ECR 075 97gb, 100 97gb Installation, Operation & Maintenance Manual

Page 1
CONDENSING
GAS BOILER
Models 075 & 100
GAS BOILER
INSTALLATION, OPERATION &
MAINTENANCE MANUAL
An ISO 9001-2008 Certied Company
ECR International, Inc.
2201 Dwyer Ave
Utica, NY 13501
P/N # 240008282, REV J [03/2014]
Page 2
VERIFY CONTENTS RECEIVED
Description
No. Illustration
Item
Fully Assembled Boiler 1
Metal Wall Bracket 2
Lag Bolt, 3/8" x 3" Hex (4 ea) 3
*Safety Relief Valve 4
3/4" Elbow 90° 5
3/4" Close Nipple 6
2
3
4
9
3/4" F x 3/4" M NPT Tee 7
3/4" x 1/4" NPT 90° Elbow 8
5
6
7
Air Vent 9
**Temperature Pressure Gauge 10
Bushing 3/4" x 1/4" 11
13
12
10
11
3/4" Tee (Same as No. 11) 12
Nipple 1¼ x 5½ 13
Drain Valve, 3/4" 14
14
3/4" Tee 15
16
15
Nipple 1¼ x 5½ 16
Bushing 7/8" OD, Heyco (2 ea) 17
Used for electrical wire knockouts.
Outdoor Sensor 18 Used for measuring outside temperature.
Stopper, Rubber 5/16" (2 ea) 17
Plastic Plug (2 ea) 18
Outdoor Sensor 19
Used for packaging holes on back of boiler.
Used for packaging holes on back of boiler.
Used for measuring outside temperature.
Document Package 20 Includes essential documents.
8
* Boiler provided with 30 psig (206 kpa) safety relief valve. Field source safety relief valve if system pressure greater
than 25 psig.
** Boiler provided with 75 psig temperature pressure gauge. Field source temperature pressure gauge if system
pressure greater than 60 psig.
2
Page 3
FIGURE 1-1 Dimensions
DIMENSIONS
(D)
Wall Hanging
Bracket
(D)
(B)
Vent Connection
Supply Water
Gas
Connection
(G)
(F)
Floor
(E)
Combustion Air
Return Water
(E)
User Interface
(A)
(B)
Size
075
/100
Width
(A)
22-1/16"
(560mm)
(H)
(I)
Condensate
Drain
Height
(B)
35-5/8"
(905mm)
Alternate Gas
Connection
Alternate
Supply Water
Depth
(C)
16-3/16"
(411mm)
(F)
(E)
Bracket
(D)
27-1/2"
(969mm)
(C)
Table 1 : Physical Data
Water Connections
Size
(E)
1-1/4"
NPT
Height
(F)
31-1/16" (789mm)
Gas
Connection
(G)
1/2" NPT 7-1/2" 5"
Alternate
Return Water
(E)
Condensate Drain
(H) (I)
Weight
Shipping Unit
140 lb
(63.5 kg)
115 lb
(51.2 kg)
3
Page 4
TABLE OF CONTENTS
1 - Introduction ............................................................................................................................... 5
2 - Important Safety Information .................................................................................................... 6
3 - Component Listing ..................................................................................................................... 7
4 - Locating Boiler ......................................................................................................................... 11
5 - Hydronic Piping ........................................................................................................................ 13
5.2 Special Conditions ................. .................................................................................................13
5.3 Safety Relief Valve And Air Vent.................................................................................................13
5.4 Trim Piping ............................................................................................................................ 14
5.5 System Piping ........................................................................................................................ 14
6 - Combustion Air And Vent Piping ............................................................................................... 19
6.2 Removal Of Existing Boiler From Common Vent System.................................................................19
6.3 Venting Materials ................................................................................................................... 19
6.4 Pipe Installation ..................................................................................................................... 20
6.5 Termination ........................................................................................................................... 20
6.7 Venting Congurations ............................................................................................................ 21
6.8 Side Venting Terminal Requirements..............................................................................................26
6.9 Condensate Piping .................................................................................................................. 28
7 - Gas Supply Piping .................................................................................................................... 29
8 - Electrical Connections .............................................................................................................. 31
8.2 Line Voltage Connections ......................................................................................................... 31
8.3 External Connections .............................................................................................................. 31
9 - Start Up Procedure ................................................................................................................... 33
9.6 Perform Csd-1 Compliance Test..................................................................................................37
9.7 Complete Start Up Procedure.....................................................................................................
10 - Operating Instructions ........................................................................................................... 39
11 - General Maintenance And Cleaning ........................................................................................ 40
12 - Ratings And Capacities ........................................................................................................... 43
13 - Trouble Shooting .................................................................................................................... 44
14 - Wiring Diagram ...................................................................................................................... 61
15 - Glossary ................................................................................................................................. 63
38
Appendix A - Control Module ������������������������������������������������������������������������������������������� 65
1.1 Introduction .......................................................................................................................... 65
1.2 Operation .............................................................................................................................. 65
1.3 Status Indication .................................................................................................................... 65
1.4 Sequence Of Operation ........................................................................................................... 66
1.5 User Menu ............................................................................................................................. 68
4
Page 5
1 - INTRODUCTION
1.1 Designated Use
• Hot water heating boiler.
• Indoor installation.
• Closet or alcove installation.
• Direct vent boiler.
• For use with natural gas or liqueed petroleum gases
(LP/propane).
1.2 The unit MUST NOT:
• Directly heat potable water. Indirect heating is acceptable.
• Heat water with non-hydronic heating system chemicals
present (example, swimming pool water).
• Exceed 150 psig (1.03 MPa) system pressure.
• Exceed 195°F (90.5°C) system design temperature.
1.3 Operational Features
• Modulating: 20-100%.
• Integral Dual Limit.
• Integral Low Water Cutoff (with test button).
• Outdoor Temperature Reset.
• Integral Multiple Boiler Control.
• Heat exchanger over heat protection.
Information and specications outlined in this manual in effect at the
time of printing of this manual. ECR International reserves the right to
discontinue, change specications or system design at any time without
notice and without incurring any obligation, whatsoever.
Check our website frequently for updates: www.ecrinternational.com
5
Page 6
2 - IMPORTANT SAFETY INFORMATION
2.1 General
Boiler installation shall be completed by qualied agency.
See glossary for additional information.
WARNING
!
Fire, explosion, asphyxiation and electrical shock hazard. Improper installation could result in death or serious injury. Read this manual and understand all requirements before beginning installation.
2.2 Become familiar with symbols identifying potential hazards�
This is the safety alert symbol. Symbol alerts you to potential personal injury hazards. Obey all safety messages following this symbol to avoid possible injury or death.
!
DANGER
Indicates a hazardous situation which, if not avoided, WILL result in death or serious injury
2.3 Installation shall conform to requirements of authority having jurisdiction or in absence of such requirements:
•
United States
• National Fuel Gas Code, ANSI Z223.1/NFPA 54
• National Electrical Code, NFPA 70.
• Canada
• Natural Gas and Propane Installation Code,
CAN/CSA B149.1.
• Canadian Electrical Code, Part I, Safety Standard for Electrical Installations, CSA C22.1
2.4 Where required by authority having jurisdiction,
installation shall conform to Standard for Controls and Safety Devices for Automatically Fired Boilers, ANSI/ASME CSD-1�
Additional manual reset low water cutoff may be required.
2.5 Requirements for Commonwealth of Massachusetts:
Boiler installation must conform to Commonwealth of Massachusetts code 248 CMR which includes but is not limited to:
• Installation by licensed plumber or gas tter.
.
!
WARNING
Indicates a hazardous situation which, if not avoided, could result in death or serious injury.
!
CAUTION
Indicates a hazardous situation which, if not avoided, could result in minor or moderate injury.
