Electro Industries/GaugeTech Shark MP200 Series, Shark MP200-S, Shark MP200-Y Quick Start Manual

V.1.03 November 5, 2018
This page intentionally left blank.
MP200TM Metering System Quickstart Guide
The Leader In Power Monitoring and Smart Grid Solutions
The Leader In Power Monitoring and Smart Grid Solutions
7.62in
193.5mm
4.36in
80.6mm
3.18in
110.6mm
0.81in
20.5mm
193.1mm
286.5mm
0.28in
0.80in
20.4mm
76.9mm
7.60in
11.28in
278.9mm centered
3.03in
7.2mm
4.8mm
10.98in
0.19in
centered
4.50in
114.3mm
0.12in
2.9mm
Mechanical Installation
Recommended Tools for MP200 Unit Installation: #2 Phillips screwdriver; 1/4-inch (0.25”) nut driver, socket, box, or open-end wrench; wire cutters.
NOTE: The MP200 unit is designed to withstand harsh environmental conditions; however it is recom­mended you install it in a dry location, free from dirt and corrosive substances.
1. Mount the unit against any firm, flat surface.
2. Use a #8 screw in each of the four slots on the flange to ensure that the MP200 unit is installed securely.
IMPORTANT!
For safety reasons, mount the MP200 unit in an enclosed and protected environment, such as in a switchgear cabinet. Connect an earth ground to the post on the side of the MP200 unit, using an AWG 12 wire. Install a switch or circuit breaker nearby; label it clearly as the MP200 unit’s disconnecting mechanism.
Doc# E166705 V.1.03 QS - 1
The Leader In Power Monitoring and Smart Grid Solutions
The Leader In Power Monitoring and Smart Grid Solutions
Electrical Installation:
I1-LO
LOAD
V2 V1
LINE
N
I1-HI
V1
I3-HI
V3
V3
I2-HI
I2-LO
V2
N
I3-LO
SERVICES: WYE, 4 WIRE.
Power Supply Connection
CT Shorting Block EI# SB-6CT
Only one 3 phase circuit is shown. Duplicate for additional circuits.
Earth Ground
Earth Ground
FUSES 3 x 0.1A
FUSE 3A
CONNECTION TYPE: Direct Voltage, CTs
3
2
1
N
L(+) N(-)
WARNINGS! For Electrical Installation:
All Primary and Secondary circuits can, at times, produce lethal voltages and currents.
Avoid contact with any current-carrying surfaces.
The current inputs are only to be connected to external current transfomers (CTs).
MP200TM Metering System Quickstart Guide
Service: Three Phase, 4-Wire WYE Service Direct Voltage and 3 CT Connection for Metering
8 Three Phase Loads: MP200-Y
IMPORTANT! All CTs must have one side grounded to reduce shock hazard.
EIG highly recommends using shorting blocks like the EI SB-6TC so that the meter can be removed from service while the CT is energized. You can order the EI SB-6TC at www.electroind.com.
Doc# E166705 V.1.03 QS - 2