IMPORTANT INFORMATION
- This instruction shows a typical installation.
- Per NEC Article 410.16(A)(1)(3) & 410.16(C)(5). Approved for Closet Storage Areas.
SAVE THESE INSTRUCTIONS!
Connecting the Channel
NOTE:
A
CHANNEL
TOP OF CHANNEL
JOINER BRACKET
1
LENS
1: Lift a section of the lens at the end of the channels where the connectors are visible. Slide the channel over the joiner bracket make sure that the male & female connectors mate properly.
2: Push the lens back into the channel.
Omit this section if the channel is made out of a single
piece (120" or less).
NOTE: Prior to installation, multi-sectional Cirrus Channel should
be connected together for marking proper measurements.
NOTE: It is recommended more than one person to assist in this
installation.
904-CC-WG-02
NOTE:
When using Edge Lighting Slim Profile Junction Box (C-1RE-BOX), continue to "Install the Channel using the Junction Box (C-1RE-JBOX)" on page 3.
FEMALE CONNECTOR
MALE CONNECTOR
Mounting Channel for proper Lighting Distribution
FRONT
VIEW
1: Choose one of the two options to install the channel to
properly graze the textured wall. Option B: Mount the channel 3" to 6" away from the straight textured wall. Option C: Mount the channel next to the textured wall that is installed at an 11° angle.
CHANNEL
JOINER CHANNEL
B
CEILING
LIGHT
BEAMS
TEXTURED WALL
STUD
Install Channel on Standard Junction Box W/Plaster Ring or Octagon Box
JUNCTION BOX
CROSSBAR
C
CEILING
LIGHT
BEAMS
TEXTURED WALL ON A 11°
D
STUD
1
1: Mount the crossbar to the Junction box holes with the two
#8-32 screws provided.
#8-32 SCREW
NOTE:
C-1RE-JBOX.
1
JUNCTION BOX
E
2
LOCKING CLIP
MOUNTING CLIP (C-MCL)
LOCKING CLIP
MARKING LOCATION
3
EVERY 20 INCHES
BOTTOM OF CHANNEL
NOTE: Remote power supply must be installed within 40ft of
Junction box. The low voltage 24V DC wires must be present in Junction box before installing the channel. Refer to the installation instructions provided with the power supply. See page 5 for wiring diagram.
2: Begin installation using side of the channel with power wire. Lay channel to the desired location & make all necessary markings which will consist of the channel ends, locking clips and mounting clips. Mounting clips must be installed 20" from each other. Locking clips are not necessary for channels under 2ft.
NOTE:
Steps 3 and 4 are for drywall mounting. Omit these steps
if mounting the clips to a wood surface directly.
4: Tap the anchors onto the marked points up to the threaded portion with a hammer.
5: Screw in the threaded portion of the anchors with a Phillips screwdriver.
CHANNEL END
RECEIVING BRACKET
NOTE: If the receiving bracket interferes with the Junction box
or wires, then relocate the receiving bracket by loosening the screws and make the necessary adjustments.
NOTE: The channel must pass through the center of the
Junction box.
3: After all markings and required measurements are done, take the channels apart from each other.
F
4
SURFACE
ANCHOR
5
ANCHOR MUST
BE FLUSH TO WALL
G
LOCKING CLIP
6
6: Line up the locking clips & mounting clips to anchor holes
and secure them by tightening the two #6 screws through the clip holes followed by the washers into the anchors.
H
7
8
MOUNTING CLIP (C-MCL)
MOUNTING CLIP (C-MCL)
6
#6 SCREW
6
LOCKING CLIP
WASHER (OPTIONAL)
ANCHOR
LOCKING CLIP
WIRE MANAGEMENT CLIP
9
CORD
CHANNEL
7: Connect the red power supply (24VDC+) wire to red strip wire with a wire nut inside the Junction box.
8: Connect the black power supply (24VDC-) wire to black strip wire with a wire nut inside the Junction box.
9: Snap the wire management clip to hold the cable in place if necessary.