Elkay ERPAVR8C, LPFEA8C Installation, Care & Use Manual

Page 1
ERPA8C ERPAVR8C LPFEA8C
Installation/Care/Use Manual
SwirlFlo® Refrigerated Fountains with FLEXI-GUARD
®
41
SEE FIG. 11
36, 38, 39
SEE FIG. 4 OR 5
40
37
35
37
Installer
To assure you install this model easily and correctly, PLEASE READ THESE SIMPLE INSTRUCTIONS BEFORE STARTING THE INSTALLA­TION. CHECK YOUR INSTALLATION FOR COMPLIANCE WITH PLUMBING, ELECTRICAL AND OTHER APPLICABLE CODES. After installation, leave these instructions inside the fountain for future reference.
IMPORTANT
ALL SERVICE TO BE PERFORMED BY AN AUTHORIZED SERVICE PERSON
IMPORTANT! INSTALLER PLEASE NOTE.
THE GROUNDING OF ELECTRICAL EQUIPMENT SUCH AS TELEPHONE, COMPUTERS, ETC. TO WATER LINES IS A COMMON PROCEDURE. THIS GROUNDING MAY BE IN THE BUILDING OR MAY OCCUR AWAY FROM THE BUILDING. THIS GROUNDING CAN CAUSE ELECTRICAL FEEDBACK INTO A FOUNTAIN, CREATING AN ELEC­TROLYSIS WHICH CAUSES A METALLIC TASTE OR AN INCREASE IN THE METAL CONTENT OF THE WATER. THIS CONDITION IS AVOIDABLE BY USING THE PROPER MATERIALS AS INDICATED. ANY DRAIN FITTINGS PROVIDED BY THE INSTALLER SHOULD BE MADE OF PLASTIC TO ELECTRICALLY ISOLATE THE FOUNTAIN FROM THE BUILDING PLUMBING SYSTEM.
1/4" O.D. TUBE WATER INLET TO COOLER
FIG. 1
FIG. 3
NOTE: WATER FLOW
DIRECTION
45
3/8" O.D. UNPLATED COPPER TUBE CONNECT COLD WATER SUPPLY
42
BASIN
43
44
BUILDING WATER INLET
SERVICE STOP (NOT FURNISHED)
1
2
FIG. 4
FIG. 2
NOTE: WHEN INSTALLING REPLACEMENT BUBBLER
3
AND PEDESTAL, TIGHTEN NUT (ITEM 5 OR 51) ONLY TO HOLD PARTS SNUG
4
IN POSITION. DO NOT OVER TIGHTEN.
5
49
50
51
FIG. 5
97674C (REV. B - 5/01)
Page 2
ERPA8C ERPAVR8C LPFEA8C
MODEL LPFEA8C
LEGEND A = 3/8" O.D. TUBE CONNECT (CHILLER WATER OUTLET) B = 3/8" O.D. TUBE CONNECT (CHILLER WATER INLET) SHUT OFF VALVE BY OTHERS C = 1-1/4" TRAP NOT FURNISHED D = ELECTRICAL INLET
97674C (REV. B - 5/01)
FIG. 6
PAGE 2
Page 3
ERPA8C ERPAVR8C LPFEA8C
INSTALLATION INSTRUCTIONS
1. Install remote chiller. Remove front panel of chiller. Remove and discard cardboard inner pack from between compressor and side panel. Slide chiller onto the shelf and position it to the left side of shelf. (See Figure 6) NOTE: Building construction must allow for adequate air flow on both sides, top, and back of chiller. See chiller instructions for additional instructions.
2. Make water supply connections. Install a shut-off valve and union connection to building water supply (valve and union not provided). Turn on the water supply and flush the line thoroughly.
