Section One: Basic Configuration Options
Horizontal Configuration
INS# 902-TL1.6A-07
1718 W. Fullerton Ave
Chicago, IL 60614
Tel: 773-770-1195
Fax: 773-935-5613
www.purelighting.com
info@purelighting.com
Horizontal installations are linear runs of channel beginning at a junction box and ending at a take-up box on a single surface. Runs
can be up to 40' in length and the LED strip lays in the bottom of the channel.
Horizontal installations are typically installed perpendicular to wall studs or ceiling joists. Where no stud/joist is present (or in a
remodel installation) a mounting strap may be used to secure the channel to the drywall.
Vertical Configuration
Vertical installations are linear runs of channel beginning at a
junction box and ending at a take-up box on a single surface.
Runs can be up to 40' in length and the LED strip lays in the
bottom of the channel.
Vertical installations are typically installed between wall studs or
ceiling joists. Cross-braced stud sections or mounting straps are
suggested to provide additional support every 32".
1
Room-Wrapping Configuration
Room-wrapping configurations are used
MOUNTING
STRAP
TL1.6-RWM
INSIDE
CORNER
CHANNEL
for installations that join runs of TruLine
1.6 on multiple planes (like a ceiling and a
wall) using miter-cut linear sections of
channel.
For room-wrapping installations, the LED
strip will be installed in the bottom of the
channel.
MOUNTING
STRAP
LED
STRIP
(SHOWN
IN RED)
CHANNEL
PLASTER
LENS
2x4
STUD
2x4
STUD
LENS
Zig Zag Configuration
TAKE-UP
BOX
2x4
STUD
MOUNTING
STRAP
JUNCTION
BOX
2x4
BRACE
TL 1.6
CHANNEL
LENS
Zig Zag configurations are used for
installations that join runs of TruLine 1.6
on a single plane (like a ceiling or a wall)
using sections of channel joined by L
connections or miter cut linear sections of
channel.
For Zig Zag installations, the LED strip will
be installed in the side of the channel,
allowing the LED strip to follow the zig zag
channel pattern.
DRYWALL
MOUNTING
STRAP
CHANNEL
DRYWALL
DRYWALL
SCREW
PLASTER
LENS
DRYWALL
SCREW
LED
STRIP
(SHOWN
IN RED)
Section Two: Standard Horizontal Installation
A
ADJUSTABLE
JUNCTION
BOX
INSTALLATIONDIRECTION
PHILLIPS
SCREW
1
1: Mount each adjustable mounting bar to one side of the
junction box and secure them with the mounting brackets
and two Phillips screws provided.
MOUNTING BAR
MOUNTING
BRACKET
B
CONDUIT W/
LOW-VOLTAGE WIRES
NOTE: The adjustable mounting bars mount to studs that
are spaced 13" to 24" apart.
2: Place the lips on the adjustable mounting bars against
the studs. Secure the adjustable bars to the studs with
the eight #8 screws.
3: Install conduit (if required by local electrial code) and run
low-voltage power wires to the junction box.
2
STUD
ADJUSTABLE
MOUNTING BAR
3
#8 SCREW
JUNCTION
BOX
2
C
NOTE: If cutting channel to length, ensure that the lens is also cut to match the total length of the installation.
NOTE: If cutting channel to length, ensure that the lens is also cut to match the total length of the installation.
STARTER
SECTION
CUT LENS LENGTH TO TOTAL LENGTH
CHANNEL
SECTION
D
6" FIXED
JAB SAW
4: Cut a section of drywall where the junction box will be located
using a 6" fixed jab saw or other appropriate tool.
4
E
6
5
5: Mark the area where the channel will be located on the drywall using the junction box opening as a guide (MIN 2.25").
STUD
8
MARKING
WIDTH OF
INSTALLATION
MOUNTING
STRAP
6
2.25"
6: Cut out the marked area using a "Dremel Multi-Max" or a 6" Fixed Jab Saw.
8: Mark the location of the studs to the drywall for future reference.
NOTE: To install channel in a wall without standard-spaced studs, install perforated mounting straps every 32" behind drywall
and secure using two drywall screws. Mark the location of any mounting straps to the drywall.
