This manual contains important instructions for the Eguana Commercial AC Battery™ Energy
Storage System. The Eguana Commercial AC Battery™ components described by this manual
are intended to be used as part of an Energy Storage system and installed per all local building
codes and regulations in addition to the National Electrical Code, ANSI/NFPA 70 (for US) and
Canadian Electrical Code (for Canada).
CAUTION! Hazardous Voltages! This inverter contains hazardous voltage and energy that
may be lethal. It may only be installed by qualified personnel who have read this manual and are familiar with its operation and hazards. The following safety procedures should be followed:
CAUTION! Equipment powered by two sources of power. Disconnect all power sources and
wait 5 minutes before servicing.
1 Only connect the PCS cabinet to a compatible electrical service as defined in the model
specifications. The PCS must be connected to a dedicated branch circuit in the main
electrical panel.
2 An external disconnect switch shall be provided in the end installation by others for the AC
Grid output circuit.
CAUTION! This equipment contains high energy lithium batteries. Qualified and trained
personnel should wear protective clothing and equipment when working inside the battery cabinet
and/or with battery modules.
3 The PCS is compatible with the LG Chem battery model EM048126P3S7 only.
CAUTION! The batteries provided with this system must be charged only by the PCS
included as part of the energy storage system. Do not attempt to charge batteries with any
other charger device or connect any devices directly to the DC battery bus.
4 Ensure proper electrical grounding in accordance with code requirements.
5 Ensure proper airflow path for active cooling.
6 Never operate system in a manner not described by this manual.
7 Only qualified personnel should service this product.
8 Ensure all covers are securely fastened after installation is complete.
9 This product must be stored indoors in an environmentally conditioned location prior to
installation, protected from rain and exposure to any hazardous chemicals.
10 Do not attempt to operate this product if there is any physical evidence of damage to any of
the cabinets or internal components.
CAUTION! This equipment is heavy. Mechanical lifts are recommended for safe installation.
1.1IN CASE OF EMERGENCY ............................................................................................................................................... 1
2.3INITIAL INSPECTION OF MATERIAL LIST .................................................................................................................. 3
2.4INSTALLATION MATERIALS NOT INCLUDED .............................................................................................................. 3
12.1UL1741SAGRID SUPPORT UTILITY INTERACTIVE INVERTER SPECIFICATIONS.................................................. 17
Table 3: UL1741 SA grid support functions. ............................................................................................................................ 17
Table 4: Low and high voltage ride through settings. .............................................................................................................. 17
Table 5: Low and high frequency ride through settings. .......................................................................................................... 18
12.2 Thermal Performance of PCS and Battery Modules ................................................................................................... 22
APPENDIX A: ACB-15 SERIES ELECTRICAL BLOCK DIAGRAMS .............................................................................................. 24
WARNING! A dangerous voltage or other
condition exists. Use extreme caution when
performing these tasks.
Meter measurement required.
CAUTION! This information is critical to the
safe installation and or operation of the inverter.
Follow these instructions closely.
Torque rating critical to operation.
NOTE: This statement is important. Follow
instructions closely.
Login to the remote monitoring system
for operating status
EMS
This manual contains important instructions for the Eguana Commercial AC Battery™ Energy Storage System. The
Eguana Commercial AC Battery™ components described by this manual are intended to be used as part of an Energy
Storage system and installed per all local building codes and regulations in addition to the National Electrical Code,
ANSI/NFPA 70 (for US) and Canadian Electrical Code (for Canada).
Throughout this manual, the following symbols will be used to highlight important information and procedures:
1.1 In case of emergency
In all cases:
If safe to do so, switch off the AC breakers (external to the system) .
Contact the fire department or other required emergency response team.
Evacuate the area, and if applicable, follow your emergency evacuation plan if others are in proximity to the
installed location.
In case of fire:
When safe, use a fire extinguisher suitable for use; including A, B, and C dry chemical fire extinguishers or
carbon dioxide extinguishers.
