Edsal MR1848 User Manual

Maxi Rack Boltless Shelving
MODEL NUMBER (s)
MR185 - MR245 - MR1848
MR
-
185 5 Shelf
MR
-
185 5 Shelf
MR
-
185 5 Shelf
Description
A - Beams B - Braces C - Post D - Wood Shelf
-
72”h x 18”d x 36”w
-
72”h x 18”d x 36”w
-
72”h x 18”d x 36”w
Qty.
Part Number
10 10
8 5
RMBE3502 RMBE1702
RUPT3602S
RPB21836
Part Size
35 5/32” 17 5/32”
36”
35 29/32”
B - Braces
MR
-
245 5 Shelf
MR
-
245 5 Shelf
MR
-
245 5 Shelf
Description
A - Beams B - Braces C - Post D - Wood Shelf
D - Wood Shelf
-
72”h x 24”d x 48”w
-
72”h x 24”d x 48”w
-
72”h x 24”d x 48”w
Qty.
Part Number
10 10
8 5
RMBE4702 RMBE2402
RUPT3602S
RPB22448
A - Beams
Part Size
47 5/32” 23 5/32”
36”
47 29/32”
MR
MR
MR
Description
A - Beams B - Braces C - Post D - Wood Shelf
-
1848 5 Shelf
-
1848 5 Shelf
-
1848 5 Shelf
Qty.
C - Post
-
72”h x 18”d x 48”w
-
72”h x 18”d x 48”w
-
72”h x 18”d x 48”w
Part Number
10 10
8 5
RUBE4702 RUBE1702
RUPT3602S
RPB21860
Part Size
47 5/32” 17 5/32”
36”
47 29/32”
Safety Instructions
Safety Instructions
Safety Instructions
These units should be placed on a level surface. Failure to do so can result in poor product performance or create a possible safety hazard. This unit should be securely anchored to a wall or floor with suitable fasteners, which are not included. Do not use this unit for anything other than the manufactures intended purpose. DO NOT STAND ON ANY PART OF THE UNIT, OR USE IT AS A LADDER. Evenly distribute the weight on each level and always keep the heavier loads on the bottom. Use care when working with metal parts.
General Instructions
General Instructions
General Instructions
Assembly is done with the rivets of the beams and braces fitting into the slots of the post. A rubber mallet may be used on the beams and braces to seat the rivets properly. A hammer can also be used, providing one uses a cloth or a block of wood be­tween the hammer head and the parts to prevent damage. Tap gently and be sure the rivets are straight and fully engaged.
Should you have any comments, damage, missing parts, or problems with assembly of this unit please feel free to contact our Maxi Rack manufacturing facility at, (773) 475-3000 and request customer service. We can also
be reached on the internet at the following email address : customerservice@edsal.com.
To obtain replacement parts, please provide the following information :
- Model # - Part # & Description - Location Purchased - Date Purchased
Consumer Products Division Edsal Manufacturing Company
4400 South Packers Avenue Chicago, IL 60609 www.edsal.com
Assembly Instructions for MR185
Assembly Instructions for MR185
Assembly Instructions for MR185
-
MR245
-
MR245
-
MR245
-
MR1848
-
MR1848
-
MR1848
Step
1
Figure A
Post
Brace
Assemble two (2) post with one (1) brace. Skipping one slot from the bottom of the post (see figure A), place the rivets into post with the slot pointing down, and with the shelf ledge of the brace facing up (see figure B). Tap lightly to seat riv­ets. Repeat with two (2) post and one (1) brace. Assemble the two (2) post units with two (2) beams (see figure C). Skip one hole from the bottom of post, tap lightly to seat rivets.
Figure B
Note: Post are directional. The slot must point down.
Figure C
Figure C
Tap Lightly
Shelf Ledge
Post Slot Points Down
Beam
Step
2
Wood Shelf
Start by adding a wood shelf to the level previously built, then continue working by adding the second level using two (2) beams and two (2) braces in the post slots of your desired location. Again place the rivets of the beams and braces into the post slots with the shelf ledge facing up and tap lightly to seat the rivets.
IMPORTANT NOTE : Make sure all rivets are fully seated into the post slots.
IMPORTANT NOTE : Make sure all rivets are fully seated into the post slots.
IMPORTANT NOTE : Make sure all rivets are fully seated into the post slots.
Step
Note: Post are directional. The slot must point down.
3
Top
Figure D
Tap Lightly
Bottom Post
Add a wood shelf to the previously built level, then as­semble the top post to the bottom post by using two (2) beams and two (2) braces. One (1) rivet from each beam and brace must be placed in the top hole of the bottom post, and the bottom hole of the top post (see figure D). After all beams and braces are in place, tap lightly to properly seat the rivets.
Post
Slot Down
Wood Shelf
Step
4
Add a wood shelf to the previously built level, then con­tinue by adding the fourth and fifth level to the unit using two (2) beams and two (2) braces per level. Tap lightly to properly seat the rivets and add the final wood shelves to the unit.
Loading...