Edge-Core AS5610-52X Quick Start Manual

Quick Start Guide
2
1
1
2
1
2
1
2
1
2
1
2
1
1
48-Port 10G Top-of-Rack Switch
AS5610-52X
1. Unpack the Switch and Check Contents
10G Top-of-Rack Switch AS5610-52X
Rack Mounting Kit—Contains two brackets and eight screws
Grounding Wire (included with DC PSUs only)
Console Cable—RJ-45 to DB-9
Documentation—Quick Start Guide (this document) and Safety and Regulatory Information
Note:
For information on switch software, refer to
www.edge-core.com. Switches with part numbers 5610-52X-D*-******** have
switch software pre-loaded on the switch. Software user documentation can be found at www.edge-core.com.
Switches with part numbers 5610-52X-O-******** have the Open Network Installer Environment software installer pre­loaded on the switch, but no switch software image. Information about compatible switch software can be found at www.edge-core.com.
3. Ground the Switch
Ensure the rack on which the switch is to be mounted is properly grounded and in compliance with ETSI ETS 300 253. Verify that there is a good electrical connection to the grounding point on the rack (no paint or isolating surface treatment).
Attach a lug (not provided with AC PSUs) to an 18 AWG minimum grounding wire (not provided with AC PSUs), and connect it to the grounding point on the switch rear panel. Then connect the other end of the wire to rack ground.
Caution:
unless all supply connections have been disconnected.
The earth connection must not be removed
4. Connect Power
Caution:
fan tray modules that are installed into its chassis. All installed modules must have a matching airflow direction. That is, all modules must have a front-to-back (F2B) airflow direction, or all modules must have a back-to-front (B2F) airflow direction. The airflow direction of PSU and fan tray modules is indicated by labels on the modules.
The switch includes plug-in power supply and
2. Mount the Switch
Attach the brackets to the switch.
Use the screws supplied with the rack to secure the switch in the rack.
Caution:
people. One person should position the switch in the rack, while the other secures it using the rack screws.
装置の吸排気に必要な領域を マニ ュ アル上に規定し て いる。
www.edge-core.com
Installing the switch in a rack requires two
Install one or two universal AC or DC power modules in the switch.
The switch supports up to two PSUs that must have the same matching airflow direction as the installed fan tray.
Connect an external AC or DC power source to the modules.
5. Verify Switch Operation
Verify basic switch operation by checking the system LEDs. When operating normally, the PSU1/PSU2, Diag, and Fan
LEDs should all be on green.
– 1 –
E012016-CS-R02 150200000722A
Quick Start Guide
12312
2
1
1
2
6. Perform Initial Configuration
a. Edgecore DCSS Software
Connect a PC to the switch console port using the included console cable.
Configure the PC’s serial port: 115200 bps, 8 characters, no parity, one stop bit, 8 data bits, and no flow control.
Log in to the command-line interface (CLI) using default settings: User “admin” with no password.
Note:
For information on initial switch configuration, refer
to the Administrator’s Guide.
b. ONIE Installer Software
If the network operating system (NOS) installer is located on a network server, first connect the RJ-45 Management (Mgmt) port to the network using Category 5, 5e or better twisted-pair cable. (Not required if the NOS installer is located on attached storage.)
Boot the switch. Wait for the ONIE software to locate and execute the NOS installer, and then wait for the installer to load the NOS software image.
Subsequent switch boots will bypass ONIE and directly run the NOS software.
Note:
Refer to NOS installer and NOS documentation for
details on software location options and set up for ONIE.
Hardware Specifications
Chassis Specifications
Size (WxDxH) 438.4 x 473 x 43.4 mm (17.26 x 18.62 x 1.71 inches)
Weight 8.395 kg (18.51 lb), with two installed power supply
Temperature Operating: 0° C to 40° C (32° F to 104° F)
Humidity Operating: 5% to 95% (non-condensing)
Power Consumption
AC PSU
Power Rating 100–240 VAC, 50-60 Hz, 400 Watts, hot pluggable
AC Input 100–240 VAC, 50-60 Hz, 6–3 A
DC Output 5 VDC @ 3 A
DC PSU
Power Rating 48 VDC, 400 Watts, hot pluggable
DC Input 36–75 VDC, 16 A maximum
modules
Storage: -40° C to 70° C (-40° F to 158° F)
165 Watts maximum
12 VDC @ 33 A
7. Connect Network Cables
For the RJ-45 Management port, connect 100-ohm Category 5, 5e or better twisted-pair cable.
Connect DAC cables to the SFP+/QSFP+ slots. Or first install SFP+/QSFP+ transceivers and then connect fiber optic cabling to the transceiver ports.
The following transceivers are supported:
40GBASE-CR4
40GBASE-SR4
10GBASE-CR
10GBASE-SR (ET5402-SR)
1000BASE-SX (ET4201-SX)
1000BASE-LX (ET4201-LX)
DC Output 5 VDC @ 0.5 A
12 VDC @ 33 A
Regulatory Compliances
Emissions EN 55022:2010, Class A
EN 61000-3-2:2009, Class A EN 61000-3-3:2008 FCC Class A VCCI Class A CE Mark
Immunity EN 55024:2010
IEC 61000-4-2/3/4/5/6/8/11
Safety UL (CSA 22.2 No 60950-1 & UL60950-1)
CB (IEC/EN60950-1) CCC ( GB4943.1-2011 & GB9254-2008 )
Note:
As connections are made, check the port status LEDs
to be sure the links are valid.
– 2 –
Loading...