F
JUNCTION BOX
10
9: Connect the red power supply (24VDC+) wires to each red
power wire with a wire nut inside the junction box.
10: Connect the black power supply (24VDC-) wires to each black
power wire with a wire nut inside the junction box.
11: Place the wire nut connections inside junction box.
9
POWER
WIRE
3
G
TRAP DOOR
FRAME
H
12
13
CHANNEL
JOINER
BAR
12: Insert the joiner bars halfway into the channel trap door
frame. Tighten the two #4-40 set screws on each joiner bar
with a 0.05" Allen wrench.
13: Slide the other section of channel onto the joining bars and
tighten the remaining #4-40 set screws with a 0.05" Allen
wrench.
I
TRAP DOOR
FRAME
END CAP
16
T10 TORX
POWER
CONNECTOR
15
END CAP
END CAP
INSERT
14: Place both power connector into the end cap insert.
15: Slide the assembled end cap insert and power connectors
into the end cap.
16: Insert the #4-40 Torx screws through the end cap holes and
thread into the TruLine 1.6A channel.
17: Tighten the end cap to the channel using the provided T10
Torx screwdriver.
14
17
J
POWER FEED
JUNCTION BOX
MARKING
MARKING
18
ENDCAP
19
18: Using the mark locations on the drywall, carefully make holes in the channel flange using the provided square drill with counter
sink bit.
19: Secure the channel to the stud through the drywall with the #6 screws using the provided square recess bit.
#6 SCREW
CHANNEL
#6 SCREW
4
K
20
ULTRA THIN
DRYWALL TAPE
20: Apply ultra-thin drywall tape along edges of channel to prevent cracking of plaster after installation.
L
PLASTER
NOTE: Test the LED strip before any plaster work is done. NOTE: Cover the channel opening with blue contractor’s tape before plastering.
21: Use a 12" compound knife for a smooth compound spread. Sand, paint, and finish the plaster and drywall before removing the
blue contractor’s tape.
M
#6-32
SCREW
TRAP DOOR
12" COMPOUND
KNIFE
23
21
CONTRACTOR'S
TAPE
22: Remove the blue contractor’s tape from the inside of the
channel. Clean the channel surface with alcohol to remove
any dust or debris before continuing.
23: Attach the trap door to the junction box using the #6-32 screw.
22
N
TRAP DOOR
24
POWER
WIRE
24: Line up the red wire side of the power connector with the “+24VDC” marking on the Soft Strip. Push the male connector of the
Soft Strip into the female connector of the power cables.
25: Carefully remove the backing from the LED soft strip, making sure not to remove the tape from the soft strip. Firmly press down
the adhesive portion of the soft strip onto the channel surface while removing the rest of the backing, making sure there are no
air bubbles that can cause surface irregularities.
26: If required, trim the soft strip on the dashed cuttable section, place the excess soft strip inside the take up box (see inset).
Ensure the entire length of the channel is covered with Soft Strip to avoid unlit areas.
25
PAPER
BACKING
SOFT STRIP
CHANNEL
TAKE UP
BOX
EXCESS
SOFT STRIP
26
5
O
CORRECT
27
27: Snap the lens back onto the channel. Ensure lens is fully seated.
Section Three: Vertical Installation
P
ADJUSTABLE
MOUNTING BAR
PHILLIPS
SCREW
1: Mount each adjustable mounting bar to one side of the
junction box and secure them with the mounting brackets
and two Phillips screws provided.
VERTICAL
ORIENTATION
INSTALLATION
DIRECTION
JUNCTION
BOX
1
MOUNTING
BRACKET
NOT INSTALLED
CORRECTLY
27
Q
STUD
CONDUIT
3
2: Remove a knockout to install the power line conduit (if
required by local electrical code.
3: Install the conduit and run the low voltage 24V DC power
wires coming from the remote power supply to the
junction box.
JUNCTION
BOX
ADJUSTABLE
MOUNTING BAR
4: Refer to the instruction provided with the power supply
along with the wiring diagram for proper wiring.
R
NOTE: If cutting channel to length, ensure that the lens is also cut to match the total length of the installation.
STARTER
SECTION
CUT LENS LENGTH TO TOTAL LENGTH
CHANNEL
SECTION
6
Loading...
+ 11 hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.