3. ERPA MODELS: Make connection between remote chiller and building supply line. Inlet port is marked on the chiller (1/4" O.D. copper tube). Bend the copper tube (provided) at an appropriate length from chiller to opening in frame. Install a 1/4" x 3/8" union (provided) on the marked chiller inlet port. Connect building supply line to union. (See Figure 7) LPFEA MODEL: Mount filter head assembly to side of chiller (See Figure 9). Make connection between filter and building supply line (3/8" O.D. tube not provided). Inlet port is marked on the chiller (1/4" O.D. copper tube). Install a 1/4" x 1/4" union (provided). Bend the copper tube (provided) at an appropriate length from the filter and connect to the union on the chiller. (See Figure 8).
4. Hang the upper panel on the mounting frame hanger. Align holes in the panel with the holes in the mounting frame. Be sure that panel is engaged with hanger at top of frame before releasing it.
5. Install the fountain. Remove access cover plate on underside of fountains and save the screws. Mount the fountain to the upper panel and the wall frame with (4) 5/16" x 1 3/4" (44mm) long bolts and nuts (provided). Install spacers on bottom two bolts. Tighten securely.
6. Attach waste tube (1 1/4" OD) to 1 1/4" OD slip trap (provided by others).
7. ERPA MODELS: Make connections between remote chiller outlet tube and fountain strainer. Outlet port is marked on the chiller (3/8" O.D. copper tube). Install a 3/8" x 3/8" union (provided) on the marked chiller outlet port. Insert the 3/8" unplated copper water line (provided) into the union and the inlet side of the strainer by pushing it in until it reachs a positive stop, approximately 3/4" (19mm). Connect 1/4" copper tubing coming from fountain to the strainer. Turn on water supply and check for leaks. DO NOT
SOLDER TUBES INSERTED INTO THE STRAINER AS DAMAGE TO THE O-RINGS MAY RESULT. (See Figure 7). LPFEA MODEL: Make connections between remote chiller outlet tube and fountain strainer. Outlet port is marked on the chiller
(3/8" O.D. copper tube). Install a 3/8" x 3/8" union (provided) on the marked chiller outlet port. Insert the 3/8" unplated copper water line (provided) into the union and the inlet side of the strainer by pushing it in until it reaches a positive stop, approximately 3/4" (19mm). Connect 1/4" copper tubing coming from fountain to the strainer. Turn on water supply and check for leaks. DO NOT SOLDER TUBES INSERTED INTO THE STRAINER AS DAMAGE TO THE O-RINGS MAY RESULT. (See Figure 8).
8. These products are designed to operate on 20-105 PSIG supply line pressure. If inlet pressure is above 105 PSIG, a pressure regulator must be installed in the supply line. Any damage caused by reason of connecting these products to supply line pressures lower than 20 PSIG or higher than 105 PSIG is not covered by warranty.
9. Make electrical connections to the chiller. See chiller instructions.
10. Check stream height from bubbler. Stream height is factory set at 35 PSI. If supply pressure varies greatly from this, turn adjustment screw on regulator (Item 12). Clockwise adjustment will raise stream height and counter-clockwise will lower stream height. For best adjustment stream should hit basin approximately 6 1/2" from the bubbler.
11. Mount lower panel. Loosen the (2) #10-24 x 5/8" (16mm) screws at frame bottom lip. Slide upper tongue of lower panel under lower edge of already installed upper panel. Tighten previously loosened screws securely.
12. Replace bottom access panel to fountain basin using screws provided. Tighten securely.
TROUBLE SHOOTING AND MAINTENANCE
1. Orifice Assy: Mineral deposits on orifice can cause water flow to spurt or not regulate. Mineral deposits may be removed from orifice with a small round file not over 1/8" diameter or a small diameter wire. CAUTION: Do not file or cut orifice materials.
2. Stream Regulator: If orifice is free of material deposits, regulate flow according to instruction 10 stated above.
3. Actuation of Quick Connect Water Fittings: Cooler is provided with lead-free connectors which utilize an o-ring water seal. To remove tubing from the fitting, relieve water pressure, push in on the gray collar while pulling on the tubing (See Fig. 2) To insert tubing, push tube straight into the fitting until it reaches a positive stop, approximately 3/4".
