Edge Lighting Cirrus Channel, Square User Manual

1718 W. Fullerton Ave
Chicago, IL 60614
Tel: 773-770-1195
Fax: 773-935-5613 www.edgelighting.com info@edgelighting.com
CC-S1-_
Installation Instructions for Cirrus Channel, Square 1" Lens
IMPORTANT INFORMATION
- This instruction shows a typical installation.
SAVE THESE INSTRUCTIONS!
NOTE: Prior to installing the Cirrus Channel, junction box
must be installed. If using Edge Lighting Slim Profile junction box (C-1RE-JBOX) follow steps "Install the Junction Box (C-1RE-JBOX) " below, if using a standard junction box, continue on to steps "Install the Cirrus Channel" on page 2.
Install the Junction Box (C-1RE-JBOX)
: Mount each adjustable mounting bar to one side of the
A
PHILLIPS SCREW
ADJUSTABLE MOUNTING BAR
MOUNTING BRACKET
1
1
electrical box (mounts to any side of the housing depending on the orientation of the channel) and secure them with the mounting brackets and two Phillips screws provided.
904-CC-S1-01
ELECTRICAL BOX
NOTE: The adjustable mounting bars mount to studs that are
spaced 16" to 24" apart.
2:
Select the location between the two studs for the electrical
box to be mounted.
3: Place the adjustable mounting bars between the studs.
4: Make sure the lips on the adjustable mounting bars are
against the studs. Secure the adjustable bars to the studs with the eight #8 screws.
C
STUD
ADJUSTABLE MOUNTING BAR
ELECTRICAL BOX
CONDUIT
5
6
B
4
4
5: Remove a knockout to install the power line conduit.
6: Install the conduit and run the low voltage 24V DC power
wires coming from the remote power supply to the electrical box.
7: Refer to the instruction provided with the power supply to properly wiring diagram.
ELECTRICAL BOX
ADJUSTABLE MOUNTING BAR
STUD
2
#8 SCREW
4
4
1
D
8: Mark a 4" x 0.7" rectangle on drywall where the electrical
box opening will be located.
4"
9: Cut out the marked square(s) and install the drywall.
9
0.7"
DRYWALL
Omit this section if the channel is made out of a single
NOTE:
piece (120" or less).
NOTE: Prior to installation, Cirrus Channel must be connected to
one another to make proper measurements on surface for markings.
NOTE: It is recommended more than one person to assist in this
installation
1: Lift a section of the lens at the end of the channels where the connectors are visible. Slide the channel over the joiner bracket make sure that the male & female connectors mate properly.
2: Push the lens back into the channel.
Install the Channel
F
1
POWER FEED END
OF CHANNEL
JUNCTION BOX
Connecting the Channel
E
CHANNEL
MOUNTING CLIP (C-MCL)
EVERY 20 INCHES
LOCKING CLIPLOCKING CLIP
FEMALE CONNECTOR
CHANNEL
JOINER BRACKET
1
LENS
MALE CONNECTOR
JOINER CHANNEL
MARKING LOCATION
1
CHANNEL
END
BOTTOM OF CHANNEL
NOTE: Remote power supply must be installed within 40ft of
electrical box. The low voltage 24V DC wires must be present in electrical box before installing the channel. Refer to the installation instructions provided with the power supply.
1: Lay the channel to the desired location & make all necessary markings which will consist of the channel ends, locking clips and mounting clips. Mounting clips must be installed every 20" from each locking clip, locking mounting clips are not
necessary for channels under 2ft.
NOTE: If the receiving bracket interferes with the electrical box,
then relocate the bracket by loosening the set screws and make the necessary adjustments.
NOTE: The channel must pass through the center of the
electrical box.
2: After all markings and required measurements are done, take apart channels from each other.
RECEIVING BRACKET
2
G
SURFACE
Steps 3 and 4 are for drywall mounting. Omit these steps
NOTE:
if mounting the clips to a wood surface directly.
3: Tap the anchors onto the marked points up to the threaded portion with a hammer.
3
ANCHOR
BE FLUSH TO WALL
4
ANCHOR MUST
H
JUNCTION BOX
5: If using the standard Junction box only, mount the crossbar to the electrical box holes with the two #8-32 screws provided.
I
#6 SCREW & WASHER
LOCKING CLIP
6
4: Screw in the threaded portion of the anchors with a Phillips
screwdriver.
CROSSBAR
5
5
MOUNTING CLIP (C-MCL)
7
#8-32 SCREW
6
6: Line up the locking clips & mounting clips to anchor holes
and secure them by tightening the two #6 screws with washers under the head into each clip.
J
LOCKING CLIP
7: Connect the red power supply (24VDC+) wire to red strip wire with a wire nut inside the electrical box.
8: Connect the black power supply (24VDC+) wire to black strip wire with a wire nut inside the electrical box.
9: Snap the wire management clip to hold the cable in place if necessary.
7
MOUNTING CLIP (C-MCL)
8
WIRE MANAGEMENT CLIP
CORD
CHANNEL
9
3
K
LOCKING CLIP
10
BACK OF CHANNEL
LOCKING CLIP
10: Carefully snap fixture body into the locking/mounting clips then slide (2") into receiving bracket to lock in place. Make sure not to nick the wires.
11: If applicable, connect the remaining channels by following "Connecting the Channel" on page 2. Then secure by repeating step 10 (above).
RECEIVING BRACKET
MOUNTING CLIP (C-MCL)
L
CHANNEL
SCREW
12
12: If using the standard Junction box, Place each canopy
piece against the crossbar and secure it to the electrical box holes with the provided screws.
CHANNEL
CANOPY
12
4
Loading...