Edwards 100 Ton Deluxe Ironworker, 40 Ton IronWorker Installation Manual

Page 1
Installation Manual
Original Instructions - IW100DX01
Page 2
1
Operator and Supervisor Information
This is one of four manuals supplied with your machine.
• Installation Manual
• Safety Instructions Manual
• Maintenance Manual
READ ALL MANUALS BEFORE OPERATING MACHINERY. Operating
machinery before reading and understanding the contents of all four manuals greatly increases the risk of injury.
Each of the four machine manuals describe ‘best practices’ in handling, installing, operating and maintaining your machine. The contents of each manual is subject to change without notice due to improvements in the machinery or changes in National or International standards.
All rights reserved. Reproduction of this manual in any form, in whole or in part, is not permitted without the written consent of Edwards Manufacturing Company.
Keep all manuals close to the machine to allow for easy reference when necessary.
Provide operators with sufcient training and education in the basic functions of the machine prior to machine operation.
Do not allow for operation of the machine by unqualied personnel. Edwards Manufacturing Company is not liable for accidents arising from unskilled, untrained operation.
Do not modify or change the machine without written authorization from Edwards Manufacturing Company. Unauthorized modication to a machine may result in serious operator injury, machine damage and will void your machine warranty.
Never leave a powered machine unattended. Turn machinery OFF before walking away.
This machine is manufactured for use by able bodied and able minded operators only. Never operate machinery when tired or under the inu­ence of drugs or alcohol.
Do not resell, relocate or export to a destination other than to the original point of sale. Edwards has designed this machine to meet the standards of the original receiving country and is not liable for meeting any governing body or performance standards beyond those of the original receiving country.
Signal Word Definition
Indicates a hazardous situation that, if not avoided, will result in death or serious injury.
Indicates a hazardous situation that, if not avoided, could result in death or serious injury.
Indicates a hazardous situation that, if not avoided, could result in mild or moderate injury.
Indicates information considered important, but not hazard related.
Signal Word Panel on Machine
Critical machine safety information is identied on signal word labels. Labels are attached adjacent to the potentially hazardous locations of the machine. Reference the Safety Instruction Manual for additional informa­tion regarding the potentially hazardous condition identied on the label.
Review ALL labels on the machinery, reference the operational precautions and safe operations sections within this manual before any operation activity is initiated.
Failure to read and understand the signal word labels afxed to the machinery may result in operator death or injury.
1 General
Operator and Supervisor Information
Signal Word Denition
Signal Word Panel
2 Installation Requirements
Environmental Requirements at Work Station
Electrical Requirements at Work Station
Electrical Performance Specication
3 Installing the Ironworker Receiving the Ironworker
Unpacking/Moving the Ironworker
Anchoring the Ironworker
Electrical Connection of the Ironworker
Installing the Ironworker
Starting Box Wiring
Powering Up the Ironworker
Installation Manual Table of Contents
Page 3
2 3
This manual provides installation information for the following Edwards Ironworkers:
25 Ton 40 Ton 50 Ton
55 Ton 60 Ton 65 Ton
75 Ton 100 Ton 100 Ton DX
120 Ton Elite 110 Elite 110/65 D.O.
Environmental Requirements at Work Station
The work station environment for your Edwards Ironworker must meet the following minimum requirements:
• Floor area: Assure that the machinery work area provides
for a stable, adequately sized and load rated oor area for material movement to and from the machinery work stations.
• Shelter: Edwards Ironworkers are designed for indoor use
only. Protect your Ironworking machinery from water, salts and corrosive elements.
• Lighting: 500LUX (50 footcandles) minimum.
• Operating Temperature: This equipment will operate
correctly in its intended ambient, at a minimum between +5° C and +40°C.
• Relative Humidity: This equipment will operate correctly
within an environment at 50% RH, +40°C. Higher RH may be allowed at lower temperatures. Measures shall be taken by the Purchaser to avoid the harmful effects of occasional condensation.
• Altitude: This equipment will operate correctly up to 1000m
above mean sea level.
• Transportation and Storage: This equipment will withstand,
or has been protected against, transportation and storage temperatures of -25°C to +55°C and for short periods up to +70°C. It has been packaged to prevent damage from the effects of normal humidity, vibration and shock.
Electrical Requirements at Work Station
Locate your Ironworker directly adjacent to your power supply. Conrm that power supply is not connected in series with other machinery. Pro­vide dedicated electrical socket and circuit breaker for each Ironworker installed. Edwards Ironworkers are protected from voltage variations provided the variation does not exceed +/- 10% machine rating.
Installation Requirements
Receiving the Ironworker
Edwards Ironworking machinery is fully assembled and is shipped ei­ther by palletized custom wooden crate or by shrink–wrapped wooden pallet for ease of transport and receiving.
Inspect the packaging for damage and follow shipping/receiving instruc­tions as listed on the packaging prior to receiving the Ironworker into your facility.
