Edge Lighting 2 Circuit 4 Power Feed Canopies User Manual

Page 1
© 2009 Edge Lighting. All Rights Reserved.
1718 W. Fullerton Ave
Chicago, IL 60614
Tel: 773-770-1195
Fax: 773-935-5613 www.edgelighting.com info@edgelighting.com
M2P-4RD-1-_
904-M2P-4RD-1-03
Installation Instructions for
Monorail 2 Circuit 4" Round Single Power Feed Canopy
IMPORTANT INFORMATION
- This product is ETL listed for indoor dry locations.
- This product can be installed to a 4" electrical box with round plaster ring, or to an octagon electrical box.
- Minimum electrical box volume must be 6 cubic inches (98 cubic centimeters).
- This product should be installed by a qualified electrician.
SAVE THESE INSTRUCTIONS!
Install the Canopy
COM
4
SIDE WIRE
3
HOT 2
HOT 1
2
NOTE: Use the universal round crossbar (provided) if the electrical
box holes are not spaced 2-3/4" apart.
NOTE: The low voltage wires should be present in the electrical
box. Refer to the instructions provided with the remote transformer to install the transformer and the low voltage wires before proceeding with the steps below.
1: Turn the power to electrical box off.
2: Connect the top contact wire (black wire) to the low voltage
wire marked "HOT 1" with a wire nut.
TOP CONTACT WIRE
CYLINDRICAL CONNECTOR
5: Place all wires inside the electrical box.
6: Secure the power feed canopy to the electrical box by
tightening the two provided #8-32 screws with the 3/32 Allen wrench.
MIDDLE CONTACT WIRE
3: Connect the middle contact wire (coming out of the cylindrical connector) to the low voltage marked "HOT 2" with a wire nut.
4: Connect the remaining side wire to the low voltage wire marked "COM" with a wire nut.
B
5
#8-32 SCREW
3/32 ALLEN WRENCH
6
6
1
Page 2
Install the Monorail 2 Circuit to the Power Feed Canopy
C
POWER HOUSING
CAP
3/8-24 SETSCREW
10: Place the a section of Monorail 2 Circuit into the power housing. Make sure that the Monorail 2 Circuit is supported by the standoffs. Refer to the instructions provided with the standoffs.
11: Tighten the cap to the power housing. Make sure the cap is not cross threaded.
7
8
MIDDLE CONTACT
KNURLED NUT
9
7: Unscrew the cap from the power housing.
8: Slightly loosen the 3/8-24 set screw on the cap with the 3/16 Allen wrench provided, DO NOT REMOVE IT.
9: Slightly loosen the knurled nut on the power housing so that
the middle contact moves back and clears the power housing opening.
D
POWER HOUSING
10
11
CAP
MONORAIL 2 CIRCUIT
E
HOT 1
CAM
HOT 2
CAP
12: Tighten the 3/8-24 set screw on the cap with the 3/16 Allen wrench for proper power connection.
13: Tighten the knurled nut for proper power connection.
KNURLED NUT
13
3/8-24 SET SCREW
12
3/16 ALLEN WRENCH
2
Loading...