![](/html/5b/5b40/5b404155ce029836bb66b62d4cf4a86e2cfa0a22931cfb20a8c4c90929704aa9/bg1.png)
© 2009 Edge Lighting. All Rights Reserved.
1718 W. Fullerton Ave
Chicago, IL 60614
Tel: 773-770-1195
Fax: 773-935-5613
www.edgelighting.com
info@edgelighting.com
MS-1-_
904-MS-1-02
Installation Instructions for
Monorail 1" Rigid Standoff
IMPORTANT INFORMATION
- This product is ETL listed for indoor dry locations.
- The product is intended to be used with Edge Lighting
Monorail systems only.
- Use Monorail standoffs where the Monorail sections join
together and approximately every 3 feet throughout the
Monorail run.
SAVE THESE INSTRUCTIONS!
Install the Standoff
A
2
CEILING
3
1: Hold the Monorail section against the ceiling or use a plumb
bob to mark the standoff locations onto the ceiling (this may
require more than one person).
2: Tap the anchors onto the marked locations up to the
threaded portion with a hammer.
3: Screw the threaded portion of the anchors in with a Phillips
screwdriver.
ANCHOR
4: Mount the standoffs onto the anchors with the #8 screws
provided. Make sure that the cut out portion of the
standoffs lines up with the Monorail.
C
MONORAIL
5
1.5MM ALLEN
WRENCH
M3 SET
SCREW
5
B
4
5: Slide Monorail into the cut out portion of the standoffs. Hold
the Monorail against the standoffs (
than one person)
standoff with the 1.5mm Allen wrench.
#8 SCREW
1" STANDOFF
and tighten the M3 set screw on each
4
this may require more
1