w/ StarBright CLR® (Ceiling Light Rejecting®) Front Projection Material
User’s Guide
Product Description:
The Aeon CLR® Series is an ultra-short throw fixed frame projection screen that uses Elite’s EDGE FREE CLR®
technology. It is designed for with Ultra-Short Throw Projectors only, for use in environments where ceiling light
cannot be entirely controlled. It includes an LED backlight kit and a bezel trim to further enhance the frame appearance.
Screen Maintenance
Dust, dirt and scratches on the projection screen surface will affect the quality and performance of the projection image.
For optimal results we advise to pay attention to the following instructions.
1) The screen surface has a horizontal structure. DO NOT wipe the screen up and down or in a circular motion. Wipe from left to right only.
2) Please clea n the dust on the screen surface with a soft br ush or microfiber cloth (rough towel or cloth may damage
the screen’s surface).
3) Gently wipe the screen with a moistened microfiber cloth with m ild soap diluted in water.
Notes:
The following precautions should be followed at all times to avoid damaging the material, which is not
covered under warranty.
Don’t touch the screen material to avoid leaving fingerprints. Use gloves when handling the material.
Don’t scratch the material, as it will leave permanent markings on the screen’s surface.
Don’t point to the screen material with a fingertip or other sharp objects to prevent damage to the material.
Don’t use acetone, benzene, alcohol and any other organic solvents to clean the screen material. Using such
chemicals will permanently damage the screen.
Assembly V ideo
Watch our assembly video on-line at
www.elitescreens.com/aeonCLR_assembly
or scan the QR code
042717DR www.elitescreens.com 1
Page 2
Hardware and Parts List
I. Rubber mallet x1 pc
J. Screw a nd anchor x 6-9 pcs
K. Black Tape x1 bag
L. Bezel trim x6 pcs
M. Corner sleeve x4 pcs
N. White gloves x2 pcs
Elbow Joint (A)
Push
Elbow Joint (A)
Please make sure all parts listed below are included before installation.
A. Elbow joint x4 pcs
B. Top/Bottom hori zontal frame
x4 pcs
C. Left/Right vertical frame x2 pcs D. Center joints x2 pcs
E. Center support bar x1-2 pcs F. Wall brackets x2-3 pcs G. M5x15 screw x24 pcs H. Screw driver x1 pc
Frame Assembly
1. Insert the center joint into one of the ½ horizontal frames and fasten it with the two M5x15 screws (H).
2. Insert the other ½ horizontal frame piece to the center joint and fasten also using two M5x15 screws.
3. Repeat steps 1 and 2 for assembling the second horizontal frame.
Push Push
Top right Frame
Center joints
Top left Frame
Horizontal frame
4. Insert the elbow joint (A) into each end of the horizontal frames (B) as shown below.
042717DR www.elitescreens.com 2
Horizontal long frame (B)
Page 3
5.Insert the two vertical short frames (C) into the elbow joint (A).
Horizontal Long frame (B)
Four corners join correctly to form a perfect
Push
push
push
Push
6. Join the remaining horizontal long frame (B) with the frame built in the previous step s as shown below.
Vertical sho rt fra me (C)
Horizontal long frame (B)
7. Make sure all four corners are properly in place to form a perfect square.
Then fasten the four angles with the M5x15 Scr ews (G).
rectangle. Use the included screwdriver (H)
to fasten the M5x15 screws (G) into each
corner by aligning the frame screw holes to
the holes in the elbow joint (A).
042717DR www.elitescreens.com 3
Page 4
Screen Material Installation
Velcro
Front side of material
Please read this important note before proceeding with the installation process of the material:
Before handling the StarBright CLR® material, put on the supplied pair of white gloves to avoid leaving
fingerprint marks, dust or hand oil on the material’s surface (Figure 1). T he StarBright CLR® material is very
delicate and should be handled with extreme care. Do not allow the material to fold or bend.Failure to fol low
instructions will result in permanent damage to the screen material, which is not covered by warranty.
1.Remove the StarBright CLR® material from the packaging tube and set it gently on a clean surface.
Tip: Caref u lly put a small flat weighted object at the edge (PVC/Velcr o e nd ) to prevent it from moving out of place.
Please keep the front of the material face down.
2. It is strongly recommended for two people to unroll the material to prevent the screen from bending or rolling
unevenly. Each person holds one end of the roll and slowly unrolls the screen in a clockwise direction (Figure 2).
3. Lay the material completely flat with the front facing down on a clean surface in a horizontal position (Figure 3).
Back side of material
Tip: Small weighted object
Figure 1
Figure 2
Figure 3
Horizontal position laid on a clean surface
4. Carefully and gently place the assembled frame on top of the screen material as shown below. Make sure to not
allow the angle edge of the frame to come in direct contact with the material to avoid puncturing or damaging it.
042717DR www.elitescreens.com 4
Screen material back facing up
Page 5
5. After all of the corners of the frame have been properly aligned (example D), attach the material on the frame in the
screen material
material to the Velcro
ultimately attach with the
other Velcro end on the
A
C
D
D
following order A→B→C→D (see instructions below for details).
B
Attach the screen materia l to the corne rs as shown b elo w.
1) Stretch the screen material in
the direction of the arrowhead.
2) Fold over and attach
strip of the frame.
6. After all four corners have been attached; please check whether the screen material wraps the frame corners. If not,
please loosen the Velcro connection and repe at the abo v e steps so the fram e is not exposed.
