Emerson Keystone Figure 969 Hopper Installation And Operating Manual

Page 1
KEYSTONE FIGURE 969 HOPPER KNIFE GATE VALVES
InstallatIon and operatIng manual
Gland packing replacement instructions for F969 hopper valves
Gate (2)
Packing (6)
Packing join
PACKING REPLACEMENT
For optimum performance, the packing material should be replaced whenever the valve has been disassembled for routine maintenance. This is a very simple procedure, which can be done leaving the valve in the pipeline. Correct packing is essential for leak-free operation. Use Emerson’s preformed and pre-cut Packing Replacement Kits for best results. Ensurepacking material selected is suitable forthe service.
Strip-down procedure:
1. Ensure pipeline is not pressurized and anyhazardous medium is drained away.
2. Close valve, remove clevis pins/bolts.
3. Use actuator or handwheel to raise spindle
clear of gate.
4. Remove all upstand bolts.
5. Remove actuator sub-assembly (handwheel,upstand, gearbox and spindle or cylinder actuator).
NOTE
Heavy valves will require a chain block or crane.
REPACKING PROCEDURE
NOTE
Care should be taken to stagger the mitred joints in each layer of packing to the opposite side of the gland follower, e.g:
• 1st packing layer joint to the front of the valve.
• 2nd packing layer joint to the rear of the valve.
• 3rd packing layer joint to the front of the valve.
1. Press first layer of gland packing (6) into gland cavity by hand, then repeat the process with the gland packing ensuring the joints of the two layers are on opposing sides of the cavity.
2. Firmly press the packing (6) around gate and into gland cavity.
6. Remove gland follower nuts (8) and
washers(7), then remove gland follower (3)
from gate(2).
7. Remove packing (6) from gland cavity.
8. Clean gland cavity.
9. Fit the gland follower over the gate (2).
10. If the gate has excessive irregularities or abrasion and requires replacement, then this will necessitate removal of the valve from the pipeline, to prevent damage to thevalve seats.
© 2017 Emerson. All Rights Reserved.Emerson.com/FinalControl VCIOM-02873-EN 17/10
Page 2
10
12, 13
KEYSTONE FIGURE 969 HOPPER KNIFE GATE VALVES
InstallatIon and operatIng manual
REASSEMBLY
1. Replace gland follower (3) onto the gate (2)
and push down until firmly on valve.
2. Coat stud (9) threads with anti-seize compound. Replace the gland follower washers (7) and gland follower nuts (8) onto each stud (9), screw them down equally, donot over tighten.
3. Refit the upstand (10) and handwheel.
Replace both upstand bolts (12) and upstand washers.
4. Use actuator (handwheel or pneumatic actuator) to lower spindle to align clevis andgate.
5. Fit clevis bolts (14).
6. Assembly is complete, actuate the valve to check that the gate is seating properly in theclosed position.
7. When commissioning, gland follower nuts (8) may require tightening for final gland packing adjustment.
7, 8
9
6
10
14 2
3
12, 13
NOTE
To minimize risk to personnel, Emerson recommend the use of purpose built guards and shrouds. Refer to the Emerson data sheet or consult factory for details.
CAUTION
Do NOT over tighten gland packing as it will cause excessive resistance to gate movement.
Neither Emerson, Emerson Automation Solutions, nor any of their affiliated entities assumes responsibility for the selection, use or maintenance of any product. Responsibility for proper selection, use, and maintenance of any product remains solely with the purchaser and end user.
Keystone is a mark owned by one of the companies in the Emerson Automation Solutions business unit of Emerson Electric Co. Emerson Automation Solutions, Emerson and the Emerson logo are trademarks and service marks of Emerson Electric Co. All other marks are the property of their respective owners.
The contents of this publication arepresented for informational purposes only, and while every effort has been made to ensure their accuracy, they are not to be construed as warranties or guarantees, express or implied, regarding the products or services described herein or their use or applicability. All sales are governed by our terms and conditions, which are available uponrequest. We reserve the right to modify or improve the designs or specifications of such products at any time without notice.
Emerson.com/FinalControl
2
Loading...