Edge Lighting Twiggy, Tubular User Manual

1718 W. Fullerton Ave
Chicago, IL 60614
Tel: 773-770-1195
Fax: 773-935-5613
www.edgelighting.com
© 2013 Edge Lighting. All Rights Reserved.
info@edgelighting.com
Installation Instructions for Twiggy Tubular Lens 12 VAC
IMPORTANT INFORMATION
- This instruction shows a typical installation.
- This product is wall mount only.
- This product is dimmable with a low-voltage electronic dimmer.
- This product must be installed by a qualified electrician.
- The 1RE version mounts to the provided C-1RE-JBOX. The 4SQ version mounts to standard electrical box with plaster ring or octagon box.
SAVE THESE INSTRUCTIONS!
1RE
J-BOX IN
MIDDLE
Section One: Steps For TW12-1RE Version
A
ADJUSTABLE MOUNTING BAR
3
2
1
1
2
3
VERTICAL
ORIENTATION
JUNCTION BOX
1: Determine channel orientation. Mount each adjustable mounting bar to one side of the junction box and secure them with the provided mounting brackets and two Phillips screws.
TW12-T1-1RE-_
904-TW12-T1-01
TW12-T1-4SQ-_
w/4" SQUARE CANOPY
J-BOX
OFFSET
1
PHILLIPS SCREW
MOUNTING BRACKET
HORIZONTAL
ORIENTATION
JUNCTION BOX
1
3
3
2
2
1
1
NOTE: The adjustable mounting bars mount to studs that are spaced
13" to 24" apart.
NOTE: Ensure the opening of the junction box is alinged with the
center of the desired fixture location. If necessary, adjust the junction box location by loosening the screws and sliding the junction box to the proper location. Tighten the Phillips screws after adjusting.
Select the location between the two studs for the junction
2: box to be mounted.
3: Place the adjustable mounting bars between the studs.
4: Make sure the lips on the adjustable mounting bars are
against the studs. Secure the adjustable bars to the studs with the eight #8 screws.
C
CONDUIT
B
FIXTURE LOCATION CENTER LINE
#8 SCREW
STUD
3
4
JUNCTION BOX
3
2
1
1
2
3
2
ADJUSTABLE MOUNTING BAR
5: Remove a knockout to install the power line conduit.
JUNCTION BOX
STUD
6: Install the conduit and run the 120V power wires.
3
2
1
1
2
3
5
6
1
D
ADJUSTABLE MOUNTING BARS
TRANSFORMER
NOTE: If necessary junction box opening can be adjusted to two
JUNCTION BOX
8
9
3
2
1
1
2
7
3
CONDUIT
positions: Position 2 at 0.95" (recommended for this installation), or Position 3 at 1.05". Simply loosen screws and tighten to the corresponding position labeled on junction box. POSITION ONE SHOULD NOT BE USED FOR THIS INSTALLATION as it will not allow access to the LED transformer after installation.
7: Connect the white transformer wire to the neutral power wire with a wire nut.
8: Connect the black transformer wire to the hot power wire with a wire nut.
9: Place the transformer and transformer wires inside the junction box.
Mark a rectangle shape on drywall where the junction box
10:
opening will be located depending on selected position.
11: Cut out the marked rectangle opening, using a "Dremel Multi-Max" with the "wood & drywall" cutting bit.
12: Install & finish drywall.
F
14
GOOF PLATE
(ONLY USE IF JAGGED PLASTER EDGE, PAINT TO MATCH)
14
SCREW
13
JUNCTION BOX OPENING EDGE
E
10
11
WOOD & DRYWALL CUTTING BIT
13: Install the drywall and plaster around the junction box opening. Sand and then paint.
14: If necessary: Use the Goof Plate if the junction box opening has a lot of imperfection/jagged edges. Install the provided goof plate (paint to match prior) with the two screws.
15: Complete installation by following steps in Section Three.
RECTANGLE OPENING
DREMEL MULTI-MAX
DRYWALL
Section Two: Steps For TW12-4SQ Version
G
TRANSFORMER
1
WIRE NUT
2
3
1: Connect the white power supply wire to the neutral power
wire with a wire nut.
2: Connect the black power supply wire to the hot power wire with a wire nut.
3: Place the power supply and wires inside the electrical box.
H
4: Feed the transformer wires from the crossbar center hole
and mount the crossbar to the electrical box holes with the two #8-32 screws provided.
5: Complete installation by following steps in Section Three.
CROSSBAR
4
ELECTRICAL BOX
#8-32 SCREW
2
Loading...
+ 2 hidden pages