Quick Start Guide
48-Port 10G Top-of-Rack Switch
AS5610-52X
1. Unpack the Switch and Check Contents
10G Top-of-Rack Switch
AS5610-52X
Rack Mounting Kit—Contains two brackets and eight
screws
Grounding Wire (included with DC PSUs only)
Power Cord—either Japan, US, Continental Europe
or UK (included with AC PSUs only)
Console Cable—RJ-45 to DB-9
Documentation—Quick Start Guide (this document)
and Safety and Regulatory Information
Note:
For information on switch software, refer to
www.edge-core.com.
Switches with part numbers 5610-52X-D*-******** have
switch software pre-loaded on the switch. Software user
documentation can be found at www.edge-core.com.
Switches with part numbers 5610-52X-O-******** have the
Open Network Installer Environment software installer preloaded on the switch, but no switch software image.
Information about compatible switch software can be
found at www.edge-core.com.
3. Ground the Switch
Ensure the rack on which the switch is to be mounted is
properly grounded and in compliance with ETSI ETS 300 253.
Verify that there is a good electrical connection to the
grounding point on the rack (no paint or isolating surface
treatment).
Attach a lug (not provided with AC PSUs) to an 18 AWG
minimum grounding wire (not provided with AC PSUs), and
connect it to the grounding point on the switch rear panel.
Then connect the other end of the wire to rack ground.
Caution:
unless all supply connections have been disconnected.
The earth connection must not be removed
4. Connect Power
Caution:
fan tray modules that are installed into its chassis. All
installed modules must have a matching airflow direction.
That is, all modules must have a front-to-back (F2B) airflow
direction, or all modules must have a back-to-front (B2F)
airflow direction. The airflow direction of PSU and fan tray
modules is indicated by labels on the modules.
The switch includes plug-in power supply and
2. Mount the Switch
Attach the brackets to the switch.
Use the screws supplied with the rack to secure the switch in
the rack.
Caution:
people. One person should position the switch in the rack,
while the other secures it using the rack screws.
装置の吸排気に必要な領域を マニ ュ アル上に規定し て
いる。
www.edge-core.com
Installing the switch in a rack requires two
Install one or two universal AC or DC power modules in the
switch.
The switch supports up to two PSUs that must have the
same matching airflow direction as the installed fan tray.
Connect an external AC or DC power source to the modules.
5. Verify Switch Operation
Verify basic switch operation by checking the system LEDs.
When operating normally, the PSU1/PSU2, Diag, and Fan
LEDs should all be on green.
– 1 –
E012016-CS-R02
150200000722A

Quick Start Guide
6. Perform Initial Configuration
a. Edgecore DCSS Software
Connect a PC to the switch console port using the included
console cable.
Configure the PC’s serial port: 115200 bps, 8 characters, no
parity, one stop bit, 8 data bits, and no flow control.
Log in to the command-line interface (CLI) using default
settings: User “admin” with no password.
Note:
For information on initial switch configuration, refer
to the Administrator’s Guide.
b. ONIE Installer Software
If the network operating system (NOS) installer is located on
a network server, first connect the RJ-45 Management
(Mgmt) port to the network using Category 5, 5e or better
twisted-pair cable. (Not required if the NOS installer is
located on attached storage.)
Boot the switch. Wait for the ONIE software to locate and
execute the NOS installer, and then wait for the installer to
load the NOS software image.
Subsequent switch boots will bypass ONIE and directly run
the NOS software.
Note:
Refer to NOS installer and NOS documentation for
details on software location options and set up for ONIE.
Hardware Specifications
Chassis Specifications
Size (WxDxH) 438.4 x 473 x 43.4 mm (17.26 x 18.62 x 1.71 inches)
Weight 8.395 kg (18.51 lb), with two installed power supply
Temperature Operating: 0° C to 40° C (32° F to 104° F)
Humidity Operating: 5% to 95% (non-condensing)
Power
Consumption
AC PSU
Power Rating 100–240 VAC, 50-60 Hz, 400 Watts, hot pluggable
AC Input 100–240 VAC, 50-60 Hz, 6–3 A
DC Output 5 VDC @ 3 A
DC PSU
Power Rating 48 VDC, 400 Watts, hot pluggable
DC Input 36–75 VDC, 16 A maximum
modules
Storage: -40° C to 70° C (-40° F to 158° F)
165 Watts maximum
12 VDC @ 33 A
7. Connect Network Cables
For the RJ-45 Management port, connect 100-ohm Category
5, 5e or better twisted-pair cable.
Connect DAC cables to the SFP+/QSFP+ slots. Or first install
SFP+/QSFP+ transceivers and then connect fiber optic
cabling to the transceiver ports.
The following transceivers are supported:
◆
40GBASE-CR4
◆
40GBASE-SR4
◆
10GBASE-CR
◆
10GBASE-SR (ET5402-SR)
◆
1000BASE-SX (ET4201-SX)
◆
1000BASE-LX (ET4201-LX)
DC Output 5 VDC @ 0.5 A
12 VDC @ 33 A
Regulatory Compliances
Emissions EN 55022:2010, Class A
EN 61000-3-2:2009, Class A
EN 61000-3-3:2008
FCC Class A
VCCI Class A
CE Mark
Immunity EN 55024:2010
IEC 61000-4-2/3/4/5/6/8/11
Safety UL (CSA 22.2 No 60950-1 & UL60950-1)
CB (IEC/EN60950-1)
CCC ( GB4943.1-2011 & GB9254-2008 )
Note:
As connections are made, check the port status LEDs
to be sure the links are valid.
– 2 –