Edge Lighting Cirrus Channel, Wall Grazer User Manual

© 2013 Edge Lighting. All Rights Reserved.
1718 W. Fullerton Ave
Chicago, IL 60614
Tel: 773-770-1195
Fax: 773-935-5613 www.edgelighting.com info@edgelighting.com
CC-WG-7WDC-_
Installation Instructions for Cirrus Channel, Wall Grazer, 24VDC
IMPORTANT INFORMATION
- This instruction shows a typical installation.
- Per NEC Article 410.16(A)(1)(3) & 410.16(C)(5). Approved for Closet Storage Areas.
SAVE THESE INSTRUCTIONS!
Connecting the Channel
NOTE:
A
CHANNEL
TOP OF CHANNEL
JOINER BRACKET
1
LENS
1: Lift a section of the lens at the end of the channels where the connectors are visible. Slide the channel over the joiner bracket make sure that the male & female connectors mate properly.
2: Push the lens back into the channel.
Omit this section if the channel is made out of a single
piece (120" or less).
NOTE: Prior to installation, multi-sectional Cirrus Channel should
be connected together for marking proper measurements.
NOTE: It is recommended more than one person to assist in this
installation.
904-CC-WG-02
NOTE:
When using Edge Lighting Slim Profile Junction Box (C-1RE-BOX), continue to "Install the Channel using the Junction Box (C-1RE-JBOX)" on page 3.
FEMALE CONNECTOR
MALE CONNECTOR
Mounting Channel for proper Lighting Distribution
FRONT
VIEW
1: Choose one of the two options to install the channel to
properly graze the textured wall. Option B: Mount the channel 3" to 6" away from the straight textured wall. Option C: Mount the channel next to the textured wall that is installed at an 11° angle.
CHANNEL
JOINER CHANNEL
B
CEILING
LIGHT
BEAMS
TEXTURED WALL
STUD
Install Channel on Standard Junction Box W/Plaster Ring or Octagon Box
JUNCTION BOX
CROSSBAR
C
CEILING
LIGHT
BEAMS
TEXTURED WALL ON A 11°
D
STUD
1
1: Mount the crossbar to the Junction box holes with the two
#8-32 screws provided.
#8-32 SCREW
NOTE:
C-1RE-JBOX.
1
JUNCTION BOX
E
2
LOCKING CLIP
MOUNTING CLIP (C-MCL)
LOCKING CLIP
MARKING LOCATION
3
EVERY 20 INCHES
BOTTOM OF CHANNEL
NOTE: Remote power supply must be installed within 40ft of
Junction box. The low voltage 24V DC wires must be present in Junction box before installing the channel. Refer to the installation instructions provided with the power supply. See page 5 for wiring diagram.
2: Begin installation using side of the channel with power wire. Lay channel to the desired location & make all necessary markings which will consist of the channel ends, locking clips and mounting clips. Mounting clips must be installed 20" from each other. Locking clips are not necessary for channels under 2ft.
NOTE:
Steps 3 and 4 are for drywall mounting. Omit these steps
if mounting the clips to a wood surface directly.
4: Tap the anchors onto the marked points up to the threaded portion with a hammer.
5: Screw in the threaded portion of the anchors with a Phillips screwdriver.
CHANNEL END
RECEIVING BRACKET
NOTE: If the receiving bracket interferes with the Junction box
or wires, then relocate the receiving bracket by loosening the screws and make the necessary adjustments.
NOTE: The channel must pass through the center of the
Junction box.
3: After all markings and required measurements are done, take the channels apart from each other.
F
4
SURFACE
ANCHOR
5
ANCHOR MUST
BE FLUSH TO WALL
G
LOCKING CLIP
6
6: Line up the locking clips & mounting clips to anchor holes
and secure them by tightening the two #6 screws through the clip holes followed by the washers into the anchors.
H
7
8
MOUNTING CLIP (C-MCL)
MOUNTING CLIP (C-MCL)
6
#6 SCREW
6
LOCKING CLIP
WASHER (OPTIONAL)
ANCHOR
LOCKING CLIP
WIRE MANAGEMENT CLIP
9
CORD
CHANNEL
7: Connect the red power supply (24VDC+) wire to red strip wire with a wire nut inside the Junction box.
8: Connect the black power supply (24VDC-) wire to black strip wire with a wire nut inside the Junction box.
9: Snap the wire management clip to hold the cable in place if necessary.
2
I
10
MOUNTING CLIP (C-MCL)
LOCKING CLIP
CHANNEL
10: Carefully snap channel onto the locking/mounting clips then slide 2" into receiving bracket to lock in place. Make sure not to nick the wires.
J
12
12
SCREW
ALLEN WRENCH
CHANNEL
CANOPY
BACK OF CHANNEL
LOCKING CLIP
RECEIVING BRACKET
11: If applicable, connect the remaining channels by following "Connecting the Channel" on page 1. Then secure by repeating step 10 (above).
12: Place each canopy piece against the channel & line up the canopy hole with the crossbar hole. Secure the canopy in place with the screw & Allen wrench provided.
