Dust Cover Kit—6 for QSFP port and 48 for SFP ports
Documentation—Quick Start Guide (this document)
and Safety and Regulatory Information
Note:
The switch has the Open Network Install
Environment (ONIE) software installer pre-loaded on the
switch, but no switch software image. Information about
compatible switch software can be found at
www.edge-core.com.
Caution:
and fan tray modules that are installed into its chassis. All
installed modules must have a matching airflow direction.
That is, if the installed power modules have a front-to-back
(F2B) airflow direction, all the installed fan tray modules
must also have a F2B airflow direction.
The switch includes plug-in power supply (PSU)
Use an additional two screws to secure each of the rear-post
brackets at the mid-point on the sides of the switch.
Use the screws and cage nuts supplied with the rack to
secure the switch in the rack.
Caution:
people. One person should position the switch in the rack,
while the other secures it using the rack screws.
装置の吸排気に必要な領域を マニ ュ アル上に規定して
いる。
Installing the switch in a rack requires two
3. Adjust Rear-Post Bracket Ears
Lock the position of the rear-post bracket ears using the
included position-locking screws.
You can also adjust the rear-post bracket ears to fit different
rack depths from 56 cm to 75 cm.
4. Ground the Switch
Note:
The switch drawings in this document are for
illustration only and may not match your particular switch
model.
2. Attach the Brackets
Attach each of the front- and rear-post brackets to the
switch using four of the included bracket screws.
www.edge-core.com
– 1 –
Ensure the rack is properly grounded and in compliance
with ETSI ETS 300 253. Verify that there is a good electrical
connection to the grounding point on the rack (no paint or
isolating surface treatment).
Attach the #14 AWG to the grounding point on the switch
rear panel. Then connect the other end of the wire to rack
ground.
For details on grounding the switch with a 12 VDC PSU in an
Open Rack, refer to the Edgecore ORSA-1U Open Rack Tray
Set Installation Guide.
Caution:
unless all supply connections have been disconnected.
The earth connection must not be removed
E062018-AP-R03
150200001566A
Page 2
2
1
3
123
4
3
2
1
1
3
2
411
1
2
2
1
3
1
2
3
Quick Start Guide
5. Connect Power
Install one or two AC or DC PSUs in the switch.
The switch supports up to two PSUs that must have the
same matching airflow direction as the installed fan tray.
Connect an external AC or DC power source to the PSUs.
Connect the Open Rack tray connector to the 12 VDC PSU
when the switch is installed in an Open Rack.
Caution:
to connect to a DC converter, and a #14 AWG (for -36 VDC to
-72 VDC PSU) or #8 AWG (for 12 VDC PSU) wire to connect to
a DC PSU.
Use a UL/IEC/EN 60950-1 certified power supply
7. Perform Initial System Boot
If the network operating system (NOS) installer is located on
a network server, first connect the RJ-45 Management
(Mgmt) port to the network using 100-ohm Category 5, 5e
or better twisted-pair cable. (Not required if the NOS
installer is located on attached storage.)
Boot the switch. Wait for the ONIE software to locate and
execute the NOS installer, and then wait for the installer to
load the NOS software image.
Subsequent switch boots will bypass ONIE and directly run
the NOS software.
Note:
For switches with ONIE software pre-loaded, refer to
the network operating system (NOS) installer and NOS
documentation for details on software options and set up
for ONIE.
8. Connect Network Cables
Positronic PLA03F7000/AA
-36 – -72 VDC (red wire)
connector
DC Return (black wire)Ground (yellow-green wire)
6. Verify Switch Operation
Verify basic switch operation by checking the system LEDs.
When operating normally, the PSU1/PSU2, Diag, and Fan
LEDs should all be on green.
For the RJ-45 Management por t, connect 100-ohm Category
5, 5e or better twisted-pair cable.
Connect DAC cables to the SFP28/QSFP28 slots. Or first
install SFP28/QSFP28 transceivers and then connect fiber
optic cabling to the transceiver ports.
The following transceivers are supported:
◆
100GBASE-CR4, AOC, SR4, LR4, and PSM4
◆
40GBASE-CR4, SR4, and LR4
◆
25GBASE-CR4, AOC, and SR
◆
10GBASE-CR, SR, and LR
As connections are made, check the port status LEDs to be
sure the links are valid.
For the SFP28 ports:
◆
Green — 25 Gbps mode
◆
Amber — 10 Gbps mode
Each QSFP28 port has four LEDs that indicate valid links in
the following modes:
透過檢查系統 LED,確認交換器的基本運轉情況。 如運
轉正常,PSU1/PSU2、Diag 和風扇 LED 會亮起綠燈。
– 8 –
Page 9
硬體規格
交換器機箱
尺寸
(WxDxH)
重量AS7312-54XS: 9.43 kg (20.78 磅 ),含兩個安裝
溫度操作 : 0°C 至 45°C (32°F 至 123°F)
濕度操作 : 5% 至 95% (無冷凝)
消耗功率AS7312-54XS: 最大 400 瓦
AC PSU
額定功率100–240 VAC, 50-60 Hz, 650 瓦
AC 輸入100–240 VAC, 50-60 Hz, 10–5 A 或 8.2-3.5 A 或
DC 輸出
48 VDC PSU
額定功率48 VDC,650 瓦
DC 輸入
438.4 x 473 x 44 mm (17.26 x 18.62 x 1.73 英吋 )
PSU
AS7316-54XS: 9.6 kg (21.164 磅 ),含兩個安裝
PSU
儲存 : -40°C 至 70°C (-40°F 至 158°F)
AS7316-54XS: 最大 450 瓦
7.8-3.8 A
5 VSB @ 4-2.5 A, 12 VDC @ 54A-52.9 A
36-72 VDC, 25-11 A
DC 輸出
12 VDC PSU (PSU-12V-750)
DC 輸入12 VDC (從開放式機架後方的母線取電)
法規符合性
排放
電磁耐受性
安全性
5 VDC @ 4 A, 12 VDC @ 52.9 A
EN 55032:2015+AC:2016, Class A
EN 61000-3-2:2014, Class A
EN 61000-3-3:2013
CCC (GB9254-2008), Class A
BSMI (CNS13438)
FCC Class A
VCCI Class A
CE Mark
EN 55024:2010+A1:2015
IEC 61000-4-2/3/4/5/6/8/11
UL (CSA 22.2 No 60950-1 & UL60950-1)
CB (IEC/EN60950-1)
CCC (GB4943.1-2011)
BSMI (CNS14336-1)
– 9 –
Loading...
+ hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.