NOTICE
Used to address practices not related to personal injury.
6
Page 7
3 - COMPONENT LISTING
3.1 Component Listing
1.
User Interface - Displays information regarding boiler condition. Allows adjustment of boiler operating parameters. NOTE: Does not replace thermostat used to control central heating space.
2.
Combustion Air Inlet (2" PVC) (see Section 6)
3.
Return Water From Heating System (In) 1-1/4" NPT - Connections supplied to connection top and/or
bottom of boiler. See Section 5.
4.
Low Voltage Terminal Strip Connection of all low voltage wiring, including thermostat. See section 8.
5.
Igniter
6.
Flame Sensor
7.
Sight Glass Permits observation of burner ame.
8.
Burner
9.
Heat Exchanger
10.
Condensate Collector
21.
Supply Water Temperature Sensor and High Limit Switch
22.
Low Water Cutoff Senses inadequate quantity of water. Turns off boiler before damage can occur.
23.
Safety Relief Valve Factory supplied, Field installed. See section 5.
24.
High Voltage Junction Box For connection of 120V components. See section 8.
25.
Vent Connector See section 6.
26.
Gas Connection (See section 7.
27.
Wall Hanging Support Bracket (see page 7) - Integral to boiler. Allows optional wall mounting when used with supplied wall mounting bracket. See section 4.
28.
Auxiliary Power Outlet Convenience outlet for condensate pump or service. Controlled by Service Switch (29)
29.
Service Switch
30.
Air Vent
11.
Return Water Temperature Sensor
12.
Drain Valve
13.
Heat Exchanger Ball Valve
14.
Supply Water Outlet to Heating System (Out) 1-1/4"NPT Connections supplied for connecting from
either top or bottom of boiler. See section 5.
15.
Vent Temperature Sensor
16.
Condensate Drain) Boiler produces a liquid (condensate) as a by-product of combustion. Condensate must be piped to appropriate drain. See section 6.
17.
Heat Exchanger Pump
18.
Gas Shutoff Valve - Fuel supply isolation during servicing. See section 7
19.
Combustion Air Blower Delivers proper quantity of combustion air, receives fuel from gas valve, mixes air and fuel sending mixture to burner for combustion.
31.
Central Heating Pump Circuit Breaker 5 amp circuit breaker protects control module.
32.
Boiler Control Module
33.
Internal Access Panel (see page 9) - Gently pull upward then forward to access control module. Removable for access to internal components of boiler.
34.
Central Heating Pump Relay (see page 9)
35.
Transformer Supplies 24V power to low water cutoff.
36.
Air Pressure Switch (not shown)
37.
Test Port - (see page 8)
38.
Combustion Analysis Test Port - (see page 8)
20.
Gas (Control) Valve Delivers proper quantity of fuel to Combustion Air Blower. See section 7.
7
Page 8
FIGURE 3-1 Boiler Components
(4) LOW VOLTAGE
TERMINAL
STRIP
(2) COMBUSTION
AIR INLET- 2" PVC
3 - COMPONENT LISTING
(25) VENT
CONNECTOR - 2" PVC
(24) HIGH
VOLTAGE
JUNCTION BOX
(23)
SAFETY
RELIEF
VALVE
(30) AIR
VENT
(3) RETURN WATER
FROM HEATING
SYSTEM (IN)
(27) BRACKET FOR
OPTIONAL WALL MOUNT
(14) SUPPLY WATER TO
HEATING SYSTEM (OUT)
NOTE:
See Section 5-3
For Safety Relief
Valve Piping Instructions
(26) GAS
CONNECTION
(29) SERVICE
SWITCH
(28) AUXILIARY
POWER OUTLET
(31) CENTRAL HEATING
PUMP CIRCUIT BREAKER
8
Page 9
FIGURE 3-2 Boiler Components
(24) HIGH VOLTAGE
JUNCTION BOX
(25) VENT CONNECTOR
(2" PVC)
(23) SAFETY
RELIEF VALVE
NOTE:
See Section 5
For Piping
Instructions
(22) LOW
WATER CUTOFF
(21) HIGH
TEMPERATURE
SUPPLY SWITCH
(20) GAS
(CONTROL)
VALVE
3 - COMPONENT LISTING
(1) USER INTERFACE
(3) RETURN
WATER FROM
HEATING SYSTEM
(IN) 1-1/4" NPT
(4) LOW
VOLTAGE
TERMINAL
STRIP
(5)
IGNITER
(6) FLAME
SENSOR
(7) SIGHT
GLASS
(19)
COMBUSTION
AIR
BLOWER
(18) GAS
SHUTOFF VALVE
(SHOWN IN OPEN
POSITION)
(38)
COMBUSTION
ANALYSIS TEST
PORT
(13) HEAT
EXCHANGER PUMP
(16)
CONDENSATE
DRAIN 1/2" PVC
(15) VENT
TEMPERATURE
SENSOR
(37)
PRESSURE
TEST PORT
(9) HEAT
EXCHANGER
(10)
CONDENSATE
COLLECTOR
(14) SUPPLY WATER
TO
HEATING SYSTEM
(OUT) 1-1/4" NPT
(13) HEAT EXCHANGER BALL VALVE
(12) DRAIN
VALVE
9
(11) RETURN
TEMPERATURE
SENSOR
(3)
RETURN WATER
FROM HEATING
SYSTEM (IN)
1-1/4" NPT
Page 10
Note: To open
Lift panel up
then pull forward
3 - COMPONENT LISTING
(33) INTERNAL ACCESS
PANEL - CLOSED
(32) CONTROL
MODULE
(33) INTERNAL ACCESS
PANEL - OPEN
(34) CENTRAL HEATING
PUMP RELAY
Control Module Fuse and holder
(35)TRANSFORMER
10
Page 11
4 - LOCATING BOILER
4.1 Boiler Location Considerations
• Ambient room temperature always above 32°F (0°C) to prevent freezing of liquid condensate.
• Approved for installation in closets and on combustible oors. Do not install boiler on carpeting.
• Protection of gas ignition system components from
water (dripping, spraying, rain, etc.) during operation and service (circulator replacement, condensate trap, control replacement, etc.).
• Floor or wall mounting.
• Wall must be plumb and capable of supporting boiler
weight plus 60 lbs (28 kg). See Table 1.
• Floor must be level. Leveling feet allow adjustment up to 1/4" (6 mm).
• Wall mounting. See section 4.3.
• Access to outdoors to meet minimum and maximum
pipe lengths for combustion air and vent piping. See section 6.
• Disposal of condensate. See section 6.
TABLE 2: BOILER CLEARANCES
Dimension
Top (A)
Left Side (B)
Right Side (C)
Front (D)
Back (E)
Bottom (F)
Combustion Air/Vent piping
Hot Water Piping
(1)
Required distances measured from boiler.
(2)
Service, proper operation clearance recommendation.
Combustible
Materials
0" (0 cm) 14" (36 cm)
6" (16 cm) 6" (16 cm)
0" (0 cm) 1½" (4 cm)
0" (0 cm) 6" (16 cm)
0" (0 cm) 0" (0 cm)
0" (0 cm)
0" (0 cm) 6" (16 cm)
See local code 6" (16 cm)
(1)
Service
0" (0 cm) Floor
12" (32 cm) for
Bottom Piped
(1)(2)
• Drainage of water (or water - antifreeze solution) during boiler service or from safety relief valve discharge. See section 5.
• Access to system water piping, gas supply, and electrical service. See sections 5, 7 and 8.
• Clearances to combustible materials and service clearances. See Table 2 and gure 4-1.
• Multiple Boilers can be placed side by side, back to back
or wall mounted.
