installation option to further enhance theframeappearanceand
for added visualappearance
reincluded
B. Top/Bottomhorizontal
famex 4 pcs
F. Wall bracketsx
. M5x50 screwsandanchorx
ezeltrim
Fixed Frame Projection Screen
CineWhite
uses Elite’s EDGEFREE
n includesa
absorb projector overshoot
H.M5x15screwx
ezel trim
Aeon Series
Applies to all available screen materials:
Product Description: The Aeon
The EDGE FREE® des
backlighting kit is available
Hardware and Parts List
Please make sure all parts listed below a
A. Elbow joint x 4 pcs
E. Center Support bar x 1-2
pc
®
User’s Guide
CineGrey 3D EDGE FREE® and
screen that
panel TV display. The Aeo
.
before installation.
C. Left/Right vertical
2-3 pcs G. M6 screw x 2-12 pcs
frame x 2 pcs
™ EDGE FREE®
™ technology.
n ultra-thin trim as an
. An optional LED
D. Center joints x 2 pcs
24 pcs
I. M6x12 screw x 2-12pcs J
6 pcs
M. Black Tape x 1 bagN. B
x 6 pcsO. Corner Support Bar
Rev.070216-MZ
www.elitescreens.com
K. Rubber hammer x 1 pc
(180”-200”) x 4 pcs
L. Screwdriver x 1 pc
O. Corner sleeve x 4 pcs
1
Page 2
Frame Assembly
ElbowJoint
(A)
ElbowJoint
(A)
Push
1. Insert the center joint into one of the ½ horizontal frames (B) and fasten it with the two M5x15 screws (H).
2. Insert the other ½ horizontal frame piece to the center joint and fasten also using two M5x15 screws.
3. Repeat steps 1 and 2 for assembling the second horizontal frame.
Push
Top right Frame
Center Joints
Top left Frame
Horizontal frame
4. Insert and slide in oneM6 screws (G) through the channel located on the back each horizontal frame.
M6 hex screws (G)
Note: For models 180” and above, insert and slide in four M6 screws
(two on each frame) through the channel located on the back of each
horizontal frame section (top/bottom). Insert two M6 screws on each
vertical frame section (left/right).
Horizontal long frame
Face up
Place one M6 hex screw (G) in the center for attaching the center support bar (E)
5. Insert the elbow joint (A) into each end of the horizontal frames (B)as shown below.
Horizontal long frame (B)
Rev.070216-MZ www.elitescreens.com 2
Page 3
6. Insert the two vertical short frames(C) into the elbow joint (A).
push
7. Join the remaining horizontal long frame (B) with the frame built in the previous steps as shown below.
Horizontal long frame (B)
push
Vertical short frame (C)
Note: For models 180” and above,
ensure two M6 screws (G) are
inserted on each vertical frame
before proceeding to step 7.
Face up
push
push
Horizontal Long frame (B)
Rev.070216-MZ www.elitescreens.com 3
Page 4
8. Make sure all four corners are properly in place to form a perfect square. Then fasten the four angles with the
M5x15 Screws (H).
Four corners join correctly to form a perfect
square. Use the included screwdriver (L) to
fasten the Mx15 screws (H) into each corner
by aligning the frame screw holes to the
holes in the elbow joint (A).
Screen Material Installation
1. Lay the screen material completely flat with the front facing down on a clean surface in a horizontal position. The
back side of the screen material should be placed upwards.
Note: The back side of the material has the velcro borders all around the edges.
2. Carefully and gently place the assembled frame on top the screen material as shown below. Make sure to not allow
the angle edge of the frame to come in direct contact with the screen material to avoid puncturing it.
Screen material comer
Screen material back facing up
Rev.070216-MZ www.elitescreens.com 4
Page 5
3. After all of the corners of the frame have been properly aligned, attach the material to the frame in the following
order A→B→C→D (see instructions below for details).
C
B
Attach the screen material to the corners as shown below.
A
A
D
1) Stretch the screen
material in the direction
of the arrowhead.
2) Fold over and attach
material to the velcro
strip of the frame.
4. After all four corners have been attached; please check whether the frame corners are wrapped by the screen
material. If not, please loosen the velcro connection and repeat the above steps so the frame is not exposed.
3) Fold over second side
and attach to frame
4) Repeat until all four
sides are done in the
order A, B, C, D
Note:
Represents the
screen material
Rev.070216-MZ www.elitescreens.com 5
Note: The black shaded part represents the velcro on the frame. That Velcro
end will ultimately attach with the other velcro end on the screen material.
Page 6
Proceed to attach the rest of the materialto theframeasdescribed in theillustrationsbelow.
of the
material and attach it tothevelcro
Attach in thefollowing sequence
Lay the Velcroend on thescreen
material over theVelcro
frame and keep itwithintheedge.
in the followingsequence
②
The key is to attach withinthe
middle sectionsof1 and 2. Then
continue attachingtheremaining
unattached areas.
the
remaining threesidesin the
sequence A, B, C,
5.
Grasp the middle
screen
strip on the frame
Proceed
end of the
below ①
Repeat
show below.
C
B
: a-b-c-d
A
same steps on
and then D as
D
Rev.070216-MZ
www.elitescreens.com
6
Page 7
6. If the material is too loose or tight after adjusting all four corner sides, then you will need to reattach the material.
