Elkay MB30-2 Installation Manual

17-1/4' MIN
(438mm)
MOUNTING BOX INSTALLATION
ELECTRICAL & PLUMBING ROUGH-IN
MB30 , MB30-2
~
~INLET
"
8"
(203mm)
-
3"
(76mm)
/ WALL LINE
""'~
~
2.
/
/
51-1/4'
(1302mm)
27'TO 27-1/4'
(686mm TO 692mm)
PROVIDES
35.3/4' TO 36'
(908mm TO 914mm)
ORIFICE HEIGHT
CHECK LOCAL CODE)
11.3/4' MIN (298mm) -
(4) ANCHORING
HOLES EACH SIDE
(SEE NOTE 4)
~
19'MIN
(483mm) ~> WATER INLET
30'MIN
(762mm)
~
DRAIN OUTLET
3/81PS
""'
\
\
\
\
""
~1-1/4" IPS
31-1/4"
(794mm)
48-7/8"
(1241mm)
6-3/4"
(171mm)
" I
1. ELECTRICAL, WATER AND DRAIN CONNECTIONS CAN BE MADE FROM RIGHT OR LEFT SIDE.
2. 30" X 19. MIN. WIDTH AREA BELOW FOUNTAIN FOR WHEELCHAIR USE. FINISH WALLS AND FLOOR AS REQUIRED.
3. INSTALL MOUNTING BOX WITH ELECTRICAL JUNCTION BOX AT TOR
4. FOR WALL BOX INSTALLATION USE SCREWS OR BOLTS (MIN. OF 8) THRU HOLES OR KNOCK-OUTS PROVIDED ON EACH SIDE. (SCREWS OR BOLTS TO BE FURNISHED BY INSTALLER.)
""
"'
""
---
-
7-11/16"
(195mm)
3-3/4"
(95mm)
t
2-3/16"
(56mm)
2-3/4"
(70mm)
3-3/4"
(95mm)
92855-C
REV: A
Loading...