FIGURE 4-1 Clearance to Combustible Materials
A
E
B
A
A
C
E
FLOOR FLOOR
D
11
B
C
Page 12
4 - LOCATING BOILER
FIGURE 4-2 Wall Mount Bracket Engaged with
Bracket on Boiler
Center brackets. Avoid
overhang on sides of wall
mount bracket.
4 Slots for attaching Wall
Mount Bracket to Studs
4.2 Pre-pipe supply and return water connections
with factory ttings before wall mounting.
4.3 Wall Mounting
Mount boiler on wall using wall mounting bracket included with unit.
• Structure must be capable of supporting boiler weight plus 60 lbs (28 kg). See Table 1, page 2.
• Wall mount bracket has 4 slots allowing mounting on two (2) wall studs spaced at 11½" to 16½" on center.
See gure 4-2.
• Boiler includes (4) 3/8" x 3" lag screws and (4) washers
for attaching wall mount bracket to wood studs. Field source appropriate fasteners for other wall constructions (masonry, concrete).
• Attach wall mount bracket level on wall.
• Boiler must engage with wall mount bracket.
• Avoid overhang on sides of wall mount bracket. Verify boiler bracket is centered on wall bracket. See gure
4-2.
!
WARNING
Fire, explosion hazard. Mount boiler vertically or slightly tilted backward to insure proper function of low water cutoff. Failure to follow these instructions could result in death or serious injury.
FIGURE 4-3 Low Water Cutoff Orientation
5° ~ 15°
Factory Default 10°
• When mounting boiler onto wall insert two plastic stoppers and two plastic plugs to packaging holes on back of boiler.
• Mount boiler vertically or slightly tilted backward to insure the low water cutoff functions properly. See
gure 4-3 for low water cutoff orientation.
!
CAUTION
Boiler weight exceeds 115 pounds (51.2 kg). Do not lift boiler onto wall without assistance.
NOTICE
Lift boiler using chassis. Using front jacket, vent
piping, water or gas ttings to lift boiler may cause
damage to the boiler.
12
Page 13
5 - HYDRONIC PIPING
5.1 General
• Install piping in accordance with authority having jurisdiction.
NOTICE
Use two (2) wrenches when tightening and tting to pipe boiler's threaded ttings. Boiler's internal
piping can be damaged if subjected to excessive torque.
• Support system piping and safety relief valve discharge piping. Boiler's internal piping and wall mount bracket can be damaged if subjected to excessive weight.
• Size central heating pump (and domestic hot water pump, if used) for system requirements only. Heat exchanger pump compensates for pressure drop through boiler internal piping and heat exchanger.
• Thoroughly clean and ush system before connecting to
boiler.
• If oil is present in system water, use approved detergent to wash system.
• Flush system to remove any solid objects such as metal chips, bers, or Teon tape, etc.
5.2 Special Conditions
• System piping exposed to freezing conditions: Use inhibited proplyene glycol solutions certied by uid
manufacturer for use with closed water heating system. Do not use automotive or ethylene glycol.
• Boiler installed above radiation level (or as required by authority having jurisdiction). Integral low water cutoff provided in boiler. See pages 7 & 9.
• Boiler used in connection with refrigeration system. Install piping in parallel with boiler, with appropriate valves to prevent chilled medium from entering boiler.
• System piping connected to heating coils located in air handling unit exposed to refrigerated air circulation. Install
ow control valves or other automatic means to prevent
gravity circulation of boiler water during cooling cycle.
!
WARNING
• Poison hazard. Ethylene glycol is toxic. Do not use ethylene glycol.
• Never use automotive or standard glycol antifreeze, even ethylene glycol made for hydronic systems.
• Ethylene glycol can attack gaskets and seals used in hydronic systems.
• Use only inhibited proplyene glycol solutions certied by uid manufacturer as acceptable for
use with closed water heating system.
• Thoroughly clean and ush any system that used
glycol before installing new Boiler.
• Provide user with Material Safety Data Sheet (MSDS) on uid used.
NOTICE
Do not expose boiler and condensate piping to freezing temperatures.
FIGURE 5-1 Safety Relief Valve & Air Vent
Safety Relief
Valve
3/4" NPT
90° Elbow
Air Vent
3/4 NPT
5.3 Safety Relief Valve and Air Vent
NOTICE
Boiler rated at 150 psig (1.03 MPa) maximum allowable working pressure. Boiler provided with 30 psig (206 kPa) safety relief valve. Field source safety relief valve for system pressures greater than 25 psig. Temperature Pressure Gauge satisfactory for 60 psig operation. Field source temperature pressure gauge for system pressures greater than 60 psig.
• Install safety relief valve and air vent using pipe ttings provided with boiler. See gure 5-1
• Install safety relief valve with spindle in vertical position.
• Do not install shutoff valve between boiler and safety
relief valve.
3/4" NPT
Close Nipple
3/4"F x 3/4"M
NPT Tee
3/4" x 1/4" NPT
90° Elbow
13
Page 14
5 - HYDRONIC PIPING
To use this format set your tiff output to
Print capture, 150dpi, C -Landscape, Scale to fit
for best results
!
WARNING
Burn and scald hazard. Safety relief valve could discharge steam or hot water during operation. Install discharge piping per these instructions.
FIGURE 5-2 Safety Relief Valve Discharge Piping
Check Local Codes
For Maximum
Distance To Floor
• Systems with automatic ll valves require back ow
prevention device.
• Install discharge piping from safety relief valve. See gure 5-2.
• Use ¾" or larger pipe.
• Use pipe suitable for temperatures of 375°F (191°C)
or greater.
• Individual boiler discharge piping shall be independent of other discharge piping.
• Size and arrange discharge piping to avoid reducing safety relief valve relieving capacity below minimum relief valve capacity stated on rating plate.
• Run pipe as short and straight as possible to location protecting user from scalding and properly drain piping.
• Install union, if used, close to safety relief valve outlet.
• Install elbow(s), if used, close to safety relief valve
outlet and downstream of union (if used).
• Terminate pipe with plain end (not threaded).
5.4 Trim Piping
• Supply and Return Piping
• Supply - Select either top, bottom or both.
• Return - Select either top, bottom, or both.
• Use second temperature pressure gauge when piping
top and bottom.
• Install brass plug(s) provided with boiler in unused tapping(s). Use provided sealant.
• Temperature - Pressure Gauge. Install temperature pressure gauge using nipple, bushing and tee provided
with boiler. See gure 5-3.
5.5 System Piping
• See Table 3 for basic system piping congurations.
FIGURE 5-3 Temperature Pressure Gauge Installation
Temperature Pressure Gauge
shown at Optional Bottom
Supply Connection to Boiler
• Systems with automatic ll valves require back ow
• Single boiler system. See gures 5-4, 5-5, 5-6, 5-7
• Multiple boiler system.
• Heating system with existing primary loop, close internal
• Heating system without existing primary loop, leave internal
prevention device.
for
general guidance. Additional considerations:
• Boiler control is designed for single central heating pump. Installer responsible for integration of multiple central heating pumps.
• Boiler control allows domestic hot water pri ori tiz ation. Function could be lost if central heating pump not directly connected to control system.
See gure 5-8
guidance. Additional considerations:
• Control system requires equivalent water temperatures entering each boiler to properly sequence and adjust system supply temperature.
• Install multi boiler sensor kit. See "Parts, Kits & Optional Accessories" manual for part number.
primary loop ball valve.
primary loop ball valve open to use internal primary loop.
for general
14
Page 15
5 - HYDRONIC PIPING
NOTICE
Illustrations are meant to show system piping concept only. Installer responsible for all equipment and detailing required by authority having jurisdiction.
