1.2 CHECK ORDER ....................................................................................................................................................................................... 1
1.3 SERIAL NUMBERS..................................................................................................................................................................................1
3.0 FEATURES AND FUNCTION...........................................................................................................................................................2
5.1 PROCEDURE FOR SAMPLING FROM GAS BAG.................................................................................................................................... 7
FIGURE 1: GAS SAMPLING UNIT FEATURES .............................................................................................................................................3
FIGURE 3: GAS SAMPLING UNIT WITH SENSOR/TRANSMITTER MOUNTED INTERNALLY ..............................................................4
FIGURE 4: APPLICATION, REMOTE SENSOR, MOTORIZED SAMPLE DRAW SYSTEM ......................................................................5
FIGURE 5: WIRING DIAGRAM GAS SAMPLING UNIT WITH RX-1G CONTROL.................................................................................6
FIGURE 6: FILLING SAMPLE BAG FROM GAS CYLINDER ......................................................................................................................7
FIGURE 7: VENTING CALIBRATION GAS TO A GAS BAG........................................................................................................................ 8
FIGURE 8: VENTING CALIBRATION GAS TO AN EXHAUST LINE...........................................................................................................8
FIGURE 9: 04018-018 PUMP FEATURES .....................................................................................................................................................9
FIGURE 12: CHECK VALVE H OUSING REPLACEMENT DETAILS........................................................................................................ 12
FIGURE 13: PROPER ORIENTATION OF CHECK VALVE HOUSING AND GASKET............................................................................ 12
Reference information:
NOTE: [important information about use of instrument – if not followed may have to redo some steps.]
CAUTION: [affects equipment – if not followed may cause damage to instrument, sensor etc…]
WARNING: [affects personnel safety – if not followed may cause bodily injury or death.]
Page 4
Page 5
Gas Sampling UnitENMET Corporation
1.0 Introduction1.0 Introduction
The ENMET gas sampling unit is used in applications requiring air sample draw to a sensor. It is designed to be used
in conjunction with ENMET sensor/transmitters. If used with other manufactures’ sensor/transmitters, contact your
local ENMET representative or ENMET
NOTE: All specifications stated in this manual may change without notice.
1.1 Unpack
Unpack the Gas Sampling Unit and examine it for shipping damage. If such damage is observed, notify both ENMET
customer service personnel and the commercial carrier involved immediately.
Regarding Damaged Shipments
NOTE: It is your responsibility to follow these instructions. If they are not followed, the carrier will
not honor any claims for damage.
q This shipment was carefully inspected, verified and properly packaged at our company and delivered to the
carrier in good condition.
q When it was picked up by the carrier at ENMET, it legally became your company’s property.
q If your shipment arrives damaged:
•Keep the items, packing material, and carton “As Is.” Within 5 days of receipt, notify the carrier’s local
office and request immediate inspection of the carton and the contents.
•After the inspection and after you have received written acknowledgment of the damage from the carrier,
contact ENMET Customer Service for return authorization and further instructions. Have your Purchase
Order and Sales Order numbers available.
qENMET either repairs or replaces damaged equipment and invoices the carrier to the extent of the liability
coverage, usually $100.00. Repair or replacement charges above that value are your company’s responsibility.
q The shipping company may offer optional insurance coverage. ENMET only insures shipments with the
shipping company when asked to do so in writing by our customer. If you need your shipments insured, please
forward a written request to ENMET Customer Service.
Regarding Shortages
If there are any shortages or questions regarding this shipment, please notify ENMET Customer Service within 5 days
of receipt at the following address:
ENMET Corporation
680 Fairfield Court
Ann Arbor, MI 48108
734-761-1270734-761-3220 Fax
1.2 Check Order
Check, against the purchase order. Verify that the Gas Sampling Unit is received as ordered. If there are accessories
on the order, ascertain that they are present. Notify ENMET customer service personnel of any discrepancy
immediately.
1.3 Serial Numbers
Each Gas Sampling Unit is serialized. These numbers are on tags on the equipment and are on record in an ENMET
database.
1
Page 6
ENMET CorporationGas Sampling Unit
2.0 Specifications2.0 Specifications
Power Requirement10 - 30 V DC
Suction Flow Rate0.3 Liter/min. (adjustable after installation)
Sampling distance100 ft maximum
Suction PumpElectromagnetic diaphragm pump
Piping MaterialPolypropylene, non toxic vinyl tubing
External Piping ConnectionsCompress fitting for ¼ O.D. tubing
Installation MethodWall mounting
Dimensions11(w) X 6.5(H) X 5(D) inches
Weight2 lbs
Operating Temperature Range+32ºF (0 ºC) to +104ºF (40ºC)
NOTE: All specifications stated in this manual may change without notice.
