTM Battery(ies) are intended to operate with an Internet con-
✓
nection. Failure to maintain an Internet connection may have an impact on the warranty. See Limited Warranty for full terms and services (enphase.com/warranty).
NOTE: When replacing Enphase IQTM Battery(ies), you must replace with an IQTM
✓
Battery(ies) of the same type, with the same AC current rating.
NOTE: When disconnected and stored, no automatic charge of the battery is
✓
possible.
NOTE: Properly mount the IQTM Battery(ies). Ensure that the mounting location is
✓
structurally suited to bearing the weight of the IQ
NOTE: During use, storage, and transport, keep the IQ Battery(ies):
✓
•
•
•
•
•
•
in the path of a motor vehicle, we recommend a 91 cm (36-inch)
minimum mounting height
•
•
•
NOTE: Conditions for the IQ Battery installation site apply also to storage condi-
✓
tions.
Battery
IQ
TM
Battery
IQ
TM
Battery
IQ
Properly ventilated
Away from water, other liquids, heat, sparks, and direct sunlight
Away from excessive dust, corrosive and explosive gases, and oil smoke
Away from direct exposure to gas exhaust, such as from motor vehicles
Free of vibrations
Away from falling or moving objects, including motor vehicles. If mounted
At an elevation of lower than 2,500m (8,200 feet) above sea-level
In a location compliant with re safety regulations
In a location compliant with local building codes and standards
TM
Battery(ies) in an upright position.
TM
Battery(ies) to liquids or ooding.
TM
Battery(ies) can be damaged or destroyed. Because of this, the
(ies) must be installed and energized by the “Must
(ies) must have a charge state of no more than 30%
(ies) is already been installed, it must be placed
TM
IQ
TM
TM
Battery(ies).
TM
Battery circuit, and if
TM
Battery(ies) or wiring is
Battery(ies) or in the venting area
TM
Battery(ies).
TM
Battery(ies). Never disconnect the DC
TM
Battery
Environmental Protection
ELECTRONIC DEVICE: DO NOT THROW AWAY. Waste electrical
products should not be disposed of with household waste.
Proper disposal of batteries is required. Refer to your local
codes for disposal requirements.
(ies) must be placed
Battery
TM
Battery(ies).
Loading...
+ hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.