FIGURE 5-4 System Piping
System
Supply
System
Return
Piping Legend
FLOOR
Pipe to
condensate
drain
Table 3 - System Piping Congurations
Two Pipe Zoned System
Single Boiler
Primary/Secondary Pumping
Typical Mulitple Boiler Piping
Multiple Boilers
Primary/Secondary Pumping
With Zone Valves gure 5-5
With Zone Pumps gure 5-6
Closed External Primary Loop or
Open External Primary Loop gure 5-7
With Zone Valves gure 5-8
With Zone Pumps Not Shown
Closed External Primary Loop Not Shown
Open External Primary Loop
15
gure 5-7
Not Shown
Page 16
5 - HYDRONIC PIPING
FIGURE 5-5 Single Boiler Two-Pipe Zoned System With Zone Valves
DHW Pump
CH/System
Pump
Heat exchanger
ball valve open
(as shipped)
3/8"/9.5 mm
Open End
Wrench
FIGURE 5-6 Single Boiler Two-Pipe Zoned System With Zone Pumps
DHW Pump
Zone
Pump
Heat exchanger
ball valve open
Heat exchanger ball
(as shipped)
3/8"/9.5 mm
Open End
Wrench
16
Page 17
5 - HYDRONIC PIPING
FIGURE 5-7 Single Boiler Using Primary/Secondary Pumping With Closed External Primary Loop or Single Boiler Using Primary/Secondary Pumping With Open External Primary Loop
12"/305mm Max. apart
valve open
3/8"/9.5 mm Open
End Wrench
12"/305mm Max. apart
CH/System
Pump
Existing closely
spaced tees
in primary
system loop
Limit length
to
5'/1.6 m
Heat exchanger
ball valves closed
3/8"/9.5 mm Open
End Wrench
17
Page 18
5 - HYDRONIC PIPING
5-8 Typical Multiple Boiler Piping - (See Multiple Boiler Guide)
DHW Pump
CH/
System
Pump
12"/305mm Max. apart
System
Temperature
Sensor
Size common piping
according to
maximum heat
capacity of
entire system
All heat exchanger
ball valves closed
Up to 16
boilers
(See Multiple Boiler Guide)
18
3/8"/9.5mm Open
End Wrench
Page 19
6 - COMBUSTION AIR AND VENT PIPING
6.1 General
This boiler requires a dedicated direct vent system. Install combustion air and vent piping in accordance with these instructions, authority having jurisdiction,
and:
• USA - National Fuel Gas Code, ANSI 223.1/NFPA 54.
• Canada - Natural Gas and Propane Installation Code,
CAN/CSA B149.1
Vent connections serving appliances vented by natural draft shall not be connected into any portion of mechanical draft systems operating under positive pressure.
Install vent system in accordance with these instructions.
6.2 Removal of Existing Boiler From Common Vent System
When existing boiler is removed from common venting system, common venting system is likely to be too large for proper venting of appliances remaining connected to it.
After removal of existing boiler, following steps shall be followed with each appliance remaining connected to common venting system placed in operation, while other appliances remaining connected to common venting system are not in operation:
• Seal any unused openings in common venting system.
• Any improper operation of common venting system
should be corrected so installation conforms with National Fuel Code, ANSI Z223.1/NFPA 54 and/or Natural Gas and Propane Installation Code, CAN/CSA B149.1. When re-sizing any portion of common venting system, common venting system should be re-sized to approach minimum size as determined using appropriate tables in Chapter 13 of the National Fuel Gas Code, ANSI Z223.1/ NFPA 54 and/or Natural Gas and Propane Installation Code, CAN/CSA B149.1.
6.3 Venting Materials
• See Table 4
Table 4 - Combustion air and vent pipe ttings
must conform with the following:
Item Material Standards
PVC schedule 40 ANSI/ASTM D1785
PVC - DWV ANSI/ASTM D2665
ANSI/ASTM D1784/
F441
Vent Pipe
and Fittings
CPVC schedule 40
SDR-21 & SDR-26 PVC ANSI/ASTM D2241
ABS-DWV ANSI/ASTM D2661
• Visually inspect venting system for proper size and horizontal pitch. Determine there is no blockage or
restrictions, leakage, corrosion and other deciencies
which could cause an unsafe condition.
• When practical, close all building doors, windows, and all doors between space in which appliances remaining connected to common venting system are located and other spaces of building. Turn on clothes dryer and any appliance not connected to common venting system. Turn on exhaust fans, such as range hoods and bathroom exhaust so they will operate at maximum speed. Do not operate summer exhaust fan. Close
replace dampers.
• Turn on appliance being inspected. Follow lighting
instructions. Adjust thermostat so appliances will operate continuously.
• Test for spillage at draft hood relief opening after 5 minutes of main burner operation. Use ame of match or
candle, smoke from cigarette, cigar or pipe.
• Determine each appliance remaining connected to common venting system properly vents when tested as outlined above. Then return doors, windows, exhaust fans and any other gas-burning appliance to their previous condition of use.
Schedule 40ABS ANSI/ASTM F628
PP (Polypropylene)
Pipe and Components
Pipe
Cement/
Primer
IPEX is approved vent manufacturer in Canada listed to ULC-S636.
IPEX System 636 Cements and Primers are approved in Canada listed to ULC-S636.
Use of cellular core PVC (ASTM F891), cellular core CPVC, or Radel® , (Polyphenolsulfone) in venting systems shall be prohibited.
!
PVC ANSI/ASTM D2564
CPVC ANSI/ASTM F493
Schedule 40 ABS ANSI/ASTM D2235
WARNING
UL 1738
ULC S636-08
Use of cellular core PVC for venting ue gas could
result in death, serious injury.
!
WARNING
Covering non-metallic vent pipe and ttings with
thermal insulation shall be prohibited.
19
Page 20
6 - COMBUSTION AIR AND VENT PIPING
6.4 Pipe Installation
• Minimum and maximum combustion air and vent pipe lengths listed in Table 5. Pipe length counted from combustion air connector to termination.
• Install eld-sourced 2" to 3" transition, if used, in
vertical section at combustion air inlet and vent connector.
• 90° elbows equivalent to 5.0 ft (1.6 m). 45° elbows equivalent to 3.5 ft (1.1 m). 2" to 3" transition has no equivalent length.
• Slope vent pipes minimum 1/4" per foot (21 mm/m) back toward boiler. Support horizontal sections to prevent sags capable of accumulating condensate.
• Support piping in accordance with pipe manufacturer's instruction and authority having jurisdiction. In absence of manufacturer's instruction use pipe hooks, pipe straps, brackets, or hangers of adequate and strength located at intervals of 4 ft (1.2m) or less. Allow for expansion/contraction of pipe.
• Combustion air and vent piping must be air tight and water tight.
• Certied vent system components must NOT be
interchanged with other vent systems or unlisted pipe/
ttings.
• Canadian installations only. All venting material, primer
and glue must be listed to ULC S636.
• Canadian installations only. First 3 ft (0.9 m) of plastic vent pipe from vent connector must be readily accessible for visual inspection.
6.5 Termination
• Terminate combustion air and vent pipes with ttings or
concentric vent kit.
• See "Parts, Kits and Optional Accessory" manual for concentric vent kit part numbers.
• Use horizontal pipe for vent and 90° elbow for combustion air termination when using ttings.
• Terminate combustion air and vent pipes in same
atmospheric pressure zone through exterior sidewall or roof.
• Locate combustion air termination as far as possible from swimming pool, swimming pool pump house, and other sources of airborne chlorine.
• Locate combustion air and vent as required by authority having jurisdiction.
!
WARNING
Vent extending through exterior wall shall not terminate adjacent to wall or below building extensions such as eaves, balconies, parapets or decks. Failure to comply could result in death or serious injury.
Table 5 - Combustion Air and Vent Piping Length
Minimum/Maximum Vent Lengths
2” Pipe 3” Pipe
Model 075/100 075/100
Min.
Max.
6 ft.
(1.8 m)
50 ft.
