E. Emerson Tool 3ADTS, 3ATS, 3NTS, 3NDTS User Manual

Installation Manual ASCO 3ATS, 3ADTS, 3NTS, 3NDTS
E
Installation Manual
G-design 1600-3000 A Transfer Switches
DANGER
!
DANGER is used in this manual to warn of a hazard situation which, if not avoided, will result in death or serious injury.
WARNING
!
WARNING is used in this manual to warn of a hazardous situation which, if not avoided, could result death or serious injury.
CAUTION
!
CAUTION is used in this manual to warn of a hazardous situation which, if not avoided, could result in minor or moderate injury.
Refer to the outline and wiring drawings provided with the 3ATS, 3NTS, 3ADTS, or 3NDTS for all installation and connection details and accessories.
Refer to User’s Guide 381333-400 for the Goup G Controller status display messages, time delays, pickup and dropout settings, and adjustments.
Rating Label
Each transfer switch contains a rating label to define the loads and fault circuit withstand/closing ratings. Refer to the label on the transfer switch for specific values.
WARNING
!
Do not exceed the values on the rating label. Exceeding the rating can cause person injury or serious equipment damage.
An experienced licensed electrician must install the transfer switch.
Installation
These transfer switches are factory wired and tested. Installation requires mounting, connecting service cables, and connecting engine start and auxiliary control circuits (if required.).
3ATS, 3ADTS, 3NTS, 3NDTS
Table of Contents
INSTALLATION
Mounting .......................................................... 1
Power Connections .........................................2
Engine Starting Contacts.................................2
FUNCTIONAL TEST
1- Manual Operation........................................3
2- Voltage Checks ...........................................4
3- Electrical Operation .....................................6
TESTING & SERVICE
Transfer Test ...................................................6
Preventive Maintenance ..................................6
Manual Load Transfer .....................................6
TROUBLESHOOTING ....................................7
INDEX..............................................................8
Supporting Foundation
The supporting foundation for the enclosure must be level and straight. Refer to the applicable enclosure outline drawing included with the transfer switch for all mounting details including door opening space.
If bottom cable entry is used, the foundation must be prepared so that the conduit stubs are located correctly. Refer to the enclosure outline drawing for specified area and location. Provide cable bending space and 1 inch minimum clearance to live metal parts. When a concrete floor is poured, use interlocking conduit spacer caps or a wood or metal template to maintain proper conduit alignment.
Mounting
Refer to the outline and mounting diagram and mount the transfer switch according to details and instructions shown on the diagram. Mount it vertically to a rigid supporting structure. Level all mounting points by using flat washers behind the holes to avoid distortion of the transfer switch.
NOTIC
Protect the transfer switch from construction grit and metal chips to prevent malfunction or shortened life of the transfer switch.
381333-406
381333-406 ASCO Power Technologies Page 1
ASCO 3ATS, 3ADTS, 3NTS, 3NDTS Installation Manual
Line Connections
Refer to the wiring diagram provided with the transfer switch. All wiring must be made in accordance with the National Electrical Code and local codes.
DANGER
!
De-energize the conductors before making any line or auxiliary circuit connections. Be sure that the Normal and Emergency line connections are in proper phase rotation. Place the engine generator starting control in the OFF position. Make sure engine generator is not in operation.
Testing Power Conductors
Do not connect the power conductors to the transfer switch until they are tested. Installing power cables in conduit, cable troughs, and ceiling-suspended hangers often requires considerable force. The pulling of cables can damage insulation and stretch or break the conductor’s strands. For this reason, after the cables are pulled into position, and before they are connected, they should be tested to verify that they are not defective or have been damaged during installation.
Connecting Power Cables
After the power cables have been tested, connect them to the appropriate terminal lugs on the transfer switch as shown on the wiring diagram provided with the transfer switch. Make sure that the lugs provided are suitable for use with the cables being installed. Standard terminal lugs are solderless screw type and will accept the wire sizes listed on the drawings provided with the transfer switch. Be careful when stripping insulation from the cables, avoid nicking or ringing the conductor. Remove surface oxides from cables by cleaning with a wire brush. When aluminum cable is used, apply joint compound to conductors. Tighten cable lugs to the torque specified on rating label.
Harnesses
The transfer switch is connected to the left side of the controller by a plug-in harness (two plugs).
Auxiliary Circuits
Connect auxiliary circuit wires to appropriate terminals on the transfer switch as shown on the wiring diagram.
Controller Ground
A grounding wire must be connected to the controller’s lower left mounting stud. Because the controller is mounted on the enclosure door, a conductive strap must be used between the enclosure and the door. This connection provides proper grounding which does not rely upon the door hinges.
Engine Starting Contacts
The engine control contact connections (if used) are located on the transfer switch for 3ATS & 3NTS or in the upper right side of the enclosure for 3ADTS & 3NDTS. Connect signal wires to appropriate terminals as specified in Table A and shown in Figure 1.
Table A. Engine Start Connections.
When normal
source fails
contact closes TB1 and TB2
contact opens TB1 and TB3
TB
Figure 1. Engine start and auxiliary circuit terminal block.
Emergency contacts
window indicators
OPEN or CLOSED
Normal contacts
Figure 2. Main contact position indicators on right side.
Terminals on
transfer switch
Page 2 ASCO Power Technologies 381333-406
Installation Manual ASCO 3ATS, 3ADTS, 3NTS, 3NDTS
Functional Test
The functional test consists of three checks: manual operation, voltage checks, and electrical operation.
Do these checks in the order presented to avoid damaging the transfer switch.
A maintenance handle is provided on the transfer switch for maintenance purposes only. Manual operation of the transfer switch should be checked before it is energized (operated electrically).
Do not manually operate the transfer switch until both power sources are disconnected: open both circuit breakers.
1. After deenergizing both power sources, open the enclosure
2. Install the handle into the hole in the molded hub. Move
3. 3ADTS and 3NTS have two contact shaft hubs. See
4. Return the transfer switch to the Normal position.
Note: If Normal and Emergency connections are reversed this operation is also reversed.
NOTICE
1 – Manual Operation
WARNING
!
door. Locate and remove the maintenance handle from the clip on the left side of the transfer switch. See Figures 3, 4, and 5. See Figure 2 for the contact position indicators.
the handle up or down as shown to manually operate the transfer switch. It should operate smoothly without any binding. If it does not, check for shipping damage or construction debris.
Figure 5.
maintenance
Figure 3. Maintenance handle on 3ATS & 3NTS.
Counterclockwise DOWN closes the Emergency source contacts (upper) and opens the Normal source contacts (lower)
Clockwise DOWN closes the Normal source contacts (lower) and opens the Emergency source contacts (upper)
Figure 4. Maintenance handle operation on 3ATS &
3NTS.
maintenance handle
insert handle into hole in hub
slide hub onto shaft and insert the pin
Counterclockwise DOWN OPENS the contacts
shaft to open
Pull out Emergency source contacts (upper) Push in source contacts (lower)
shaft to open Normal
Clockwise DOWN CLOSES the contacts Pull out
shaft to close Emergency source contacts (upper) Push in
shaft to close Normal source contacts (lower)
Figure 5. Maintenance handle on 3ADTS & 3NDTS.
381333-406 ASCO Power Technologies Page 3