1. Unpack the Switch and Check Contents
Wedge-16X-AC Wedge-16X-DC
Rack Mounting Kit—contains two brackets and eight M4 x 0.7 screws
Grounding Wire (included with DC PSUs only)
2. Mount the Switch
Caution:
brackets. The switch requires rack L-shape brackets (or a shelf) to be intalled in a 4-post rack before mounting.
Based on your rack plan, install L-shape brackets (or a shelf) between the front and rear rack posts at the installation position in the rack.
Do not mount the switch using only the supplied
Caution:
unless all supply connections have been disconnected.
The earth connection must not be removed
4. Connect Power
Warning :
to the switch, ensure that power to the feed lines is turned off at the supply circuit breaker or disconnected from the power bus.
Install two AC or two DC power modules in the switch.
Connect an external AC or DC power source to the modules.
Before wiring the DC plug or connecting power
For AC PSUs: Unwind the velcro strip before plugging in the AC power cord, and then use the velcro strip to secure the cord to the PSU.
For DC PSUs: Connect the external power feed and power ground/return lines to the DC plug. The -42 VDC power feed connects to the “-” pin, and the ground/ return to the “+” pin.
5. Verify Switch Operation
Attach the supplied brackets to each side of the switch.
Mount the switch in the rack, and then tighten the bracket thumb-screws to secure the switch in the rack.
3. Ground the Switch
Ensure the rack is properly grounded and in compliance with ETSI ETS 300 253. Verify that there is a good electrical
connection to the grounding point on the rack (no paint or isolating surface treatment).
Attach a lug (not provided with AC PSUs) to an 18 AWG minimum grounding wire (not provided with AC PSUs), and connect it to the grounding point on the switch rear panel. Then connect the other end of the wire to rack ground.
www.edge-core.com
Verify basic switch operation by checking the PSU LEDs. When operating normally, the PSU OK LEDs should be on
green and the FAIL LEDs off. If a FAIL LED is on solid amber, the PSU has an over current,
over voltage, under voltage, over temperature, or fan failure. Replace the PSU.
If a FAIL LED is blinking amber, there is an over temperature condition or a blocked (under speed) fan. Replace the PSU.
– 1 –
E102015-CS-R01 150200001214A
Quick Start Guide
2
1
1
2
6. Connect Network Cables
For the RJ-45 Management port, connect 100-ohm Category 5, 5e or better twisted-pair cable.
Connect network cables to QSFP+ interfaces:
If you are connecting fiber optic cables, first install QSFP+ fiber transceivers and then connect the fiber optic cabling to the transceiver ports.
If you are using twinax copper cables (DAC cables) for port connections, plug the QSFP+ transceivers on the end of the DAC cables directly into the QSFP+ slots.
Hardware Specifications
Switch Chassis
Size (WxDxH) 442 x 617 x 44 mm (17.40 x 24.29 x 1.73 inches)
Weight 9.85 kg (21.72 lb), with two installed PSUs
Temperature Operating: 5° C to 45° C (41° F to 113° F)
Storage: -40° C to 70° C (-40° F to 158° F)
Humidity Operating: 5% to 95% (non-condensing)
Power Consumption
AC Rating (Wedge-16X-AC)
AC Input 100–240 VAC, 50-60 Hz, 3 A
DC Rating (Wedge-16X-DC)
DC Input -42 – -72 VDC, 6 A maximum
Regulatory Compliances
Emissions EN 55022:2010, Class A
282 Watts maximum
EN 61000-3-2:2009, Class A EN 61000-3-3:2008 FCC Class A CE Mark VCCI Class A
Immunity EN 55024:2010
IEC 61000-4-2/3/4/5/6/8/11
Safety CSA 22.2 No 60950-1 & UL60950-1
IEC/EN60950-1
– 2 –
Loading...