(15.2 m)
Table 6 -Equivalent Length of Venting Components
Equivalent Length of Venting Components
Component Feet Meters
90° Elbow 5 1.6
45° Elbow 3 1/2 1.1
2" x 4" Adapter 0 0
3" x 4" Adapter 0 0
Concentric Vent Kit 5 1.6
Polypropylene Flexible Pipe per Foot 2 5/8 0.8
20
6 ft.
(1.8 m)
100 ft.
(30.5 m)
Page 21
6.7 Venting Congurations
Various venting congurations can be applied to this boiler. For guidance see Venting Conguration Table 7 and
corresponding gures.
Table 7 - Venting Congurations
NOTICE
Use of vent covers may cause freezing. If using vent covers overall vent length must be considered. Failure to heed this information may compromise operation of this boiler.
Flue Gas Location
Roof
Side Wall
Combustion Air
Location
Roof
Side Wall Single Pipe gure 6-8
Inside Air Single Pipe gure 6-9
Roof Single Pipe gure 6-10
Side Wall
Inside Air Single Pipe gure 6-11
Flue Gas Terminals
Two Pipe gure 6-1
Concentric gure 6-7
Two Pipe gures 6-2, 6-3
Concentric gures 6-4, 6-5, 6-6
Corresponding Figures
21
Page 22
6 - COMBUSTION AIR AND VENT PIPING
FIGURE 6-1
12" (30 cm)
Minimum
8" (21 cm)
Minimum
Vent Combustion
12" (30 cm) US,
18" (46 cm) Canada
Minimum Above
Anticipated Snow Line
FIGURE 6-2
3" (80mm)
Minimum
Air
15" (38 cm)
Maximum
Roof Line
Roof
Terminations
3" (8 cm) Minimum horizontal separation between combustion air intake and vent of same appliance.
8" (21 cm) Minimum vertical separation between combustion air intake and vent of different appliances.
15" (38 cm) Maximum horizontal length of vent.
Minimum vent/intake between different appliances 12" (30cm).
Maximum allowable total vertical vent length with outside exposure equals 10 ft.(3.05m).
Abandoned unused masonry chimney may be used as chaseway for combustion air and vent. Both combustion air and vent pipe must exit above top of chimney with clearances as shown in Figure 6-1.
12" (30 Cm)
Minimum From
Overhang
See Snow & Ice
Page 25
FIGURE 6-3
3" (8 Cm)
Minimum
Separation
12" (30 Cm) Separation
Between Bottom Of
Combustion Air Intake And
Vent
Combustion Air
12" (30Cm)
Minimum
Separation
Bottom Of Vent
Side Wall
Terminations
3" (8 cm) Minimum horizontal separation between combustion air intake and vent terminations.
8" (21 cm) Minimum vertical separation between combustion air intake and vent terminations.
12" (30 cm) Separation between bottom of combustion air intake and bottom of vent.
Multiple terminations as shown in 6-1, 6-2, and 6-3 must be a minimum of 12” (30 cm) horizontally between vent of one termination and air intake of next appliance.
Maximum allowable total outside exposure vent length equals 10 ft. (3.05m).
Maintain a pitch of 1/2" per ft (0.15m/m) back to boiler to ensure proper condensate drainage for horizontal runs.
See Snow & Ice
Page 25
Combustion Air
Vent
22
Page 23
6 - COMBUSTION AIR AND VENT PIPING
FIGURE 6-4 Side Wall Concentric Terminal FIGURE 6-5 Side Wall Concentric Terminal Multiple
Appliances
1"(2.54cm)
1" (25.4mm)
Maximum
Maximum
Vent
Combustion
Air
FIGURE 6-6 Concentric Terminal Connection
*2 or 3" (51 or 77 mm) Diameter
PVC intake/combustion air
Roof
1" (25mm)
Maximum
* See Note
Below
Combustion
Air
Overhang
12" (305mm) Minimum
36"(0.9m(457mm)
Vent
Maintain 12"(30cm) US
(18"(46cm) Canada)
highest anticipated
Clearance Above
snow level or grade
Highest Anticipated
Snow Level Or Grade
(28m)) Minimum
Maintain 12"
clearance above
*Must be less than 4" (102mm) or greater than 24" (610mm) Horizontal distance between end bells of each air
intake to prevent ue gas recirculation.
Note: Securing strap must
be eld installed to prevent
movement of termination kit in side wall
Combustion Air
OD 3½" (
89mm)
- *2" (
51mm)
kit
OD 4½" (114mm) - 3" (77mm) kit
** Note Overall length may be modied by cutting or extending
both combustion air and vent pipes. 12" (305mm) is minimum allowable length and 60" (1.2m) is maximum allowable length for this dimension.
SDR-26 PVC (D2241) only may be used for extending pipes. Do not use Schedule 40 PVC or use couplings to extend pipes. Dimension will change if intake/vent pipes are lengthened or shortened.
**See
Note
*2" (
51mm)
Diameter = 41" Length (1.1m)
3" (77mm) Diameter = 47" Length (1.2m)
1"(25.4mm) Maximum
Vent
Combustion Air
* Note: 2" (51mm) For use with models 075/100 3" (77mm) For use with models 075/100
23
Page 24
6 - COMBUSTION AIR AND VENT PIPING
FIGURE 6-7 Concentric Roof Terminal
Vent
Maintain 12"(305mm) US
(18"(457mm) Canada)
clearance above highest
Combustion Air
Roof boot/ashing (eld supplied)
Note: Support must
be eld installed to
secure termination kit to structure
Vent
FIGURE 6-8 Flue on Roof, Air Intake on Side Wall
Vent
anticipated snow level 24"
(610mm) above roof
Support
(eld supplied)
Combustion Air
Maintain 12"(305mm) US
(18"(457mm) Canada)
clearance above highest
anticipated snow level 24"
(610mm) above roof
Concentric
Vent Roof
Terminations
Glue inner vent pipe to prevent
recirculation.
Maintain 12" (305mm) US
(18"(457mm) Canada) minimum clearance above highest anticipated snow level. Maximum of 24"(610mm) above roof.
Support must be eld installed to
secure termination kit to structure.
Elbow, roof boot/ashing eld supplied. Allowed Wall/Roof thickness 1/2"-30"
(12.7mm - 762mm).
Vertical concentric vent system can be
installed in unused masonry chimney.
Contact Technical Support 800-
325-5479 for questions regarding installation or use.
Terminate vent system bottom, minimum 12" (300 mm) above highest anticipated snow level.
Combustion Air
12" (305mm) Anticipated Snow Line
Ground Level
FIGURE 6-9 Flue on Roof, Combustion Air
Vent
Combustion
Air
Maintain 12"(305mm) US
(18"(457mm) Canada)
clearance above highest
anticipated snow level 24"
(610mm) above roof
24" (610mm) * Minimum Length
Grade, Snow
& Ice
Doors &
Windows
* See Tables
5 & 6
Avoid locations where snow may drift and block vent and combustion air. Ice or snow may cause boiler to shut down if vent or combustion air becomes obstructed.
Combustion air and vent termination must be 12" (305mm) from or below doors, windows or gravity inlet.
Combustion air and Vent Piping Length Page 19 .
24
Page 25
6 - COMBUSTION AIR AND VENT PIPING
FIGURE 6-10 Flue on Sidewall, Combustion Air on Roof
Congurations of single pipe vent with ue on the
sidewall, requires a tee as the vent terminal. See
gures 6-10 and 6-11.
Combustion
Air
Maintain 12"(305mm) US
(18"(457mm) Canada)
clearance above highest
anticipated snow level 24"
(610mm) above roof
Vent
12" (305mm) Anticipated Snow Line
Ground Level
NOTICE
FIGURE 6-11 Flue on Sidewall, Inside Combustion Air
Vent
Combustion
Air
12" (305mm) Anticipated Snow Line
Ground Level
25
Page 26
6 - COMBUSTION AIR AND VENT PIPING
6.8 Side Venting Terminal Requirements of :
• USA - National Fuel Gas Code, ANSI 223.1/NFPA 54.
