Eden Bath EBFC005WBN Installation Manual

Wall mounted basin mixer
EB_FC005W
Installation Instruction
Please read this instruction carefully to avoid any difficulty during installation.
N o .
01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Components List
Plastic sleeve Main body Cross-head screw O-ring Sealing strip Plate Cover Ceramic cartridge Cross-head screw Cartridge fastener Cap Handle cover Female allen screw Index Handle Safe cover for main body Safe cover for diverter Aerator core Flat washer Spout Plate Sealing strip O-ring Stopper
Quantity
3 1 3 1 1 1 1 1 3 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Installation Step
Installation Fig
5
2
6
7
1
3
4
See the fig for the position of the valve and inlet pipes.
Test:
Open the supply pipes, close the ceramic cartridge and check any leakage; open the ceramic cartridge and check the smooth water flow. Having tested, install the valve to the wall, take the safe cover apart and install the plate and handle.
1/2-14NPT
1/2-14NPT
Flow rate Curves
L/minL/min
30 30
2525
2020
1515
1010
5 5
00
11 1.51.5 22 2.52.5
0.50.5
3.53.5
33
Test pressure:
1.6MPa (16bar)
Flow pressure:
0.05MPa
Min
1.60MPa
Max
BarBar
Recommended pressure:
0.1MPa to 0.8MPa (1 to 8 bar)
Note
1.Ensure proper cleaning of the water supply pipe before installation to avoid any jammed.
2.The cold-water supply must be connected on the right and the hot-water supply must be connected to the left.
3.Check the installation dimensions according to the Figure and ensure it is installed correctly.
4.Hot-water inlet temperature must not be over 80 C.
o
Loading...