In case of flooding:
Stay out of water if any part of the system or wiring is submerged.
Do not attempt to operate batteries that have been submerged in water even after they have been dried.
In case of unusual noise, smell or smoke:
If safe to do so, ventilate the area.
1.2 Battery module safety precautions
This product is integrated with LG Chem EM048126P3S7 series battery modules. Refer to the LG Chem product
manual LG Chem P3S series 48V Standalone Battery Module Installation Manual, for complete safety instructions
regarding handling of battery modules.
1
1.3 General safety precautions
Risks of Fire
Do not expose the system to temperatures exceeding 60 degrees Celsius.
Avoid installation in direct sunlight.
Do not store objects on top of the cabinet.
Do not obstruct the airflow paths of the HVAC cooling system.
Do not obstruct the intake or exhaust of the forced airflow system.
Do not store combustible objects and corrosive chemicals directly adjacent to the system.
Risks of Shock
WARNING! Hazardous Voltages. The Inverter contains hazardous voltage and energy that may be lethal.
It may only be installed by qualified personnel who have read this manual and are familiar with its operation and
hazards.
Only connect the PCS cabinet to a compatible electrical service as defined in the model specifications. The PCS
must be connected to a dedicated branch circuit in the main electrical panel.
Ensure proper electrical grounding in accordance with code requirements.
CAUTION! Both AC and DC voltage sources are terminated inside this equipment. Each circuit must be
individually disconnected before servicing
Risks of Damage
The PCS is compatible with the LG Chem battery model EM048126P3S7 only. Do not attempt to connect any
other battery to the system.
Do not connect any other loads directly to the battery power bus.
Do not drop, tip, or puncture the cabinet during transport and installation. Visible damage to the cabinet
and/or internal components should be reported to the manufacturer immediately.
Do not store this system for periods longer than six months without a battery maintenance charge. This may
result in permanent damage to the batteries.
Important! Installation, service, and operating personnel must read this document in its entirety, and observe all
safety and installation procedures as described in this manual. Never operate system in a manner not described by
this manual.
Only qualified personnel should service this product.
Ensure all covers are securely fastened after installation is complete.
Personal Protective Equipment (PPE) in compliance with local work place safety standards must be worn when
working inside the cabinet.
1.4 Environmental Protection
Do not dispose of the system or any of the components within the cabinet. Batteries, electronics, cables, and metal
parts are recyclable. Consult your municipal waste management authority to determine required methods of
component recycling.
2
2 Introduction
Term
Definition
Term
Definition
AC
Alternating Current
NC
Normally Closed
ARC
Auto Recovery Circuit
NEC
National Electrical Code
CPU
Central Processing Unit
NO
Normally Open
DC
Direct Current
PCS
Power Control System (Inverter)
EMS
Energy Management System
PE
Protective Earth
ESD
Electrostatic Discharge
PV
Photo-Voltaic
ESS
Energy Storage System
RF
Radio Frequency
GND
Ground
SOC
State Of Charge (Battery)
LED
Light Emitting Diode
SOH
State of Health (Battery)
2.1 About this Manual – Target Audience
This manual is intended to be used by qualified service and installation personnel for the purposes of product
installation. This manual contains instructions for the installation and start up sequence of the Eguana Commercial AC
Battery energy storage system. This product is permanently wired to the electrical service, and must be installed by a
licensed electrician only.
This system requires an externally supplied energy management system to operate and manage the battery system.
The energy management system must be qualified and approved for use by Eguana Technologies to be compliant with
the manufacturer warranty. Consult the manufacturer for a list of approved energy management systems prior to
installation of this product.
2.2 Glossary
2.3 Initial Inspection of Material List
In addition to the battery system, the following additional components are supplied with your Eguana Commercial AC
Battery™ Energy Storage system. Each component should be inspected visually for any damage that may have been
caused by shipment. If damage is present, please contact your local distributor.