Venting terminal from doors and windows See gure 6-12
Venting terminal from forced air inlet of other appliances See gure 6-13
Venting terminal from snow level See gure 6-14
Venting terminal from vegetation See gure 6-15
Venting terminal from public walkway See gure 6-16
FIGURE 6-12
Doors &
Termination must be
12" (305mm) from
or below doors,
windows or gravity
inlet.
12"
(305mm)
Minimum
FIGURE 6-13
Forced Air
Inlet
FIGURE 6-14
Less than
10' (3m) Minimum
Termination
Termination
3' (0.9m) [If located within 10' (3m) of forced air inlet]
Windows
Condensate
Forced Air
Inlet
Combustion air and vent termination must be 12" (305mm) from or below doors, windows or gravity inlet.
Vent gas may condense, forming moisture, may be corrosive. Protect building materials at vent from exhaust of vent gas.
Terminate venting system 3’ (0.9m) above and 10' (3.0m) from any forced air inlet (except boiler’s combustion air inlet).
Terminate vent system bottom, minimum 12" (300 mm) above highest anticipated snow level.
3' (0.9m) Minimum
Grade, Snow
& Ice
Corner
26
"L"
Avoid locations where snow may drift and block vent and combustion air. Ice or snow may cause boiler to shut down if vent or combustion air becomes obstructed.
Vent termination shall NOT be installed closer than 3' (0.9m) from inside corner of “L” shaped structure.
Page 27
6 - COMBUSTION AIR AND VENT PIPING
FIGURE 6-15
Keep vent termination 3’ minimum
Vegetation,
Plants &
Shrubs
(0.9m) away from vegetation. Position termination where vent vapors will not damage plants/shrubs or air conditioning equipment.
Termination
Meters,
Regulators,
deck, porch
3' (0.9m) Minimum
FIGURE 6-16
Walkways
People or
Pets
Vent termination US only - 4’ (1.2m), Canada - 6' (1.9m) horizontally from, no case above or below, electric meters, gas meters, regulators, and relief equipment, or under deck or porch.
Locate vent termination minimum 7' (2.1m) above any public walkway, with consideration to condensate.
Locate combustion air and vent termination to prevent accidental contact with people or pets.
Multiple
Family
Dwellings
7' (2.1m)
Minimum
Vent shall not terminate directly above paved sidewalk or paved driveway located between two single-family dwellings serving both dwellings.
Stones,
Balls, Etc�
Vapors
Eddy, Flue
Gases
Position combustion air and vent termination where it will NOT be damaged by foreign objects, such as stones, balls, etc.
Position termination where vent vapors are not objectionable.
Position termination so it will not be effected by wind eddy, air born leaves, snow, or recirculated vent gases. Give consideration to excessive wind and locate away from windward side of building.
27
Page 28
6 - COMBUSTION AIR AND VENT PIPING
FIGURE 6-17 Condensate Drain
6.9 Condensate Piping
• Use materials acceptable to authority having jurisdiction. In absence of such authority:
• USA - PVC or CPVC per ASTM D1785/D2845 Cement or primer per ASME D2564 or F493.
• Canada - CSA or ULC certied PVC/CPVC pipe, ttings and cement.
• Insert 1/2" (1.3 cm) PVC pipe through grommet in chassis. See gure 3-2.
• Attach PVC tee provided with boiler and eld sourced
piping to condensate drain vertical tee on left side of
boiler. See gure 6-17.
• Slope condensate drain pipe minimum 1/4" per foot
(21mm/m) away from boiler.
• Use condensate pump if boiler located below disposal point. 120 VAC auxiliary power outlet can be used to power condensate pump.
• Field source condensate neutralizing kit as required by authority having jurisdiction or for environmentally friendly condensate disposal.
PVC Tee (Field Installed)
On Condensate Drain Pipe
28
Page 29
7 - GAS SUPPLY PIPING
7-1 Gas Connection Knockout Plate at Bottom of Boiler
Bottom cover
for Optional Gas
Connection
7-2 Gas connection at Top of Boiler
Gas Connection Top
of Boiler
7-3 Bottom Gas Connection
Optional Bottom Gas
Connection
!
CAUTION
WHAT TO DO IF YOU SMELL GAS
• Do not try to light any appliance.
• Do not touch any electrical switches; do not use
any phones in your building.
• Immediately call your gas supplier from a neighbor’s phone. Follow gas supplier’s instructions.
• If you cannot reach your gas supplier, call the re
department.
NOTICE
Use two (2) wrenches when tightening and tting to pipe boiler's threaded ttings. Boiler's internal
piping can be damaged if subjected to excessive torque.
7.1 General
• Use piping materials and joining methods acceptable to authority having jurisdiction. In absence of such requirements:
• USA - National Fuel gas Code, ANSI Z223.1/NFPA 54
• Canada - Natural Gas and Propane Installation Code,
CAN/CSA B149.1
• Size and install gas piping system to provide sufcient
gas supply to meet maximum input at not less than minimum supply pressure. See Table 8.
• Support piping with hooks straps, bands, brackets, hangers, or building structure components to prevent or dampen excessive vibrations and prevent strain on gas connection. Boiler will not support piping weight.
• Use thread (joint) compound (pipe dope) suitable for liqueed petroleum gas.
• Provide sediment trap up stream of gas valve.
SIZE
075/100 75,000
Maximum
Input (Btuh)
7.2 Conversion Kit Instructions
• See Gas Conversion Kit Instructions included with Boiler.
TABLE 8: GAS SUPPLY PRESSURE
Natural Gas Propane
Min. Max. Min. Max.
3.0" w.c.
(0.7 kPa)
Note: See Glossary - Piping Table 16
13.5" w.c. (3.3 kPa)
(1.2 kPa)
29
5.0" w.c.
13.5" w.c. (3.4 kPa)
Page 30
7 - GAS SUPPLY PIPING
!
DANGER
Fire Hazard. Do not use matches, candles, open
ames, or other methods providing ignition source.
Failure to comply will result in death or serious injury.
7.3 Near Boiler Gas Piping
•
Select top or bottom gas connection. To convert from top connection to bottom connection:
•
Remove bottom knockout by removing two (2)
screws. See gure 7-1.
•
Disconnect gas connection by removing two (2)
screws. See gure 7-2.
•
Relocate gas connection to bottom opening.
Secure with two (2) screws. See gure 7-3.
•
Relocate knockout cover to top opening. Secure
with two (2) screws. See gure 7-4.
•
Install eld sourced manual main shutoff valve and ground joint union. See gure 7-5.
7-4 Gas Connection Knockout Plate at Top of Boiler
Top of Boiler Cover for
Gas Connection
7-5 Manual Main Gas Shutoff Valve Outside Boiler Jacket
Manual Main Gas
Shutoff Valve
7.4 Leak Check Gas Piping
Pressure test boiler and gas connection before placing boiler in operation.
•
Pressure test over 1/2 psig (3.5 kPa). Disconnect boiler and its individual gas shutoff valve from gas supply system.
•
Pressure test at 1/2 psig (3.5 kPa) or less. Isolate boiler from gas supply system by closing
manual gas shutoff valve. See gure 7-6.
•
Locate leakage using gas detector, noncorrosive
detection uid, or other leak detection method
acceptable to authority having jurisdiction. Do
not use matches, candles, open ames, or other
methods providing ignition source.
•
Correct leaks immediately and retest.
