The ECS2100 series switches are for indoor use only.
:
For Safety and Regulatory information, refer to the Safety and Regulatory
E012016-AP-R01
– 1 –
150200001318A
Quick Start Guide
2
1
1
2
1. Unpack the Switch Unpack the switch and check the package contents.
◆ECS2100-10T, ECS2100-10P, ECS2100-10PE, ECS2100-28T, ECS2100-28P or
ECS2100-28PP Web-Smart Pro Gigabit Ethernet Switch
◆Rack Mounting Kit containing two standard brackets and eight screws
◆4 adhesive foot pads
◆Power cord— either US, Continental Europe or UK
◆Quick Start Guide
◆Regulatory and Safety Information
Optional Item
◆Console cable—RJ-45 to DB-9
Note:
For other documentations include Installation Guide, Web Management
Guide, and CLI Reference Guide can be obtained from www.edge-core.com ->
support -> download -> user manual.
2. Install the Switch Rack Mounting
The switch can be mounted in a standard 19-inch rack or on a desktop or shelf.
Following your rack plan, mark the holes in the rack where the switch will be
installed. Lift the switch into the rack and hold it in a position aligned with the
marked holes. Secure the switch in the rack, using four rack-mounting screws (not
provided).
Attach the brackets to the switch.
Use the screws supplied with the rack to secure the switch in the rack.
Wall Mounting (ECS2100-10PE only)
The ECS2100-10PE can be mounted on a wall.
Caution:
For safe operation, install the switch with RJ-45 ports facing up.
– 2 –
Set two screws in the wall 150 mm (5.9 in.) apart.
2
1
1
2
1
1
Slide the switch’s wall mounting slots down onto the screws so that the unit is secure.
3. Ground the Switch Before powering on the switch, ground the switch to earth.
Ensure the rack on which the switch is to be mounted is properly grounded and in
compliance with ETSI ETS 300 253. Verify that there is a good electrical connection
to the grounding point on the rack (no paint or isolating surface treatment).
Quick Start Guide
Caution:
The earth connection must not be removed unless all supply
connections have been disconnected.
Connect a grounding wire and lug to the grounding point on the switch rear panel, and then
to rack ground.
4. Connect Power Connect the switch to an AC power source to power on. Verify that the external AC
power requirements for the switch can be met as listed below:
ECS2100-10T: AC 100-240 V, 50-60 Hz, 0.5 A
ECS2100-10P: AC 100-240 V, 50-60 Hz, 2.1 A
ECS2100-28T: AC 100-240 V, 50-60 Hz, 0.5 A
ECS2100-28P: AC 100-240 V, 50-60 Hz, 3.2 A
ECS2100-28PP: AC 100-240 V, 50-60 Hz, 5.8 A
Caution:
on the switch rear panel must be connected to earth.
Before connecting the switch to AC power, the grounding terminal screw
– 3 –
Quick Start Guide
1
1
1
1
2
1
1
Plug the AC power cord into the socket on the rear of the switch.
The ECS2100-10PE includes an AC-DC power adapter. Connect the AC-DC power
adapter to the switch and to an AC power source. The AC-DC adapter provides
54 VDC, 1.67 A of power to the switch.
5. Verify Switch
Operation
Caution:
Before connecting the switch to DC power, the grounding terminal
screw on the switch rear panel must be permanently connected to earth.
Plug the DC power cable into the socket on the rear of the switch.
Plug the AC-DC power adapter into a nearby AC power outlet.
Verify basic switch operation by checking the system LEDs.
When operating normally, the Diag and Power LEDs should both be on green.
System Status LEDs.
– 4 –
Quick Start Guide
1
2
1
2
6. Make Initial
Configuration
Changes
At this point, you may need to make a few basic switch configuration changes
before connecting to the network. you can either connect to the switch console
port or any RJ-45 port to perform this task.
Through an RJ-45 Port
The switch offers a user-friendly web-based management interface for the
configuration of all the unit’s features.
You can make initial configuration changes by connecting a PC directly to one of
the switch’s RJ-45 ports. The switch has a default management IP address of
192.168.2.10 and a subnet mask of 255.255.255.0. You must set your PC IP address
to be on the same subnet as the switch (that is, the PC and switch addresses must
both start 192.168.2.x).
Log in to the web interface using the default settings:
◆Login Name — admin
◆Password — admin
Through the Console Port
The serial port’s configuration requirements are as follows: 115200 bps, 8
characters, no parity, one stop bit, 8 data bits, and no flow control.
You can log in to the command-line interface (CLI) using default settings: User
“admin” with password “admin”.
Console Port.
