Elkay EDFAC11PBC-A, EDFAC11PBC Installation Manual

SEE FIG. 5
EDFAC1 1PBC*A EDFBC12PBC*A
Installation/Care/Use Manual
SEMI AND FULLY RECESSED WALL
MOUNT CUSPIDOR ONLY
27
26
SEE FIG. 7
EDFAC11PBC EDFBC12PBC
Installer T o assure you install this model easily and correctly , PLEASE READ THESE SIMPLE INSTRUCTIONS BEFORE ST ARTING TH INST ALLATION. CHECK YOUR INST ALLA­TION FOR COMPLIANCE WITH PLUMBING, ELECTRICAL AND OTHER APPLICABLE CODES. After installation, leave these instructions inside the fountain for future reference.
IMPORTANT
ALL SERVICE TO BE PERFORMED BY AN AUTHORIZED SERVICE PERSON
IMPORTANT! INSTALLER PLEASE NOTE.
THE GROUNDING OF ELECTRICAL EQUIPMENT SUCH AS TELEPHONE, COMPUTERS, ETC. T O WATER LINES IS A COMMON PROCEDURE. THIS GROUNDING MA Y BE IN THE BUILDING OR MA Y OCCUR AW A Y FROM THE BUILDING . THIS GROUNDING CAN CAUSE ELECTRICAL FEEDBACK INTO A FOUNTAIN, CREATING AN ELEC­TROLYSIS WHICH CAUSES A MET ALLIC TASTE OR AN INCREASE IN THE METAL CONTENT OF THE WA TER. THIS CONDITION IS A VOIDABLE BY USING THE PROPER MATERIALS AS INDICA TED. ANY DRAIN FITTINGS PROVIDED BY THE INST ALLER SHOULD BE MADE OF PLASTIC TO ELECTRICALL Y ISOLA TE THE FOUNT AIN FROM THE BUILDING PLUMBING SYSTEM.
INST ALLATION INSTRUCTIONS
1. Remove lower panel from cuspidor by removing the two screws at the lower corners. Rotate the bottom of the panel out and pull gently downward to remove.
2. Install spreader assembly into cuspidor body and attach straight end of copper tubing as shown in Figure 5. Route the tubing into the cuspidor compartment and install cuspidor body.
3. Water inlet tube to be 3/8" O.D unplated copper. Waste tailpiece for slip trap is 1-1/4" O.D. Contractor to supply waste trap in accordance with local codes.
4. Connecting lines to be unplated copper and thoroughly flushed to remove all foreign matter before connection to cuspidor assembly. The furnished strainer should be inst alled in the supply line. See Figure 1 DO NOT SOLDER TUBES INSERTED INTO THE
STRAINER AS DAMAGE TO THE O-RINGS MAY RESUL T.
5. Connect the cuspidor to supply line with shut off valve and install a 3/8" (10mm) water line between the valve and cuspidor.
FIG. 1 FIG. 2
1/4" O.D. TUBE WATER INLET TO COOLER
3/8" O.D. UNPLATED COPPER TUBE CONNECT COLD WATER SUPPLY
BUILDING WATER INLET
NOTE: WATER FLOW
DIRECTION
SERVICE STOP (NOT FURNISHED)
97164C (Rev. D - 1/05)
EDFAC1 1PBC*A EDFBC12PBC*A
FINISHED FLOOR LINE
EDF AC1 1PBC ROUGH-IN
FIG. 3
C = WALL HANGER - 12" (305mm) x 1" (25mm) FURNISHED LOOSE.
D = MOUNTING HOLES FOR 1/4" DIA. (6mm) SCREWS.
97164C (Rev. D - 1/05)
PAGE 2
LEGEND:
A = W A TER INLET LOCA TION. 3/8" O.D. UNPLA TED COPPER
TUBE CONNECT.
B = CUSPIDOR WASTE OUTLET LOCA TION.
1-1/4" O.D. DRAIN (TRAP NOT FURNISHED)
Loading...
+ 2 hidden pages