Edwards Signaling 53D-GW AdaptaBeacon Installation Guide

Installation and Maintenance Instructions for the
®
Catalog 53D-GW AdaptaBeacon
Signal
DescriptionDescription
Description
DescriptionDescription
The catalog number 53D-GW AdaptaBeacon signal is an in-rush current limited, DC-operated, rotating light. The signal may be either conduit mounted or direct surface mounted and is suitable for indoor installation. A hard­ware kit is included with the signal for direct mounting applications.
Specifications
Catalog Dome Lamp Number Voltage Current Replacement Replacement
53DA-GW 24 - 28V DC 1.0A 52-LA Cat. No. 1638
53DB-GW 24 - 28V DC 1.0A 52-LB Cat. No. 1638 53DC-GW 24 - 28V DC 1.0A 52-LC Cat. No. 1638
53DG-GW 24 - 28V DC 1.0A 52-LG Cat. No. 1638
53DM-GW 24 - 28V DC 1.0A 52-LM Cat. No. 1638
53DR-GW 24 - 28V DC 1.0A 52-LR Cat. No. 1638
InstallationInstallation
Installation
InstallationInstallation
CAUTION
Ensure that power is disconnected before installing the signal.
d. Route the wiring from the required power source
for the signal (refer to the signal's label for the voltage rating) through the center holes in the mounting surface, gasket and base.
e. Align the holes in the gasket with the holes in the
base. Insert the two screws with lockwashers provided in the hardware kit through the mounting holes inside the base and align the screws with the rubber expansion plugs as shown in Figure 2. Press the base firmly against the mounting surface and tighten the screws.
3. Using wire nuts (not supplied), connect one of the signal's red wire leads to the incoming positive (+) power source lead and the other to the outgoing positive (+) power source for the next unit or an end­of-line resistor. Connect one of the signals' white wire leads to the incoming negative (-) power source lead and the other to the outgoing negative (-) power source for the next unit or an end-of-line resistor.
NOTE: Wire run must be broken at each unit for
MaintenanceMaintenance
Maintenance
MaintenanceMaintenance
electrical supervision.
1. Remove the screw in the clamp ring, remove the ring and lift off the dome (Figure 1).
2. Install the base using one of the following applicable procedures.
Conduit Mounting
a. Route the wiring from the required power source
for the signal (refer to the signal's label for voltage rating) through a 1/2" NPT conduit (not supplied) and through the conduit entrance hole in the base.
b. Install the base on the conduit.
Direct Surface Mounting
a. Remove the two knockouts for the mounting
screws from the bottom of the base. See Figure 1 for the location of the knockouts.
b. Place the gasket provided in the hardware kit on
the mounting surface and mark the center of the three holes in the gasket on the surface. Remove the gasket and drill a 3/8" hole at each of the marked positions.
c. Install the two rubber expansion plugs provided
in the hardware kit into the two outer holes in the mounting surface as indicated in Figure 2.
CAUTION
Always disconnect power before disassembling the signal.
Lamp Replacement
1. Replace the lamp as follows (Refer to Specifications for the required lamp.):
a. Disconnect power.
b. Remove the screw in the clamp ring and remove
the ring.
c. Lift the dome off the signal.
d. Replace the lamp.
CAUTION
Do NOT use abrasive materials or cleaners to clean the dome.
Cleaning
The dome should be periodically cleaned to maintain light visibility. The dome may be cleaned with a soft cloth or sponge using a mild detergent. Dry the dome thoroughly before replacing.
P/N 3100633 ISSUE 2 © 2004
Figure 1. Catalog 53D-GW Rotating Light
Figure 2. Direct Surface Mounting of Signal
P/N 3100633 ISSUE 2
Loading...