3.0 Features and Function3.0 Features and Function
Refer to Figure 1 for component layout diagram.
FeatureFunction
Power TerminalThis terminal connects the DC power (10 - 30 VDC)
FlowmeterThis Flowmeter allows the user to verify and monitor the
Flowmeter ValveThis valve is used to control the flow rate. Adjust flow to
Flow Sensing DeviceThis flow sensing device is to monitor for loss of air flow.
Low Flow Alarm Light (Optional
with some installations)
Sampling PumpThis electromagnetic diaphragm pump draws the air
Exhaust OutletThis port expels the air sample after it passes the sensor.
Sampling InletThis port draws the air sample from the test area. For
supplied from external power source
flow rate of the air sample. Proper flow rate,
approximately 0.5 lpm(liter per minute).
proper flow rate, approximately 0.5 lpm (liter per minute).
Activation upon loss of air flow results in relay activation.
This light when green indicates flow rate is sufficient.
When light is red, flow rate is inadequate.
sample from the test area to the sensor.
For external piping, use ¼″ O.D. tubing.
external piping, use ¼″ O.D. tubing.
Gas Sensing ChamberThis chamber directs the air sample to the gas sensor.
Varies, depending on type of sensor/transmitter
2
Page 7
Gas Sampling UnitENMET Corporation
Enclosure
Flowmeter
Power
10 – 30 VDC
Sensor
10 – 30 VDC
Terminals
Valve
Flowmeter
Sample Pump
Chamber
NEMA-4X
(Optional)
Flow Sensor
Internal View
Sample Inlet
Exhaust Outlet
External View
Figure 1: Gas Sampling Unit Features
3
Page 8
ENMET CorporationGas Sampling Unit
210mm
4.0 Installation4.0 Installation
The Gas Sampling Unit needs to be level and as close to the area to be monitored as possible, to reduce transport time
to the sensor/transmitter.
• Refer to Figure 2 for mounting dimensional diagram.
• Sensor/Transmitters can be located within the Gas Sampling Unit or remotely. Refer to Figures 3,4 and 5
• Inlet tubing must be compatible with the target gas.
• Caution should be used to insure that fluids do not enter the inlet tubing.
• Some types of gases require that the sample gas be removed from the area. This is accomplished with the outlet
port. Figures 7 and 8 show typical use of gas bag and exhaust line from the outlet port.
• Power is supplied from an external source. Refer to Figures 4 and 5 for wiring diagram. Connect 10 – 30 VDC to
terminal block positions 1 and 3.
• After installing all the tubing and the sensor/transmitter, verify that there are no leaks in the system. Verification
should be done by plugging the inlet tube. If the system is correct the flow meter reads zero and the flow sensor
activates. If this does not happen, check all fittings and seals.
10.75″
273mm
.75″
19mm
8.28″
6.25″
159mm
4.87″
123mm
.75″
19mm
Figure 2: Dimensional Diagram
4.0″
101mm
6.75″
171mm
Figure 3: Gas Sampling Unit with Sensor/Transmitter mounted Internally
4
Page 9
Gas Sampling UnitENMET Corporation
110 V
Outlet
Clear Plastic
Sample from
12V
in
Sensor
tape to seal
DC
Terminal positions 1 & 3
Gas Sampling Unit
ISA-M
Tubing
Sensor Adapter
Remote Location
From: ISA-M terminal TB2-positions 7&8
To: Gas Sampling Unit terminal positions 1&3
use Teflon
Using 12 VDC source ISA-M
Cord or Conduit
AC
Line Cord
Sensor Wiring Enclosure
12 VDC Out TB2-
7: Positive
8: Ground
View of Internal PCB in ISA-M
Figure 4: Application, Remote Sensor, Motorized Sample Draw System
5
Page 10
ENMET CorporationGas Sampling Unit
Control
Model RX – 1G
Sensor/Transmitter
24 VDC Gas Sampling Unit
Figure 5: Wiring Diagram Gas Sampling Unit with RX-1G Control
NOTE: On some installations, the 4-20mA signal may be wired through the flow switch, so that the 4-20mA signal is
interrupted when low flow conditions occur.
