INSTALLATION INSTRUCTIONS (1
)
AC & Self-Powered LED Exit Signs Installation Instruction
BACK MOUNTING - DIAG. 1
IMPORTANT SAFEGUARDS
When using electrical equipment, basic safety precautions should
always be followed including the following:
1.
READ AND FOLLOW ALL SAFETY
INSTRUCTIONS
2. Do not use outdoors.
3. Do not mount near gas or electric heaters.
4. Do not let power cords touch hot surfaces.
5. Use caution when servicing batteries. Avoid possible shorting.
6. Equipment should be mounted in locations and at heights where
it will not readily be subjected to tampering by unauthorized
personnel.
7. The use of accessory equipment not recommended by the
manufacturer may cause an unsafe condition.
8. Do not use this equipment for other than intended use.
9. Before wiring to AC service, turn off AC power at fuse or circuit
breaker.
10. Disconnect AC power and unplug battery before servicing.
11. When relamping, only use lamps specified in the fixture.
12. Battery in this unit may not be fully charged. After the AC service
is supplied to unit, let the battery charge up for at least 24 hours
before performing any tests.
5
2
SIDE MOUNTING - DIAG. 2
1
6
5
2
CEILING MOUNTING - DIAG. 3
s
10
9
3
1
8
6
4
3
8
7
12
11
9
10
SAVE THESE INSTRUCTIONS
INSTALLAT
BACK MOUNTING - See diagram 1
1. Drill 1/4" holes into oblong knock outs on back plate (3) that
correspond to junction box (10) holes to be used.
2. Feed the transformer input leads through center hole and make the
proper connections. If using 120VAC, connect the black and white
leads to the building utility. If using 347VAC , connect the red
and white leads to the building utility. Cap off unused wire. If the
unit is self-powered, be sure to snap battery connector together.
3. Feed excess wire into junction box and secure back plate (3) to
junction box (10).
4. Snap in arrows (5) on EXIT panel (2) as required. Then snap EXIT
panel (2) to housing, top first and then bottom.
ION
6
2
5
WIRING
120VAC
347VAC
INPUT
INPUT
RED
WHITE
10
9
11
12
7
8
3
1
PARTS DESCRIPTION
1) Plastic housing
2) EXIT panel
3) Back plate
4) Mounting hole cover
5) Snap in directional arrow
BLACK
6) Red or green diffuser
7) Canopy
8) Canopy screws
9) Wire nuts
10) Junction box (building utility)
11) Crossbar
12) Crossbar screws (not provided)
Page 1
INSTALLATION INSTRUCTIONS (
SIDE MOUNTING - See diagram 2
1. Attach crossbar (11) to junction box (10). Set the crossbar so that the
longer blade is touching the junction box.
2. Open the EXIT housing. Feed the transformer input leads through side
hole, being sure to secure wire into wire guides molded at the edges of
the sign.
3. Attach sign to canopy (7) by inserting canopy into sign at an angle, then
twist to secure.
4. Make the proper supply lead connections. If using 120VAC, connect the
black and white leads to the building utility. If using 347VAC, connect the
red and white leads to the building utility. Cap off unused wire. If the
unit is self-powered, be sure to snap battery connector together.
5. Push excess wire into junction box and align holes in canopy (7) with
those in crossbar(11).Using screws supplied, tighten canopy to crossbar
so that canopy is securely fastened and tight against wall.
6. Snap in arrows ( 5 ) to EXIT panel ( 2 ) as required. Then snap EXIT
panel (2) to housing, top first and then bottom.
2)
ASSEMBLING CANOPY TO HOUSING
Insert canopy into housing at a 20 degree
angle and twist. Quick snap is now firmly
locked.
CAUTION
Trying to remove canopy after it is locked
in place may cause damage.
CEILING MOUNTING - See diagram3
1. Attach crossbar (11) to junction box (10). Set the crossbar so that the
longer blade is touching the junction box.
2. Open the EXIT housing. Feed the transformer input leads through top
hole, being sure to secure wire into wire guides molded at the edges of
the sign.
3. Attach sign to canopy by inserting canopy into sign at an angle, then twist
to secure.
4. Make the proper supply lead connections. If using 120VAC, connect the
black and white leads to the building utility. If using 347VAC, connect the
red and white leads to the building utility. Cap off unused wire. If the
unit is self-powered, be sure to snap battery connector together.
5. Push excess wire into junction box and align holes in canopy ( 7 ) with
those in crossbar (11). Using screws supplied, tighten canopy to crossbar
so that canopy is securely fastened and tight against ceiling.
6. Snap in arrows ( 5 ) to EXIT panel ( 2 ) as required.Then snap EXIT panel
( 2 ) to housing, top first and then bottom.
OPENING EXIT PANEL
Use flat blade screwdriver to
open. Insert screwdriver into
the slot and gently pry off the
panel.
MANUAL TEST
1) Manual battery test switch
2) Red LED (indicates normal operation)
ING
1
2
CAUTION
Battery connector is shipped disconnected.
It must be connected at installation.
Page 2