When receiving your Ironworker, be prepared to safely move your ma­chinery with a fork-lift rated for the following equipment weights:
Minimum Machinery Weights
25 Ton 453.6 kg / 1000 lb
40 Ton 861.8 kg / 1900 lb
50 Ton 916.3 kg / 2020 lb
55 Ton 1124.9 kg / 2480 lb
60 Ton 1156.7 kg / 2550 lb
65 Ton 2154.6 kg / 4750 lb
75 Ton 1859.7 kg / 4100 lb
100 Ton 2109.2 kg / 4650 lb
100 Ton DX 2349.6 kg / 5180 lb
120 Ton 2494.8 kg / 5500 lb
ELITE 110 2440.3 kg / 5380 lb
ELITE 110/65 3891.8 kg / 8580 lb
Utilize best practices for fork-lift operation. Handle material as close to the drive surface as possible with the widest spread and deepest pen­etration of forks effective to service the pallet. Forks should be adjusted and locked into the safety detent closest to the maximum available fork spread.
Unpacking/Moving the Ironworker
Your Edwards Ironworker includes surface and remotely mounted electrical cabling and hydraulic lines. Exercise caution when removing the factory supplied packaging. Do not cut electrical wires or hydraulic hoses.
1. Unbolt/unpack Ironworker from its pallet using a 3/4” (19.05mm) socket. Wear appropriate personal protective equipment.
2. Lift Edwards machinery using the designated fork lift locations and appropriately rated lifting equipment.
3. Move the Ironworker to the prepared workstation.
Anchoring Ironworker
Anchor the base of the Ironworker to the workstation oor using four 1/2” (12.7mm) wedge anchor bolts. Anchorage points are the front and rear of the fork-lift tubes. Secure the machinery with lock-nuts.
In the event the machinery needs to be relocated, reverse procedure.
Electrical Connection
Conrm with a certied electrician that the electrical supply to the terminal location powering your Ironworker meet the operating speci­cations (page 2) of the machine prior to electrical connection.
Conrm your electrical supply with the electrical specications of the machine or accessory listed (page 2), and located on the Ironworker starter box. It is critical that a qualied electrician install your
machinery as your Warranty protection does not cover incorrect wiring of electrical components at your site.
Prior to connecting your machine to the dedicated, protected power supply, match work station wiring to the power supply cable (Owner supplied) and the starter-box/motor specications on the machinery. Install connections appropriately. Check for stability of connections.
If wiring through a plug/socket connection at the work station, match work station wiring to the socket (Owner supplied), plug (Owner supplied) and the power supply cable (Owner supplied) to the starter-box / motor specications on the machinery. Install connec­tions appropriately. Check for stability of connections.
Wire according to the electrical diagrams located within the control box.
Installing the Ironworker
Electrical Performance Specication
Machine Motor # Type Brand 60Hz/V FLA 50Hz/V FLA
25 Ton 116676 1Hp 1~ Leeson 60 Hz 115/208-230 12/6 50 Hz 110/220 13/6
40, 50, 55, 60 Ton, 132089 5Hp 1~ Leeson 60 Hz 230 19 50 Hz 208-220 23-22 Porta-Power 132077 5Hp 3~ Leeson 60 Hz 208-230/460 14/7 50 Hz 190/380 16/8 CEM3615T-5 5Hp 3~ Baldor 60 Hz 575 5
65, 75, 100 Ton, 132089 5Hp 1~ Leeson 60 Hz 230 19 50 Hz 208-220 23-22 Elite 110, 140809 7.5Hp 3~ Leeson 60 Hz 208-230/460 22-21/10 50 Hz 190/380 24/12 Elite 110/65 D.O. CEM3710T-5 7.5Hp 3~ Baldor 60 Hz 575 8 141140 7.5Hp 1~ Leeson 60 Hz 230 36
100DX, 120 Ton CEM3714T 10Hp 3~ Baldor 60 Hz 208-230/460 25-24/12 EM3714T-5 10Hp 3~ Baldor 60 Hz 575 10 CEM3714T-50 10Hp 3~ Baldor 50 Hz 220/380/440 28/16/14 CL3712T 10Hp 1~ Baldor 60 Hz 208-230 38
Page 4
4
Starting Box Wiring
Provide the electrical schematic wiring diagram (located within the Ironworker control box) to your Electrician prior to initiating the electrical hookup of the machine.
Power up the Ironworker
With all stations clear of tools, tooling or debris, power up the Ironworker by depressing the green button on the starter box. With the power on, your machine will return to a neutral position.
Cycle the machinery by depressing the foot pedal. If pressure is released at the foot pedal prior to completing a full stroke, the operating center of the machinery will return to a neutral position.
If the machinery fails to cycle the motor may be rotating incorrectly. To ensure the machinery cycles properly simply reverse two of the phase wires on the machine starter box.
If the machine fails to cycle, power down the Ironworker by depressing the red button on the starter box, Lockout / Tagout the upstream power and consult the trouble shooting section of the Operator Manual.
Page 5
P.O. Box 166, Albert Lea, MN 56007 800-373-8206 www.edwardsironworkers.com
S
Loading...