6
Page 11
Gas Sampling UnitENMET Corporation
Stopcock
5.0 Operation5.0 Operation
The Gas Sampling Unit requires no calibration itself, however any sensor/transmitter or instrument associated with it
does. Follow the instructions associated with the sensor/transmitter or instrument. To insure that the calibration is
accurate with the sample draw system, you need to fill a sample bag with calibration gas.
5.1 Procedure for Sampling from Gas Bag
• Refer to Figures 6,7 and 8 for filling gas bag and attaching to Gas Sampling Unit.
• Attach the regulator to the gas cylinder. Refer to Figure 6. Use only the regulator supplied with the calibration kit.
• Attach a completely deflated gas bag (5 liter tedlar bag) to the output port of the regulator with appropriate tubing.
• Turn on the gas cylinder by rotating the knob on the regulator so gas flows into the bag. Fill the gas bag until it is
approximately 75% inflated. Close the stopcock and turn off the regulator. Remove the gas cylinder regulator and
tubing.
• Open the stopcock on the gas bag; connect the gas bag to the gas inlet port located on the Gas Sampler Unit, or the
entrance to the sensor adapter. Refer to Figures 7 and 8 for venting of calibration gas.
•Allow gas to flow for the time required for calibration of the sensor/transmitter instrument.
Sample Bag
Tubing
Regulator
Gas Cylinder
Figure 6: Filling Sample Bag from Gas Cylinder
7
Page 12
ENMET CorporationGas Sampling Unit
from escaping into environment
Inlet Port
Outlet Port
Calibration
Inlet Port
Calibration
Gas Bags
Outlet Port
Outlet port without exhaust line
requires a secondary gas bag to
collect calibration gas to prevent it
Figure 7: Venting Calibration Gas to a Gas Bag
Gas Bag
Figure 8: Venting Calibration Gas to an Exhaust Line
Outlet Port with exhaust
line to proper ventilation
area does not require a
secondary gas bag.
8
Page 13
Gas Sampling UnitENMET Corporation
6.0 Maintenance6.0 Maintenance
The flow rate of the sampling pump should be checked occasionally. The sampling pump has a diaphragm, which
may ware out. Wear on the diaphragm has a direct influence of flow rate. If the flow rate decreases, and there is no
restriction in the air line, the diaphragm may need replacing. There are two styles of diaphragm pump that have been
used in the Gas Sampling Unit. See illustrations in sections 6.1 and 6.2 to determine the replacement part numbers and
procedures for maintenance.
6.1 Pump Maintenance for Pump 04018-018
Instructions for replacing diaphragm of ENMET pump part number 04018-018
If the diaphragm becomes damaged or torn, it can be replaced.
Replacement diaphragm ENMET part number 04018-017.
Figure 9: 04018-018 Pump Features
1. Before proceeding, see if diaphragm is torn.
Stretch diaphragm by lifting armature. This will
expose a torn spot.
2. Free armature assembly and diaphragm.
Pop-off diaphragm using thumbs.
3. Swing armature up to allow removal of diaphragm.
9
Page 14
ENMET CorporationGas Sampling Unit
4. Remove diaphragm from armature by pulling it
over the retaining screw.
5. Replace diaphragm. –Wet new diaphragm hole
liberally with water.
6. Pop new diaphragm onto armature screw post.
7. Wet with water inside wall and lip of diaphragm.
8. Press diaphragm onto valve housing by pressing
armature down.
10
Page 15
Gas Sampling UnitENMET Corporation
Pump Arm
Check Valve
Diaphragm
Mounting
Star Head
6.2 Pump Maintenance for Pump 04018-118
For the maintenance of ENMET part number 04018-118.
Screw
2 places
Housing
Screws
3 places
Top ViewSide View
Figure 10: 04018-118 Pump Features
6.2.1 Pump Diaphragm Replacement
If the diaphragm becomes damaged or torn, it can be replaced.
Replacement diaphragm ENMET part number 04018-117.
Figure 11: Diaphragm Details
Remove 2 star head screws and pump arm. See figures 10 and 11.
Remove damaged diaphragm from pump arm and replace with new diaphragm.
Reattach pump arm and verify diaphragm is properly sealed to check valve housing.
11
Page 16
ENMET CorporationGas Sampling Unit
6.2.2 Check Valve Housing Replacement
If the check valve becomes damaged or to warn to operate correctly it can be replaced.
Pump repair kit ENMET part number 04018-116.
WARNING: The check valve housing and associated gasket must be installed in the proper position for the pump to operate
correctly. If they are installed improperly the pump will flow in the wrong direction.
Remove the outlet fittings, pump arm with diaphragm and note the orientation of the check valve hosing and gasket.