Option: Gas
Connection May be
Located
At Bottom of Boiler
7-6 Gas Shutoff Valve
Gas shutoff valve
(shown in closed
position)
30
Page 31
8 - ELECTRICAL CONNECTIONS
8.1 General
Electrically bond boiler to ground in accordance with requirements of authority having jurisdiction. Refer to:
• USA- National Electrical Code, ANSI/NFPA 70.
• Canada - Canadian Electrical Code, Part I, CSA C22.1:
Safety Standard for Electrical Installations.
8.2 Line Voltage Connections (Figure 8-1)
• Boiler
A. Provide individual 120V, 15 amp circuit
(recommended) with fused disconnect or service switch, as required by authority having jurisdiction.
B. Open High Voltage Junction Box (see Figures 3-1,
3-2) to access line voltage terminal strip.
C. Connect 120 VAC circuit to line voltage terminal
strip 120 VAC L,N,G.
• Central Heating Pump, if used.
A. Isolate pump from control module if pump FLA (Full
Load Amps) exceeds 5 amps.
B. Connect pump to line voltage terminal strip CH
PUMP L,N,G.
• Domestic Hot Water Pump, if used.
A. Isolate pump from control module if pump FLA
exceeds 1.0 amp.
B. Connect pump to line voltage terminal strip DHW
PUMP L,N,G.
8.3 External Connections (Figure 8-2)
• User Interface Terminals
A. Factory wired to low voltage terminal plug USER
INTERFACE terminals
B. Optional - Remote mount user interface for
improved access.
C. Maximum wire length is 100 ft (30m) for 22 ga.
wire, or 150 ft (45m) for 18 ga. wire.
!
WARNING
Electrical shock hazard. Turn OFF electrical power supply at service panel before making electrical connections. Failure to do so could result in death or serious injury.
NOTICE
Wiring diagrams can be found in Section 14 of this Manual.
8-1 LINE VOLTAGE CONNECTIONS
8-2 EXTERNAL CONNECTIONS (Do not apply external voltage to external
terminals.)
• Argus Link (Multiple boiler applications only)
31
Page 32
8 - ELECTRICAL CONNECTIONS
• Outdoor Sensor, if used.
A. Provided with boiler in accessory kit. B. Locate outdoor sensor to protect against wind and
direct sunlight. Mounting instructions provided with sensor.
C. Maximum wire length is 100 ft (30m) for 22 ga.
wire, or 150 ft (45m) for 18 ga. wire.
D. Connect wires to low voltage terminal plug
OUTDOOR SENSOR terminals. Wires are interchangeable.
• System Sensor (Multiple boiler applications only)
• Domestic Hot Water (DHW) Thermostat, if used.
A. Use temperature control with dry contacts rated
at 0.5 amps @ 120 VAC. Boiler control does not provide power to DHW temperature control.
NOTICE
Do not apply power to DHW T-T terminals. Dry contact only, use of isolation relay may be necessary.
B. Maximum wire length is 330 ft (100 m) 22 gauge
wire.
C. Connect wires (interchangeable) to low voltage
terminal plug DHW T-T terminals. Wires are interchangeable.
• Central Heating Thermostat
A. Use thermostat or boiler system control with dry
contacts related 0.5 amps @ 120 VAC. Boiler control does not provide 24 VAC power to central heating thermostat.
B. Locate and install thermostat per manufacturer's
instructions. Maximum wire length is 330 ft (100 m) for 22 ga. wire.
C. Connect wires to low voltage terminal plug CH T-T
terminals. Wires are interchangeable.
NOTICE
Use dry contact for wires to CH T-T terminal and DHW T-T terminal. E33 error code is displayed if voltage is sent back to the control board. If error is not corrected for extended period of time, this voltage can permanently damage control board.
32
Page 33
9 - START UP PROCEDURE
NOTICE
Condensate trap must be manually lled with water
at initial start up.
9�1 Fill Boiler With Water And Purge Air
NOTICE
To maintain boiler efciency and prevent boiling inside the heat exchanger, ush entire heating
system until clean.
• Flush heating system, including all heating zones.
• Fill boiler with potable water.
•
Fill boiler and system piping with water (or antifreeze­water solution, if used). See antifreeze information page 12. Purge air from boiler using air vent. Purge air from system piping.
•
Inspect system piping and boiler connections. Repair any leaks immediately.
•
Activate all heating zones and calls for heat, including CH calls and DHW calls (if available).
•
Close manual gas shut off valve. Let system run for 30 minutes. When boiler goes into lockout, reset boiler by pressing "Reset" button until boiler resets.
•
Do not open gas shutoff valve until all air is purged from system.
9-1 Condensate Drain Assembly
1. Disconnect collet clip
from hose barb and ll
Condensate trap with water.
9�2 Fill Condensate Trap with Water
•
Disconnect collet clip from elbow. See gure 9-1.
•
Disconnect tubing below elbow.
•
Pour about 1 cup (237ml) of water into condensate drain.
•
Reconnect tubing to elbow with collet clip. See Figure 9-1.
2. Reconnect collet clip to hose barb before starting boiler.
33
Page 34
9 - START UP PROCEDURE
9 -2 User Interface
9-3 Default Table
Control Parameter
9.3 Program Boiler Control
Key Description
- Manual Lockout Reset
- Enter/Exit user menu
- Go to previous screen
- Select a menu item
- Conrm new parameter value
- Scroll up to next menu item
- Increase value
- Scroll down to next menu item
- Decrease value
Boiler is factory programmed with following factory default settings, Figure 9-2. Parameters can be adjusted to suit particular application. Detailed explanation of each can be found in Appendix A
- Control Module. List parameters in event of Control Module Failure to
reprogram your settings.
Factory Default
Setting
Setting Range
*Actual
Parameter
Settings
Standard Metric Standard Metric
Central Heating Setpoint
User
Menu
Installer
Menu
* List parameters in event of Control Module Failure to reprogram your settings.
Settings
Boiler
Conguration
CH Settings
DHW Setpoint 180°F 82°C 104 - 195°F 40 - 91°C
Temperature Units °F °F/°C
Language English English/French
Boiler Address 0 0-15
Low Water Cutoff Enabled Enable/Disabled
Pump Mode 0 0 & 4
Service Reminder Status On ON/OFF
Service Reminder Days 365 Days 1- 999 Days
CH Mode 1 0-3
Warm Weather Shutdown 70°F 21°C 35-100°F 2-38°C
Reset Curve Design Temperature - Boiler 180°F 82°C 60-195°F 40-91°C
Reset Curve Design Temperature - Outdoor 25°F -4°C -60-32°F -51-25°C
Reset Curve Mild Weather Temperature ­Boiler
Reset Curve Mild Weather Temperature ­Outdoor
Reset Curve Boiler Minimum Temperature 70°F 21°C 40-180°F 4-82°C
Reset Curve Boiler Maximum Temperature 180° 82°C 80-195°F 27-91°C
Boost Function Temperature 18°F 10°C 0-36°F 0-20°C
Boost Function Time 20 Minutes 1-120
Maximum Power CH 100% 1-100%
DHW Mode 0 0/2
DHW Maximum Priority Time 30 Minutes 1-60 minutes
140°F 60°C 104 - 195°F 40 - 91°C
70°F 21°C 35-120°F 2-49°C
70°F 21°C 35-85°F 2-29°C
34
Page 35
9 - START UP PROCEDURE
9.4 Boiler Start-up and Operational Test
1. Verify air is purged from hydronic piping
2. System test pumps - verify each pump is
operational
3. Verify gas piping
•
Conrm pressure test. See section 7.4.
•
Visually inspect piping to determine there are no
open ttings or ends, and all valves at unused
outlets are closed and plugged/capped.
•
Purge air from piping
•
Check piping and connections for leaks immediately after gas is turned on. Shut off gas supply and make necessary repairs if leaks found.
4. Follow OPERATING INSTRUCTIONS to initiate boiler
operation. See section 10.
