Edwards Signaling 95 User Manual

Cheshire, CT 06410 203-699-3300 (Ph) 203-699-3365 (Cust. Serv. Fax) 203-699-3078 (Tech. Serv. Fax)
Installation Instructions for Catalog Series 90, 92 and 95
AdaptaBeacon
®
Signals
90 Series 92-N5 Series 92-R5 and 92-S1
Description
The catalog series 90, 92 (120 and 240V AC Models only) and 95 AdaptaBeacon signals are UL and cUL listed, general purpose visual and visual/audible signaling appliances. The 90 and 92 series signals are strobe lights; the 95 signals are strobe lights with a single pulsing horn.
The 92 series single flash beacons are available in 120VAC, 240V AC and 250V DC models. The 240V AC and 250V DC versions have a larger lens assembly than the 120V version. The 92(*)-S1 beacons are supplied with 3 ft (.9 m) flying leads.
The 90, 92 and 95 series are suitable for indoor or outdoor (weath­erproof) installation and utilize a standard base that allows direct surface mounting, mounting on a 4" (102 mm) octagon box, or mounting on 1/2" (13 mm) NPT conduit. When installing in­doors, the signals may be mounted in any position. For outdoor installation, the signals must be mounted on conduit with their lens or dome facing directly up.
Electrical Specifications
Catalog Rated Current Number Voltage
90(*)-N5 120V 50/60 Hz 0.10 Amp 92(*)-N5 120V 50/60 Hz 0.10 Amp 92(*)-R5 240V 50/60 Hz 0.05 Amp 92(*)-S1 250V DC 0.10 Amp 95(*)-N5 120V 50/60 Hz 0.10 Amp
*The letter (A - amber, B - blue, C - clear, G - green, M ­magenta or R - red) in this position signifies the color the supplied lens.
95 Series
Series
Installation
WARNINGS
To prevent electrical shock, ensure that power is disconnected before installing the signal.
To prevent leakage and a potential electrical hazard, use care when disassembling the signal to prevent tearing of the weatherproof gaskets. If a component resists removal due to adhesion to a gasket, separate the components by prying them apart with a thin blade screwdriver.
90, 92, and 95 Series
1. Remove the base from the signal using one of the following
do not
applicable procedures.
a. 90 Series: See Figure 1. Remove the screw in the clamp
ring, remove the ring and lift the dome off the signal. Loosen the three screws in the base of the lens, turn the lens clockwise and lift it straight up and off of the strobe tube support plate, being careful not to damage the strobe tube. Remove the two screws that are partially set into the raised area of the strobe tube support plate. Then, grasp the socket (on the strobe tube support plate) and carefully lift the support plate off of the signal base.
Pull the wires leads out of the conduit entrance hole in the base. Proceed to step 2.
b. 92 and 95 Series: See Figures 2 and 3. Remove the screw
in the clamp ring and remove the ring.
force apart by hand; carefully
For the 92-N5 and 95 series, lift the lens/lamp assembly off of the base and pull the wire leads out of the conduit entrance hole in the base.
For the 92-R5 and 92-S1 series, lift the lens off of the signal base, remove the strobe tube support plate and pull the wire leads out of the conduit entrance hole in the
P-047550-0898 ISSUE 9 © 2003
base. Exercise care so as to not tear the gaskets that are permanently attached to the lens and signal base.
Proceed to step 2.
2. For indoor installation, the signal may be direct surface mounted, mounted on a 4" (102 mm) octagon box, or mounted on 1/2" (13 mm) NPT conduit. For outdoor (weatherproof)
Figure 2. Installing the 92-N5 and 95 Series Signals
(92-N5 Shown)
Figure 1. Installing the 90 Series Signals
installation, the signal must be conduit mounted. Install the signal base using one of the following applicable mounting procedures.
Direct Surface Mounting (Indoor Only)
a. Remove the two-knockouts for mounting screws from
the bottom of the signal base.
b. Route the field wiring from the power source through the
conduit entrance hole in the base.
c. Fasten the base to the surface by installing two #10 wood
screws (not supplied) or other suitable hardware through
Clamp ring
Lens/strobe assembly
Strobe tube support plate
Connectors (not supplied)
Gasket
Signal base
DC Field Wiring
One of two
knock-outs for
direct surface
mounting
1/2" (13 mm) NPT conduit (not supplied)
Figure 3. Installing the 92-R5 and 92-S1 Series Signals
(92-S1 Model Shown)
the knock-out holes in the base. Proceed to step 3 for wiring connections.
Mounting on a 4" (102 mm) Octagon Box (Indoor Only)
a. Remove the two knock-outs for mounting screws from
the bottom of the signal base.
b. Route the field wiring from the power source through
the conduit entrance hole in the base.
c. Fasten the base to the octagon box (not supplied) by
installing the screws supplied with the box through the
P-047550-0898 ISSUE 9
Loading...
+ 2 hidden pages