2 INSTALLATION EG4xxx Owner’s Manual
2.2 Materials required for installation
• Per phase: Use of proper smallest available breakers or rated fuse taps for
the install per local NEC rules. Usually 15A circuit breaker or single multipole breaker depending on phases used.
• Black, red, and white stranded AWG 12 wire; length depending on installation location. Thermal resistance to at least 75◦C. Blue wire is needed in
addition for 3-phase installations. Use wire that has insulation rating greater
than the max voltage inside the panel. Note: wire colors may vary based on
country and electrical service.
• Electrical tape
• Conduit and couplings as needed
• Mounting and wire organization hardware as needed
• If installed outside, appropriately rated enclosure (e.g. IPX4/NEMA4)
2.3 Tools required for installation
• #0 slotted screw driver (needed if length of CT-wires needs to be adjusted)
• Circuit-breaker finder (if using HomePlug power-line communication)
• Voltage meter
Additionally, for device commissioning and installation verification:
• Clamp-on AC current meter
• Laptop with Ethernet cable
2.4 Nomenclature and Symbols
In the US, residences typically receive power through split-phase power distribution which is provided through two hot legs, a neutral, and a protective ground.
Most commercial and industrial buildings receive power through 3-phase power
distribution provided through 3 hot phases, a neutral and protective ground.
3 July 5, 2017