Install the Channel using the Junction Box (C-1RE-JBOX)
K
3
2
ADJUSTABLE MOUNTING BAR
VERTICAL
ORIENTATION
PHILLIPS SCREW
1
1
2
3
JUNCTION BOX
1
MOUNTING BRACKET
1: Mount each adjustable mounting bar to one side of the junction box (mounts to any side of the housing depending on the orientation of the channel) and secure them with the mounting brackets and two Phillips screws provided.
L
JUNCTION BOX
4
4
ADJUSTABLE MOUNTING BAR
STUD
2
#8 SCREW
4
4
HORIZONTAL
ORIENTATION
JUNCTION BOX
1
3
3
2
2
1
1
NOTE: The adjustable mounting bars mount to studs that are
spaced 16" to 24" apart.
Select the location between the two studs for the Junction
2: box to be mounted.
3: Place the adjustable mounting bars between the studs.
4: Make sure the lips on the adjustable mounting bars are
against the studs. Secure the adjustable bars to the studs with the eight #8 screws.
3
M
CONDUIT
JUNCTION BOX
5
STUD
ADJUSTABLE MOUNTING BAR
5: Remove a knockout to install the power line conduit.
6: Install the conduit and run the low voltage 24V DC power
wires coming from the remote power supply to the Junction box.
NOTE: Remote power supply must be installed within 40ft of
Junction box. The low voltage 24V DC wires must be present in Junction box. See wiring diagram on page 5 for more information.
N
RECTANGLE OPENING
DRYWALL
Mark a rectangle shape on drywall where the junction box
7:
opening will be located depending on selected position.
8: Cut out the marked rectangle opening, using a "Dremel Multi-Max" with the "wood & drywall" cutting bit.
9: Install & finish drywall.
O
POWER FEED END
BOTTOM OF CHANNEL
JUNCTION BOX OPENING
10
OF CHANNEL
MOUNTING CLIP (C-MCL)
EVERY 20 INCHES
10: Start off the installation using the channel with the power wire. Lay the channel to the desired location & make all necessary markings which will consist of the channel ends, locking clips and mounting clips. Mounting clips must be installed every 20" from each locking clip, locking
mounting clips are not necessary for channels under 2ft.
7
8
WOOD & DRYWALL CUTTING BIT
LOCKING CLIP (OPPOSITE SIDE OF POWER WIRE)
DREMEL MULTI-MAX
MARKING LOCATION
10
CHANNEL
END
RECEIVING BRACKET
NOTE: If the receiving bracket interferes with the Junction box,
then relocate the bracket by loosening the set screws and make the necessary adjustments.
NOTE: The channel must pass through the center of the
Junction box.
11: After all markings and required measurements are done, take the channels apart from each other.
P
LOCKING CLIP
12
12: Line up the locking clips & mounting clips to anchor holes
and secure them by tightening the two #6 screws through the clip holes followed by the washers into the anchors.
MOUNTING CLIP (C-MCL)
#6 SCREW
WASHER (OPTIONAL)
ANCHOR
12
LOCKING CLIP
4
Q
SCREW
JUNCTION BOX OPENING EDGE
PLASTER THE EDGE OF
13
THE JUNCTION BOX
13
13: Optional: Use the Goof Plate if the junction box
opening has a lot of imperfection/jagged edges. Install the provided goof plate (paint to match prior) with the two screws.
GOOF PLATE
(ONLY USE IF JAGGED PLASTER EDGE, PAINT TO MATCH)
R
14
LOCKING CLIP
15
14: Connect the red power supply (24VDC+) wire to red strip
wire with a wire nut inside the Junction box.
15: Connect the black power supply (24VDC-) wire to black strip wire with a wire nut inside the Junction box.
96W, 24VDC LOW VOLTAGE WIRE SIZE CHART
WIRE LENGTH
3%
VOLTAGE
DROP
IN FT
WIRE SIZE
VOLTAGE AT END
OF THE WIRE
MOUNTING CLIP (C-MCL)
UP TO 33FT
14 AWG
23.28 VDC
WIRE MANAGEMENT
CLIP LOCKING BRACKET
CORD
16
CHANNEL
16: Snap the wire management clip to hold the cable in place if necessary.
34FT-52FT
12 AWG
23.29 VDC
53FT-86FT 87FT-130FT
10 AWG 8 AWG
23.28 VDC 23.28 VDC
GENERAL WIRING DIAGRAM
WHITE (NEUTRAL)
INPUT
120VAC
GND
BLACK (HOT)
RED 120VAC (HOT)
PURPLE 1-10V
GRAY 1-10V
DIMMING
LIGHTOLIER:
ZP600FAM120
CONTROLLER
PSB-96W-010-24VDC
input 120VAC WH (N) BK (L)
input 0-10V PUR GRY
RED (24VDC+)
BLUE (RETURN-)
YELLOW (DIM RETURN-)
24VDC
RED 24VDC+
BLACK 24VDC-
CIRRUS CHANNEL
5
Loading...