3) Fold over second side
and attach to frame
4) Repeat until all four sides
are done in the order A, B, C, D
Note: The black shaded part
Note:
Represents the
7. Proceed to attach the rest of the material to the frame as described in the illustrations below.
represents the Velcro on the
frame. That Velcro end will
screen material.
042717DR www.elitescreens.com 5
Page 6
Lay the Velcro end on the screen material
①②
D
The key is to attach within the middle
sections of 1 and 2. Then continue
Repeat the same steps on
remaining three sides in the
A
Grasp the middle of the screen
material and attach it to the Velcro
strip on the frame
over the Velcro end of the frame and keep it
within the edge.
Proceed in the following sequence
attaching the remaining unattached are as.
C
Screen Material Removal
Follow the steps to properly remove the screen material from the frame. This procedure will ensure prolonging the life
of the screen material.
1. Detach the Velcro from the frame.
2. Gently pull back the material to release the material from the Velcro connections on the corners
sequence A, B, C, D.
Attach in the following
sequence: a-b-c-d
B
042717DR www.elitescreens.com 6
Page 7
Pull back the screen material from
the Velcro connection along the
Support bar
M6 hex screw
edges of the frame to detach it.
Support bar installation:
1. Position the center support bar (E) in the middle of the frame and align the hole on each end of the support bar with
the M6 hex screws on the top and bottom frames. Then fasten with the M6x12 screws.
Move the
to the middle area of the frames.
Align the M6 screws
with the two holes.
042717DR www.elitescreens.com 7
Page 8
Edge trim Installation
Black tape x1pcs
TIP:
sleeves.
Included is a black edge trim that provides an elegant ultra-thin bezel finish
Edge trim x 6 PCS
Plastic corner sleeve x4pcs
1. Place the assembled frame on a flat and clean surface. The projection screen surface should be facing up.
a. As an option, Black Tape is supplied to cover any possible gaps between the pieces of the bezel trim. Align
the tape with the edge of the screen, as shown in Figure 1. Once properly aligned, apply the black tape to
the center of the top and bottom of the screen material.
2. Without removing the adhesive tape, place all the trim pieces along the edge of screen material. Adjust the trim so
that t he top and bottom trim pieces are touching and show no gaps in the center. (Note: The Elite logo should be
positioned on the bottom right). Refer to Figure 2 below for a visual reference.
NOTE: Make sure the bottom edge trim with the Elite Screens logo is installed on the correct side. The back of the
material should be labeled with a DOWN sticker to indicate the material is facing in the down position. The Elite
Screens logo should be installed on the DOWN side
3. After properly aligning all trim pieces, carefully remove trim piece A (see Figure 3 below). Remove the inside
backing of the tape and place the trim piece in its original position on the frame. Repeat this step for the remaining
trim pieces in the following order: B-C-D-E-F.
The black tape
Figure 1
Figure 2
Screen Material
White area
signifies
corner gap.
Trim
strip
Front Side
Back Side
The black tape
Align the trim starting
from the center to reduce
gapping. Any gaps left at
the corners will be
covered by the corner
042717DR www.elitescreens.com 8
Page 9
Before installing the trim strip
After installing the trim strip
A
C
E
The front side of the frame with trim pieces attached.
F
Figure 3
D
Corner gap
will be
covered by
the corner sleeve (M).
4. After the bezel trim has been installed, place a corner sleeve(M) on all four corners. Begin by aligning and
adjusting the corner sleeve through the front of the screen. Make sure the corner sleeve completely wraps the edge
of the bezel trim. This should cover any corner gaps.
White area
signifies
corner gap.
Back side
Front side
Once all corner sleeves have been snapped into each corner of the frame, it is ready to be wall in s tal la tion.
Diagonal Size Note
The Diagonal Size of the AR100H-CLR before and after installing the edge trim strip.
042717DR www.elitescreens.com 9
Page 10
Notice to Install e r:
Proper Projector Placement for StarBright CLR®
The StarBright CLR® is exclusively for table-mounted ultra-short throw projectors as illustrated in example
1 below. Overhead placement or a standard projector will make the image very dark, on account of the screen’s
absorbent layer deflecting light that is not aligned with its reflective angle.
Example 1: Proper Projector Installation
Example 2: Improper Projector Installation
Images are not up to scale and are for illustrations purposes only.
042717DR www.elitescreens.com 10
Page 11
Installation
1. Correctly distinguish the top and bottom of the screen:
Place the assembled screen on the ground. Look down on the screen, if the material is white it is in the
correct direction and ready for mounting on the wall. However, if the material is black, turn around the
screen and then install it.
Note: There are also “Top” and “Bottom” labels on the back of the screen material to help distinguish
the correct direction. Please make a note of this.
2. Preparing for installation
1) Locate your desired installation location with a stud finder (recommended) and mark the drill-hole area of where
the screen is to be installed. (The distance of the holes is between 1/3 to 2/3 the length of the horizontal frame.)
2) The installation height must be based on your projector’s throw height and the distance between your projector and
the screen, since this screen is just for Ultra-Short-Throw Projectors. Please refer to your projector’s distance
calculator for proper measurements.
3. Fixed installation
1) Drill a hole with the proper bit size according to the wood screws included.
2) Line up the wall brackets with the drilled holes on the installation location and screw them in using a Phillips
screwdriver.
3) Position the frame screen onto the wall brackets (F) as shown below.
4) The design of the wall brackets allows the frame to slide over them through its sides. This is an important feature of
the installation design as it allows your screen to be properly centered.
Frame Bracket
Wall
For a local Elite Screens contact or Technical Support, please visit
www.elitescreens.com
042717DR www.elitescreens.com 11
Loading...
+ hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.