Eden Bath EBFM001VBN Installation Manual

Raised Basin Mixer
Components List
EB_FM001V
Installation Instruction
Please read this instruction carefully to avoid any difficulty during installation.
N o .
1
2
3
4
5
6
7
8
9
10
11
12
14
15
16
17
18
19
20
21
22
23
24
25
26
Component
Decorating cover Female allen screw O-ring Union Flow rate controller Main body O-ring Setting pin Stopper Flexible connection hose (red) Flexible connection hose (blue) Longer pipe
Bolt Thread pipe Washer Fastening washer Rubber washer Fastening nut Cross-head screw Fastening washer Fastening nut Ceramic head part Fastening screw Union Handle
Quantity
Installation Step
Installation Fig
22
11
44
33
9/16-24 UNEF
Flow rate Curves
L/minL/min
3535
3030
2525
2020
1515
1010
55
00
0.50.5
1.51.5
11
22
2.52.5
33003.5 3.5 44
4.54.5 55
Test pressure:
1.6MPa (16bar)
Flow pressure:
0.05MPa
Min
1.60MPa
Max
Recommended pressure:
BarBar
0.1MPa to 0.8MPa (1 to 8 bar)
Note
1.Ensure proper cleaning of the water supply pipe before installation to avoid any jammed.
2.The cold-water supply must be connected on the right and the hot-water supply must be connected to the left.
3.Check the installation dimensions according to the Figure and ensure it is installed correctly.
4.Hot-water inlet temperature must not be over 80 C.
o
Loading...