Raised Basin Mixer
Components List
EB_FM001V
Installation Instruction
Please read this instruction carefully to avoid any
difficulty during installation.
N o .
1
2
3
4
5
6
7
8
9
10
11
12
14
15
16
17
18
19
20
21
22
23
24
25
26
Component
Decorating cover
Female allen screw
O-ring
Union
Flow rate controller
Main body
O-ring
Setting pin
Stopper
Flexible connection hose (red)
Flexible connection hose (blue)
Longer pipe
Bolt
Thread pipe
Washer
Fastening washer
Rubber washer
Fastening nut
Cross-head screw
Fastening washer
Fastening nut
Ceramic head part
Fastening screw
Union
Handle
Quantity
1
5
1
1
1
1
1
2
1
1
1
1
1
1
1
1
1
1
2
1
1
1
1
1
1
Installation Step
Installation Fig
22
11
44
33
9/16-24 UNEF
Flow rate Curves
L/minL/min
3535
3030
2525
2020
1515
1010
55
00
0.50.5
1.51.5
11
22
2.52.5
33003.5 3.5 44
4.54.5 55
Test pressure:
1.6MPa (16bar)
Flow pressure:
0.05MPa
Min
1.60MPa
Max
Recommended pressure:
BarBar
0.1MPa to 0.8MPa (1 to 8 bar)
Note
1.Ensure proper cleaning of the water supply pipe before
installation to avoid any jammed.
2.The cold-water supply must be connected on the right and
the hot-water supply must be connected to the left.
3.Check the installation dimensions according to the Figure and
ensure it is installed correctly.
4.Hot-water inlet temperature must not be over 80 C.
o