Edge Lighting Cirrus Channel, Tubular User Manual

© 2013 Edge Lighting. All Rights Reserved.
1718 W. Fullerton Ave
Chicago, IL 60614
Tel: 773-770-1195
Fax: 773-935-5613 www.edgelighting.com info@edgelighting.com
CC-T1-2WDC-_
CC-T1-5WDC-_
Installation Instructions for Cirrus Channel T1, Tubular 1" 24VDC
IMPORTANT INFORMATION
- This instruction shows a typical installation.
- Per NEC Article 410.16(A)(1)(3) & 410.16(C)(5). Approved for Closet Storage Areas.
SAVE THESE INSTRUCTIONS!
Connecting the Channel
A
CHANNEL
FEMALE CONNECTOR
TOP OF CHANNEL
JOINER BRACKET
1
LENS
MALE CONNECTOR
NOTE:
Omit this section if the channel is made out of a single
piece (120" or less).
NOTE: Prior to installation, multi-sectional Cirrus Channel should
be connected together for marking proper measurements.
NOTE: It is recommended more than one person to assist in this
installation.
1: Lift a section of the lens at the end of the channels where the connectors are visible. Slide the channel over the joiner bracket make sure that the male & female connectors mate properly.
2: Push the lens back into the channel.
904-CC-T1-02
NOTE:
When using Edge Lighting Slim Profile Junction Box
VIEW
CHANNEL
JOINER CHANNEL
(C-1RE-BOX), continue to "Install the Channel using the Junction Box (C-1RE-JBOX)" on page 3.
Install Channel on Standard Junction Box W/Plaster Ring or Octagon Box
B
JUNCTION BOX
1
1: Mount the crossbar to the Junction box holes with the two
#8-32 screws provided.
JUNCTION BOX
C
2
BOTTOM OF CHANNEL
LOCKING CLIP
MOUNTING CLIP (C-MCL)
EVERY 20 INCHES
NOTE: Remote power supply must be installed within 40ft of
Junction box. The low voltage 24V DC wires must be present in Junction box before installing the channel. Refer to the installation instructions provided with the power supply. See page 5 for wiring diagram.
2: Begin installation using side of the channel with power wire. Lay channel to the desired location & make all necessary markings which will consist of the channel ends, locking clips and mounting clips. Mounting clips must be installed 20" from each other. Locking clips are not necessary for channels under 2ft.
NOTE:
C-1RE-JBOX.
NOTE: If the receiving bracket interferes with the Junction box
or wires, then relocate the receiving bracket by loosening the screws and make the necessary adjustments.
NOTE: The channel must pass through the center of the
Junction box.
3: After all markings and required measurements are done, take the channels apart from each other.
CROSSBAR
#8-32 SCREW
Omit this section and follow steps on Page 3 when using
MARKING LOCATION
LOCKING CLIP
CHANNEL END
RECEIVING BRACKET
3
1
D
SURFACE
NOTE:
Steps 3 and 4 are for drywall mounting. Omit these steps
if mounting the clips to a wood surface directly.
4: Tap the anchors onto the marked points up to the threaded portion with a hammer.
4
5: Screw in the threaded portion of the anchors with a Phillips
screwdriver.
ANCHOR
5
ANCHOR MUST
BE FLUSH TO WALL
E
LOCKING CLIP
6
6: Line up the locking clips & mounting clips to anchor holes
and secure them by tightening the two #6 screws through the clip holes followed by the washers into the anchors.
F
7
8
LOCKING CLIP
MOUNTING CLIP (C-MCL)
MOUNTING CLIP (C-MCL)
6
#6 SCREW
6
LOCKING CLIP
WASHER (OPTIONAL)
ANCHOR
LOCKING CLIP
WIRE MANAGEMENT CLIP
9
CORD
CHANNEL
7: Connect the red power supply (24VDC+) wire to red strip wire with a wire nut inside the Junction box.
8: Connect the black power supply (24VDC-) wire to black strip wire with a wire nut inside the Junction box.
G
LOCKING CLIP
10
CHANNEL
10: Carefully snap channel onto the locking/mounting clips then slide 2" into receiving bracket to lock in place. Make sure not to nick the wires.
9: Snap the wire management clip to hold the cable in place if necessary.
MOUNTING CLIP (C-MCL)
BACK OF CHANNEL
LOCKING CLIP
RECEIVING BRACKET
LOCKING CLIP
11: If applicable, connect the remaining channels by following "Connecting the Channel" on page 1. Then secure by repeating step 10 (above).
2
Loading...
+ 3 hidden pages