Edelbrock 66252, 66253 User Manual

Catalog #66252, #66253 ©2006 Edelbrock Corporation
Page 1 of 3
Brochure #63-66252
Rev. 8/06 - DA/mc
TUBULAR EXHAUST SYSTEM
Applications: See Below
Catalog #66252, #66253
Please study these instructions carefully before installing your new
Tubular Exhaust System
(TES). If you have any questions, please contact our Technical Hotline at : 1-800-416-8628 from 7 am - 5pm, Monday-Friday, Pacific Standard Time or e-mail us at Edelbrock@Edelbrock.com
.
APPLICATIONS: For 1998-1999 GM Tahoe,Yukon, Escalade 1500 Series, Suburban, and Pick-up, 5.7L-V8 Auto & Standard Transmission, 2 & 4 WD with A.I.R. Dual catalytic.
TUBULAR EXHAUST SYSTEM: These components are designed to improve the exhaust efficiency of the GM C.P.I. (Central Port Injection) V8 engine. A performance gain can be expected by the installation of the system. This system does
require welding for installation and retains all O.E.M. emissions equipment.
Suggested Tools Needed for Installation: This vehicle has metric fasteners.
Mig welder (recommended) or gas welder—Professional welding is highly recommended3/8” ratchet socket set with extensions and universal 13mm and 15mm swivel socketsCombination set of open-end wrenchesJackstands, screwdrivers, pliers, crescent wrench, etc.Hacksaw or Sawz-allLiquid penetrant, (GM #1052627) anti-seize compound (GM #5613695)
NOTE: Some models will require a special power steering pulley puller, K-D 2897 or equivalent
SPECIAL NOTICE: This Edelbrock Tubular Exhaust System has received an Executive Order number (E.O.#) from the
California Air Resources Board (C.A.R.B.) making it legal for street use in all 50 states. To assist you with emission equipment certification, we have included a silver fan shroud decal to help testing personnel verify the this part is a legal replacement on the vehicle for which it is cataloged. The adhesive-backed decal should be affixed next to the existing emission and engine specifications decal. Do not cover any part of your original emission decal.
WARNING: The use of "Thermal Wrap" or any aftermarket coating process will void the warranty
on your Edelbrock Tubular Exhaust Systems. Those products can cause excessive heat and moisture buildup resulting in corrosion and failure of the system.
NOTE: High temperature spark plug wires and boots are recommended to withstand heat from T.E.S.
IMPORTANT NOTE:
Proper installation is the responsibility of the installer. Improper installation will void warranty and may
result in poor performance and engine or vehicle damage.
KIT CONTENTS
Catalog #66252 (Ceramic-Coated), #66253 (Ti-Tech Coated)
Qty. Description
1 Header left side #25-9458 (#66252)1 Header right side #25-9457 (#66252)
1 Header left side #25-9136 (#66253)1 Header right side #25-9137 (#66253)
1 Extension pipe left #25-96531 Extension pipe right #25-96541 4x4 Extension pipe (left) #25-9655
Qty. Description
12 Hex header bolts; 3/8” - 16 x 1”2 Chevrolet V8 port gaskets2 Donut gaskets; 2-1/4”4 Hex capscrews; 3/8” x 2”16 Lock washers; 3/8”4 Flat washers; 3/8”
Catalog #66252, #66253 ©2006 Edelbrock Corporation
Page 2 of 3
Brochure #63-66252
Rev. 8/06 - DA/mc
DISASSEMBLY
1. Disconnect negative battery cable.
2. Raise vehicle and remove front two O2 sensors, being careful not to damage. NOTE: Before cutting exhaust pipes from catalytic converter on both sides, determine the position of catalytic inlet for re-installation. Use chalk line on bottom of floorboard to show position of catalytic and measure height from floorboard.
3. For 2-wheel drive, not 4-wheel drive, cut both exhaust pipes 1/2" in front of weld on catalytic converters
(See Fig. 1).
4. Unbolt and remove exhaust pipes from exhaust manifolds.
5. For 4-wheel drive , unbolt unit from car without cutting pipes and set aside.
INSTALLATION INSTRUCTIONS
RIGHT SIDE
1. Disconnect and remove air intake assembly.
2. Disconnect and remove spark plugs.
3. Disconnect A.I.R. injection assembly.
4. Unbolt dipstick tube.
5. Unbolt and remove manifold.
6. Install T.E.S. flange gasket and TES manifold form top. Install header bolts supplied and leave loose enough to ensure proper alignment. NOTE: Use flat washers at slotted ends and lock washers on all bolts.
7. Re-install spark plugs and wires.
8. Re-fasten dipstick tube.
9. Re-install air intake assembly.
LEFT SIDE
1. Disconnect and remove spark plugs.
2. Disconnect A.I.R. injection assembly.
3. Unplug temperature sensor wire.
4. Unscrew E.G.R. hose from manifold.
5. Unbolt and remove manifold. NOTE: Unscrew stock E.G.R. adapter form manifold and place it in T.E.S. header before installing.
6. Install T.E.S. flange gasket and T.E.S. manifold from top. Install header bolts supplied and leave loose enough to ensure proper alignment. Tighten all bolts.
7. Re-attach E.G.R. hose.
8. Re-install spark plugs and wires.
9. Connect temperature sensor wire.
10. Connect A.I.R. injection assembly.
Cut O.E.M. pipe approximately 1/2”
in front of catalytic converter
Fig. 1
Loading...
+ 1 hidden pages