Emco A1100EVR GUARDIAN Installation Instructions Manual

Page 1
A1100EVR GUARDIAN
OVERFILL PREVENTION VALVE
WITH THREADED BOTTOM
INSTALLATION INSTRUCTIONS
Permanent Identification:
(1) Collar #566679 with: (1) Tube, Seals-All Sealant #566726
(1) O-ring #480049 installed (1) Counter Sink Indenter #564416 (1) Drop Tube O-ring #569461 installed (4) Rivets #564412
(1) Warning Plate #564420 (1) Hose Clamp #564421
Packing List:
Month/Year of Manufacture
CAUTION:
1. Always barricade to keep pedestrians and vehicles from accessing the storage tank area during preventive maintenance and/ or compliance testing of the EMCO phase I EVR system.
2. If the underground storage tank is equipped with a ball float vent valve, make sure it does not extend below the positive shut-off point of the A1100EVR overfill prevention valve. If so, the ball float valve must be removed to allow proper operation of the A1100EVR overfill prevention valve.
3. Never disconnect the delivery elbow from the fill adapter when the A1100EVR overfill prevention valve has reached the positive shut-off point of 95% total capacity. Note the tank delivery hose is full and must not be dis­connected until enough fuel has been evacuated from the underground stor­age tank. This will allow the tank delivery hose to drain, and to safely discon­nect from the fill adapter. Premature disconnection will result in a hazardous spill and/or a potential for personal injury and property damage.
4. Once the A1100EVR overfill prevention valve is completely assembled, the
Seals-All Sealant must cure for a minimum of 24 hours before installing into the underground storage tank.
• 13/64” Drill Bit • Hacksaw w/ fine tooth • Pipe Thread Sealant Compound
• Rivet Gun • Hand file w/ fine blade • 150 Grit Size Emery Cloth
• Power Drill • Marker • De-burring Tool w/ #10 Blade
• Tape Measure • Hammer • Fabric Strap Wrench (2)
• EMCO Drill Fixture p/n 566675
Service Tool Required:
Model #
Page 2
7
Page 3
3
Place tape measure here
Measurement C, cut length
Figure 3
2. Find measurement B from the chart below, the distance from the maximum
fluid level allowed to the inside top of the tank. The calculations are based on cylindrical tanks with flat ends. For exact dimensions, consult the manu­facturer’s tank charts. Use the actual capacity of the tank for calculations. NFPA30 Guidelines limit tank fill to 95%.
95% Shut-off
Tank Diameter B Dimension
Feet Meters Inches mm
6.5’ 1.98 7.5" 190
7.0’ 2.13 8.0" 203
7.6’ 2.29 9.0" 229
8.0’ 2.44 9.5" 241
8.2’ 2.50 9.5" 241
8.5’ 2.59 10.0" 254
9.0’ 2.74 10.5" 267
9.5’ 2.90 11.0" 279
10.0’ 3.05 11.5" 292
12.0’ 3.66 14.0" 336
IMPORTANT: The A1100EVR overfill prevention valve is not recommended for tanks under 6.5 feet in diameter.
3. Top Tube Cut Location, Measurement C: Add measurements A and B.
Place tape measure at the 95% fill mark on the valve and measure up the tube as shown. Mark and cut the tube at the C measurement length.
Example: Top drop tube cut length, C = A + B
Page 4
5
Page 5
14. Once finished with steps 11 through 13, clean and remove all excess sealant around the top of the A1100EVR collar and rivets.
IMPORTANT: The Seal-All sealant must cure for a minimum of 24 hours before installing into the underground storage tank.
5
10. Apply a 1/2 inch bead of Seals­All Sealant around the 480049 o-ring and outside area of the A1100EVR collar. Verify the o-ring is properly secured inside the machined groove. Do not apply sealant to the 569461 drop tube o-ring.
11. Slide the A1100EVR collar inside
the top end of the drop tube and align the four holes.
12. Using the indenter tool and a hammer, apply a sharp blow to counter sink each individual hole before attempting to install the mounting rivets.
13. Using only the factory supplied rivets, apply a good amount of the Seals-All Sealant around the base of each rivet before installing into each of the four holes. Using the rivet gun, permanently fasten the A1100EVR collar to the top of the drop tube.
A1100EVR Collar to Top Drop Tube
9. Remove the o-ring (p/n 480049)
from the A1100EVR collar groove. Lightly sand the outside area using 150-grit emery cloth. Clean and remove any sanding debris. Re-install o-ring.
569461
480049
Page 6
Page 7
Place tape measure at the end of the top tube (riser collar) and measure down to distance E. Carefully cut the drop tube to the required length. Use a hacksaw equipped with a fine tooth blade to ensure a straight 90-degree cut.
An angled cut is permissable, but the 4”-6” dis­tance from the bottom of the tank must corre­spond to the top of the cut as shown.
Spill Containment
Tape Measure
Riser Pipe
Figure 4
ED
20. Remove all metal chips or debris left from cutting or drilling. Shake the
A1100EVR overfill prevention valve in a vertical position. Verify that the A1100EVR drop tube o-ring is installed properly. Locate the A1100EVR overfill prevention valve over the tank fill riser opening with the A1100EVR collar pointing upward. Carefully lower the A1100EVR overfill prevention valve into the tank until the A1100EVR collar is resting on the riser pipe.
21. Install warning plate on the riser using the hose clamp provided.
7
19. Bottom Tube Cut Location, Measurement E:
Find measurement D, the distance between the top of the riser pipe and the bottom of the tank as shown in Figure 3. PEI Recommended Practice suggests 4”-6”.
Cut Length E = D - 5”
A1100EVR Overfill Prevention Valve to Tank Fill Riser
Top of angled cut
Bottom of tank
4”-6”
4”-6”
IMPORTANT: Do not use a power saw, pipe or tubing cutter as this may result in damage to the bottom of the lower drop tube, voiding warranty.
Page 8
Loading...