The following materials should be readily available to install the system:
CAT 5e communication cable of appropriate length and gauge (non-integrated EMS)
RJ-45 connectors (EMS communication)
Mounting hardware for pad mounting of cabinet – up to ½” hardware supported.
2.5 Special Tools
In addition to standard tools required for cabinet mounting, the following tools should be readily available to
interconnect the battery and PCS cabinets.
RJ-45 crimp tool (EMS to PCS communication cable).
3
3 Installation Site Preparation
Figure 1: Mounting installation plan – minimum clearances required for installation and service access to the battery system.
1500 lbs
Clearance determined by boom lift
24"
6"
Front View
Canopy
Concrete pad
24"
PCS
Cabinet
Battery
Cabinet
Plinth
36"
Concrete pad
36"
Wiring port
Side (Right) View
31.9"
8"
53.75"
4"
47.6"
33.75"
Before installing the system, read all instructions and warnings in this manual.
CAUTION! All electrical and civil installation work should be performed in accordance with local building and
electrical codes.
3.1 Installation Planning
CAUTION! The cabinet weighs approximately 1500 lbs. Handle with care. All six lift points must be used to lift
the cabinet into its fixed position, and equal tension at all six lift points is required to prevent damage to the
interconnected cabinets. Ensure equipment and lift straps used are rated to safely install the system.
CAUTION! Avoid installation in direct sunlight. Battery performance is dependent upon operating ambient
temperature. Radiant heat absorbed in direct sunlight will greatly reduce the performance of the batteries and will
prematurely cause degradation of the display indicator panel on the front of the cabinet. The HVAC option will be
required where direct sunlight installation is the only option. Refer to Section 12 for more details.
3.2 Cabinet Plinth Pad-mount Dimensions
The following diagram illustrates the pad-mount footprint dimensions for the cabinet plinth, with relative position of the
field wiring ports near the front-right corner of the cabinet plinth. Anchoring of the cabinet is supported by four
mounting holes rated up to ½” (13 mm) anchor bolts.
CAUTION! Concrete pad or floor must be level to ensure proper weight distribution of rack-mount components
within the cabinet. All civil work should be performed in accordance with local building codes.
4
Figure 2: Cabinet Plinth Pad-mount dimensions.
front
3.3 Cabinet lift method
The following diagram illustrates the lift points. The two cabinets are interconnected at the base plinth and the top
center lift hardware. Note that the product is shipped without the canopy installed, such that it is ready for direct lift off
of the shipping pallet.
CAUTION! The cabinet weighs approximately 1500 lbs. Handle with care. All six lift points must be used to lift
the cabinet into its fixed position, and equal tension at all six lift points is required to prevent damage to the
interconnected cabinets. Ensure equipment and lift straps used are rated to safely install the system.
Figure 3: Lift points on the battery system.
5
3.4 SLD - AC Coupled PV System with Back-up Power Operation
Eguana ACB15 ESS
Grid
BMS
PV Inverter
1
Main
Electrical
Panel
Sub-Panel
2
Critical loads
Loads
EMS
Loads
CAT-5
3
Grid
Load
ATS or Mechanical
Interlock
4
Home
network
The following block diagram is representative of an AC coupled solar plus storage system with backup power operation
(480V model only).
Important: The above diagram is a single line representation of a utility interactive battery system with AC coupled
PV to a critical load panel, based on the electrical ratings of the Eguana AC battery. Please consult your National and
local electrical codes for full compliance in an actual installation.
1 – PV Inverter should not exceed rating of base load plus battery inverter rating for optimal self-consumption and/or
where PV export to grid is not permitted.
2 – Sub-panel is grounded directly from the main panel.
3 – Refer to EMS/gateway specs for communication cabling requirements.
4 – An Automatic Transfer Relay (ATS) or Mechanical interlock is recommended in case of system service. This will
power critical loads directly from the grid.
Figure 4: Single Line Diagram: Typical AC coupled PV system.
6
Loading...
+ 21 hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.