4. Caution: Cleaning of Bronzetone Models requires special care. Outer surfaces must be cleaned with a mild detergent or mixture of vinegar and water only, rinsed and wiped dry. Abrasive and acidic cleaners may eventually damage the Bronzetone finish.
TO BUBBLER
CHILLER OUTLET
FIG. 7
ERPA8C TUBE ROUTING
46
33
32
CHILLER INLET
TO BUBBLER
CHILLER OUTLET
FIG. 8
PAGE 3
LPFEA8C TUBE ROUTING
46
32
34
WATER INLET
97674C (REV. B - 5/01)
Page 4
1
2
3 4
5 6 7
8
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35
36
37 38
39 40
41
42
43 44 45 46 47 48 49 50 51
NS NS NS
PART NO.ITEM NO.
51349C 56044C 40322C 45383C 50934C 50168C 56042C 75580C 21804C 21810C 21833C 21806C 70426C 50986C 40045C 61313C 15005C 75555C 50198C 70410C 70425C 70378C 21705C 70002C 21844C
40206000
112627543890
22490C 51294C 51299C 21803C 70792C 70818C 70822C 70823C 70870C 70745C 70683C 26833C 28258C 21823C 21832C
111008343890
21846C 21836C 70055C 28183C 28184C
55001026
21827C 45336C 45337C 50074C 50377C 45330C 55996C 62086C 56092C 45392C
100322740560
15009C 70199C 70020C
74080053
ERPA8C ERPAVR8C LPFEA8C
PARTS LIST
DESCRIPTION
Bubbler Assy Bubbler Assy (Bronzetone) Orifice Assy Orifice Assy (Bronzetone) Housing Assembly Pedestal Pedestal (Bronzetone) Bubbler Locknut Push Bar Mounting Bracket Push Bar Assy Push Bar Assy (Bronzetone) Regulator Activator Arm Screw - #8-32 X .25 THMS Holder-Regulator Hex Nut Regulator Retaining Nut Clip Bushing - Nylon Rod - Pivot Rod - Pivot Rod - Push Clip - Push Rod Screw - #10 X .50 HHSM Pivot Rod Bracket Retainer Screw - #10-24 X .37 PHTC Filter Mounting Bracket Filter Head Assy Filter Assy Regulator Mounting Bracket Screw - #8-18 x .75" PH Elbow - 3/8" (10mm) Fitting - Superseal 1/4" (6mm) Fitting - Superseal 3/8" (10mm) Union - 3/8 X 3/8 Union - 3/8 X 1/4 Union - 1/4 X 1/4 Lower Panel Lower Panel (Bronzetone) Fountain Body & Shell Fountain Body & Shell (Bronzetone) Screw - #10-24 X .62 HHMS Cover Plate Cover Plate (Bronzetone) Speed Nut Back Panel Back Panel (Bronzetone) Basin - Swirlflow Basin - Swirlflow (Bronzetone) Strainer & Ferrule Assy Strainer & Ferrule Assy (Bronzetone) Gasket - Tailpipe Gasket - Tailpipe Waste Arm Strainer Tube - Water In Poly Tubing 48" (Cut To Length) Bubbler-(VR Model Only) Gasket-(VR Model Only) Bubbler-Nipple-(VR Model Only) Bolt - 5/16-18 x 1.75 Lg. Nut - Hex 5/16-18 Spacer
FIG. 9
FIG. 10
15
14
6
9
25
30
28
16
48
24
29
31
26
15
8
22
15
7
15
18
22
20
27
11
12
13
19
15
10
47
20
21
15
17
23
FIG. 11
97674C (REV. B - 5/01)
www.DrinkingFountainDoctor.com 800-518-5388
PAGE 4
Loading...