See figures 12 and13.
Verify that gasket and housing are in the proper position.
Verify GasketInsideOutside
Verify Housing position – Inside and Outside
Figure 13: Proper Orientation of Check Valve Housing and Gasket
Replace check valve housing with flat head screw.
Verify proper position of check valve housing.
Reattach pump arm and reseal diaphragm
Reattach outlet fittings.
12
Page 17
Gas Sampling UnitENMET Corporation
7.0 Warranty7.0 Warranty
ENMET warrants new instruments to be free from defects in workmanship and material under normal use for a period of
one year from date of shipment from ENMET. The warranty covers both parts and labor excluding instrument calibration
and expendable parts such as calibration gas, filters, batteries, etc... Equipment believed to be defective should be returned
to ENMET within the warranty period (transportation prepaid) for inspection. If the evaluation by ENMET confirms that
the product is defective, it will be repaired or replaced at no charge, within the stated limitations, and returned prepaid to
any location in the United States by the most economical means, e.g. Surface UPS/FedEx Ground. If an expedient means
of transportation is requested during the warranty period, the customer is responsible for the difference between the most
economical means and the expedient mode. ENMET shall not be liable for any loss or damage caused by the improper use
of the product. The purchaser indemnifies and saves harmless the company with respect to any loss or damages that may
arise through the use by the purchaser or others of this equipment.
This warranty is expressly given in lieu of all other warranties, either expressed or implied, including that of
merchantability, and all other obligations or liabilities of ENMET which may arise in connection with this equipment.
ENMET neither assumes nor authorizes any representative or other person to assume for it any obligation or liability other
than that which is set forth herein.
NOTE: When returning an instrument to the factory for service:
§ Be sure to include paperwork.
§ A purchase order, return address and telephone number will assist in the expedient repair and return of your unit.
§ Include any specific instructions.
§ For warranty service, include date of purchase.
§ If you require an estimate, please contact ENMET.
There are Return for Repair Instructions and Form on the last pages of this manual. This Form can be copied or used
as needed.
13
Page 18
ENMET CorporationGas Sampling Unit
Notes:
14
Page 19
PO Box 979
680 Fairfield Court
Ann Arbor, Michigan 48106-0979
734.761.1270 Fax 734.761.3220
Returning an Instrument for Repair
ENMET instruments may be returned to the factory or any one of our Field Service Centers for
regular repair service or calibration. The ENMET Repair Department and Field Service Centers
also perform warranty service work.
When returning an instrument to the factory or service center for service, paperwork must be
included which contains the following information:
Ø A purchase order number or reference number.
Ø A contact name with return address, telephone and fax numbers
Ø Specific instructions regarding desired service or description
of the problems being encountered.
ØDate of original purchase and copy of packing slip or invoice
for warranty consideration.
ØIf a price estimate is required, please note it accordingly and be
sure to include a fax number .
Providing the above information assists in the expedient repair and return of your unit.
Failure to provide this information can result in processing delays.
ENMET charges a one hour minimum billing for all approved repairs with additional time billed
to the closest tenth of an hour. All instruments sent to ENMET are subject to a minimum $30
evaluation fee, even if returned unrepaired. Unclaimed instruments that ENMET has received
without appropriate paperwork or attempts to advise repair costs that have been unanswered,
after a period of 60 days, may be disposed of or returned unrepaired COD with the evaluation
fee.
Service centers may have different rates or terms. Be sure to contact them for this information.
Repaired instruments are returned by UPS/FedEx Ground and are not insured unless
otherwise specified. If expedited shipping methods or insurance is required , it must be
stated in your paperwork.
Note: Warranty of customer installed components.
If a component is purchased and installed in the field, and fails within the warranty term, it can be
returned to ENMET and will be replaced, free of charge, per ENMET’s returned goods procedure.
If the entire instrument is returned to ENMET Corporation with the defective item installed, the
item will be replaced at no cost, but the instrument will be subject to labor charges at half of the
standard rate.
Page 20
Page 21
Repair Return Form
Mailing Address:
ENMET Corporation
PO Box 979
Ann Arbor, Michigan 48106
q UPS:q Groundq 3 Day Selectq Next Day Air q ND Air Saver q 2-Day Air
q Federal Express:q Groundq Express Saver q P-1q Standardq 2-Day Air
q FedEx Account number: ________________________
Would you like ENMET to insure the return shipment?
q Noq YesInsurance Amount: $_________________
Page 22
Loading...
+ hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.