Console Cable. (Cable not included)
For information on initial switch configuration, refer to the CLI Reference Guide.
– 5 –
Quick Start Guide
1
2
1
2
7. Connect Network
Cables
Install SFP transceivers and connect network cables to port interfaces:
◆For RJ-45 ports, use 100-ohm Category 5, 5e or better twisted-pair cable for
1000BASE-T connections, Category 5 or better for 100BASE-TX connections,
and Category 3 or better for 10BASE-T connections.
◆First install SFP transceivers and then connect fiber optic cabling to the
transceiver ports. The following transceivers are supported:
■
1000BASE-SX (ET4201-SX)
■
1000BASE-LX (ET4201-LX)
■
1000BASE-ZX (ET4201-ZX)
As connections are made, check the port status LEDs to be sure the links are valid.
8. (Optional) Extend
PoE Budget to 740W
(ECS2100-28PP only)
10/100/1000BASE-T RJ-45 Port.
Twisted-pair Cable with RJ-45 Plug.
If you have purchased an optional Extended Power Supply (EPS460W) and Chassis
(PS3000), follow the instructions below to connect it to the ECS2100-28PP and to
AC power.
Note:
The ECS2100-28PP default PoE power budget is 370 W, by purchasing an
Extended Power Supply kit, the ECS2100-28PP can extend its PoE power budget up
to 740W.
– 6 –
Extended Power Supply—EPS460W
1
1
2
4
5
1
3
123
4
5
Quick Start Guide
Install the ECS2100-28PP in a standard 19-inch rack and power on.
Install the PS3000 chassis in a standard 19-inch rack.
Install one or more EPS460W PSUs in the chassis. The chassis can support up to three EPS460W
PSUs.
Use the PSU cable (provided) to connect each EPS460W PSU to an ECS2100-28PP switch.
Connect the AC power cord to power on the EPS460W PSU, and check the LEDs on the PSUs to
ensure proper operation. The Link LEDs for connected switches should light up.
Note:
For International use, you may need to change the AC line cord. You must
use a line cord set that has been approved for the socket type in your country.
– 7 –
Quick Start Guide
Hardware Specifications
ItemSpecification
Chassis Specifications
Size(W x D x H):
WeightECS2100-10T: 816 g (1.8 lb)
TemperatureOperating: 0 ° C to 50 ° C (32 ° F to 122 ° F)
HumidityOperating: 10% to 90% (non-condensing)
Power Specifications
AC Input PowerECS2100-10T: AC 100-240 V, 50-60 Hz, 0.5 A
AC-DC Power Adapter
(ECS2100-10PE only)
Total Power ConsumptionECS2100-10T: 8 W
ECS2100-10T: 19.64 x 11.71 x 3.66 cm (7.73 x 4.61 x 1.44 in.)
ECS2100-10P: 33.0 x 20.4 x 4.26 cm (12.99 x 8.03 x 1.67 in.)
ECS2100-10PE: 24.0 x 15.5 x 2.65 cm (9.44 x 6.10 x 1.04 in.)
ECS2100-28T/28P/28PP: 44 x 22 x 4.4 cm (17.32 x 8.66 x 1.73 in. )
ECS2100-10P: 2.4 kg (5.34 lb)
ECS2100-10PE: 973 g (2.15 lb)
ECS2100-28T: 2.2 kg (4.86 lb)
ECS2100-28P: 2.8 kg (6.18 lb)
ECS2100-28PP: 3.1 kg (6.85 lb)
Operating: 0 ° C to 40 ° C (32 ° F to 104 ° F, ECS2100-10P only)
Storage: -40 ° C to 70 ° C (-40 ° F to 158 ° F)
*
ECS2100-10P: AC 100-240 V, 50-60 Hz, 2.1 A
ECS2100-28T: AC 100-240 V, 50-60 Hz, 0.5 A
ECS2100-28P: AC 100-240 V, 50-60 Hz, 3.2 A
ECS2100-28PP: AC 100-240 V, 50-60 Hz, 5.8 A
Input: AC 100-240 V, 50-60 Hz, 1 A
Output: 54 VDC, 1.67A
ECS2100-10P: 160 W
ECS2100-10PE: 80 W
ECS2100-28T: 20 W
ECS2100-28P: 260 W
ECS2100-28PP: 490 W
ECS2100-28PP+ one extended power supply: 950 W
Regulatory Compliances
EmissionsCE Mark
ImmunityIEC 61000-3-3, 61000-4-2/3/4/5/6/11
SafetyUL/CUL(UL60950-1, CSA60950-1)
* Maximum power consumption values are measured under a 100 percent loading test and
should be used as estimates for planning purposes.