Please follow the steps below to properly remove the screen material from the frame. This procedure will ensure
prolonging the life of the screen material.
Screen Material Removal
1. Detach the velcro from the frame.
2. Gently pull back the material to release it from the velcro connections on the corners
Pull back the screen material from
the velcro connection along the
edges of the frame to detach it.
Support bar installation (for models under 180”):
1. Position the center support bar (E) in the middle of the frame and align the hole on each end of the support bar
with the M6 hex screws (G) on the top and bottom frames. Then fasten with the M6x12 screws (I).
Move the M6 hex screw (G) to the middle area of the frames.
Center Support bar
Align the M6 screws
with the two holes.
Rev.070216-MZ www.elitescreens.com 7
Page 8
Support bar installation
(for models
center support bar (E)
hole on each end of the support barwiththe
M6x12 screws(I).
Corner support bars(
below in fig 2. Align the holeson eachend ofthecornersupportbarswith theM6 hexscrewslocated
on the vertical and horizontal framesections. Thenfasten with the
M6 hex screw(
Corner SupportBar
in the areas of the frame shown in fig1. Align the
ted at the top andbottomframe
in the areasoftheframeasshown
M6x12 screws(I
1. Position the
Then fasten with the
180” and above):
and M6 hex screws (G)
M6 hex screws (G) loca
sections.
Move the
Center Support bar
2. Position the
Figure 1
G) to these areas of the frame.
Align the M6 Screws
with the two holes
located on the Center
Support Bar.
O) and M6 Hex screws (G)
).
Align the M6
screws with the
two holes on the
Corner Support
Bars.
Rev.070216-MZ
www.elitescreens.com
8
Page 9
Notice to Installer:
Please use the following installation instructions to obtain superior optical performance from the CineGrey 3D Angular
Reflective ALR (Ambient Light Rejecting) Screen.
Make sure to follow these instructions in order for the CineGrey 3D to perform correctly.
•Angular-Reflective material is not compatible with ultra/short-throw projectors
•Minimum lens throw ratio 1.5x image width
•Ambient light must not come from the same direction as the projector
Since angular-reflective means that the projected image will reflect at the mirror-opposite angle, it is important to position
the projector so that the viewer will get the best possible image.
Step 1: Establish the general “eye level” of the viewers
Step 2: Set the appropriate projection level
Step 3: Adjust the screen height level and projection angle
Input Angle (A) = Output Angle (B) aligns with the viewer’s angle
Rev.070216-MZ www.elitescreens.com 9
Page 10
Edge trim Installation
A
C
E
Included is an ultra-thin black edge trim that provides an elegant bezel finish
Edge trim x 6 PCS
Plastic corner sleeve x4pcs
1. Place the assembled frame on a flat and clean surface. The projection screen surface should be facing up. Align the
tape with the edge of the screen, as shown in Figure 1. Once properly aligned, apply the black tape to the center of
the top and bottom of the screen material.
The black tape
Screen Material
The black tape
Figure 1
2. Without removing the adhesive tape, place all the trim pieces along the edge of screen material. Adjust the trim
pieces so that the four corners are evenly aligned. (Note: The Elite logo should be positioned on the bottom right).
Refer to Figure 2 below for a visual reference.
Front Side
Trim
strip
Back Side
Figure 2
NOTE: Make sure the bottom edge trim with the Elite Screens logo is installed on the correct side. The back of the
material should be labeled with a DOWN sticker to indicate the material is facing in the down position. The Elite
Screens logo should be installed on the DOWN side
3. After properly aligning all trim pieces, carefully remove trim piece A (see Figure 3 below). Remove the inside
backing of the tape and place the trim piece in its original position on the frame. Repeat this step for the remaining
trim pieces in the following order: B-C-D-E-F.
F
D
Figure 3 The front side of the frame with trim pieces attached
Black tape x1pcs
Rev.070216-MZ www.elitescreens.com 10
Page 11
en installed
through thefrontofthescreen
Once all corner sleeves have been snappedintoeach corneroftheframe, itisreadyto beinstalled.
120” models
Before installing the trim strip
Before installing the trim strip
four corners.
comple
After installing thetrimstrip
After installing the trimstrip
4. After the bezel trim has be
adjusting the corner sleeve
of the bezel trim.
, place a corner sleeve (O) on all
. Make sure the corner sleeve
Begin by aligning and
tely wraps the edge
Back side
Diagonal Size Note:
The Diagonal Size of the 100” &
101” comparison
120” comparison
Front side
before and after installing the edge trim strip.
Rev.070216-MZ
www.elitescreens.com
11
Page 12
Installation
Locate your desired installation location with a stud finder (recommended) and mark the drill-hole area of where the
screen is to be installed.
1. Drill a hole with the proper bit size according to the wood screws included.
2. Line up the wall brackets with the drilled holes on the installation location and screw them in using a Phillips
screwdriver.
3. Position the frame screen onto the wall brackets (F) as shown in below.
4. The design of the wall brackets allows the frame to slide over them through its sides. This is an important
feature of the installation design as it allows your screen to be properly centered.
For a local Elite Screens contact or Technical Support, please visit
www.elitescreens.com
Rev.070216-MZ www.elitescreens.com 12
Loading...
+ hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.