5. Inspect combustion air and vent piping. Verify pipe
is not leaking and terminations are unobstructed and vent gas discharge is not a nuisance or hazard.
6. Verify boiler functions.
7. Inspect condensate disposal system. Verify
condensate ows adequately and is disposed
properly.
8. Check control module operation.
9. Check eld sourced limits, low water cutoffs, etc.
per manufacturer's instructions.
9�5 Check Combustion
Natural Gas
1. Measure input. English units*
•
Turn off gas to all other appliances.
•
Activate some heating zones to dissipate heat.
•
Set boiler on high re.
•
Use ½, 1 or 2 cu ft dial on gas meter. Measure time required for one or more complete revolutions. Measure time for 1-2 minutes.
•
Calculate input.
Input (MBH) =
Example: Gas ow from
Meter = 2 cu ft Measured time = 72 seconds
Rate (MBH) =
*Metric - See Glossary
3600 x cu ft
seconds
3600 x 2 cu ft
= 100 MBH
72 seconds
2. Compare measured input to table. Adjust input rate
if needed using Table 12 below.
Table 12 - Rate @ High Fire
Size Minimum Maximum
075 65 85
100 90 102
Natural Gas and Propane
3. Measure CO
Adjust CO2 if needed using gure 9-3 . See gure 9-5 combustion air analyzer port.
at high re and compare to table.
2
Natural Gas only**
4. Measure input. Compare to table above. Continue
to measure input and CO2 until both measured values are within range specied in tables.
35
Page 36
9 - START UP PROCEDURE
CO
Gas
Natural Gas Propane
Min. Max.
9.0 9.5
10.0 11.0 <200ppm
2
CO
<200ppm
NOTICE
Contact Technical Support @ 800-325-5479 for additional information or assistance.
Natural Gas only**
1. Measure input. Compare to table above. Continue
to measure input and CO2 until both measured
values are within range specied in tables.
Propane Gas
Most propane systems do not have ow meters.
1. Check CO
11.0%.
•
If CO2 is low increase gas ow following gure 9-3 & 9-4.
•
If CO2 is high decrease gas ow following gure 9-3 & 9-4.
FIGURE 9-3 Gas Valve - Models 075/100 MBH
. Propane should be between 10% and
2
Verify Burner, Proper Operation
1. Inspect burner ame through Sight Glass. See
gure 9-5.
2. Operate boiler through several heating cycles,
including domestic hot water, if used. Verify proper operation.
3. Reset control parameters to operating settings if
adjusted to allow startup and operation test.
4. Follow instructions TO TURN OFF GAS TO APPLIANCE
if boiler is not being placed into immediate operation.
5. Enter installer information on Warranty Registration
Card.
6. Gather all instructions, manuals, wiring diagrams,
warranty registration card and other supporting
information. Review with user and/or afx in
conspicuous location adjacent to boiler.
1/4" Flat Head
Screwdriver
•
To increase gas ow turn 'throttle' left or counter
clockwise .
•
To decrease gas ow turn 'throttle' right or
clockwise .
•
Limit adjustment to one turn and retest.
36
Page 37
9 - START UP PROCEDURE
NOTICE
Combustion analyzer port is provided. After use replace cover.
9-4 Combustion Analyzer Port
Combustion Analyzer Port
9-5 Burner Flame
9�6 Perform CSD-1 Compliance Test (see paragraph 2�5 page 6)
Verify operation of boiler safety control operation with
regard to no ow conditions as follows:
1. Turn off boiler using boiler service switch.
2. Disable primary boiler pump. Disconnect multi pin
connector J7 from control module. See gure 9-6.
3. Disable secondary system pumps attached to
system.
4. Establish call for heat. Jump CHW T-T terminals
on low voltage terminal block. Turn on boiler using boiler service switch.
5. Boiler will re. Based on natural convection within
boiler, boiler will either: A.
Lockout A-06 "Safety Relay Error". Requires manual reset of control module. Press reset button on User interface. See 9.3 Program Boiler Control .
OR
B.
Shut off burner E40 "Return Water Temp". This is a soft lockout. When water temperature drops
below limit boiler will automatically rere then
Lockout A-06 requiring manual reset of control module. Press Reset button on User Interface.
OR
C.
Shut off burner E39 "Flue Temperature Sensor".
This is a soft lockout. When ue sensor drops below limit, boiler will automatically rere then
Lockout A-06 requiring manual reset of control module. Press Reset button on User Interface.
6. After safety operation is veried, turn off boiler via
service switch. Remove jumper in T-T. Replace J7 connector into control module, enable secondary pump operation, turn service switch on and restart
system to verify operation.
Burner
Flame
Flame
Look for BLUE ame
with slight YELLOW tips
evenly spaced around
burner
37
Page 38
9 - START UP PROCEDURE
FIGURE
9-6Control Module J7 Connector
J7 CONNECTOR
9.7 Complete Start Up Procedure
1. Reset control parameters to operating settings if
adjusted to allow startup and operation test.
2. Follow instructions TO TURN OFF GAS TO APPLIANCE
(page 39) if boiler is not being placed into immediate operation.
3. Enter installer information on Warranty Registration
Card.
4. Gather all instructions, manuals, wiring diagrams,
warranty registration card and other supporting
information. Review with user and/or afx in
conspicuous location adjacent to boiler.
38
Page 39
10 - OPERATING INSTRUCTIONS
FOR YOUR SAFETY READ BEFORE OPERATING
!
WARNING
If you do not follow these instructions exactly, a re or explosion may result
causing property damage, personal injury or loss of life.
• This appliance is equipped with an ignition device which automatically lights burner. Do NOT try to
light this burner by hand.
• Before operating smell all around appliance area for gas. Be sure to smell next to oor because
some gas is heavier than air and will settle to the
oor.
• Use only your hand to turn the gas shutoff valve. Never use tools. If valve will not turn
by hand, do not try to repair it, call a qualied
service technician. Force or attempted repair may
result in re or explosion.
• Do not use this appliance if any part has been under water. Immediately call a qualied
service technician to inspect appliance and to replace any part of control system and any gas control which has been under water.
!
CAUTION
WHAT TO DO IF YOU SMELL GAS
• Do not try to light any appliance.
• Do not touch any electrical switches; do not use
any phone in your building.
• Immediately call your gas supplier from a neighbor’s phone. Follow the gas supplier’s instructions.
• If you cannot reach your gas supplier, call the re
department
.
10.2 TO TURN OFF GAS TO APPLIANCE
• Set thermostat to lowest setting.
• Turn "OFF" all electric power to appliance if service is
to be performed.
• Remove front jacket panel.
• Turn gas shutoff valve handle clockwise to closed
position. Handle should be perpendicular to gas pipe.
• Replace front jacket panel.
10-1 Gas Shutoff Valve
10.1 OPERATING INSTRUCTIONS
Stop! Read Safety information above�
• Set thermostat to lowest setting.
• Turn "OFF" all electrical power to appliance.
• This appliance is equipped with an ignition device which
automatically lights the burner. Do not try to light burner by hand!
• Remove front jacket panel.
• Turn gas shutoff valve clockwise to closed position.
Handle should be perpendicular to gas pipe.
• Wait 5 minutes for any gas to clear. Smell for gas, including near oor. If you smell gas, STOP! Follow
instructions on this page: “What To Do If You Smell Gas.” If you do not smell gas, go to next step.
• Turn gas shutoff valve counter clockwise to the open position. Handle should be parallel to gas pipe.
• Replace front jacket panel.
• Turn "ON" electrical power to appliance.
• Set thermostat to desired setting.
• If the appliance will not operate, follow instructions TO
TURN OFF GAS TO APPLIANCE and call your service technician or gas supplier.
OPEN POSITION
CLOSED POSITION
39
Page 40
11 - GENERAL MAINTENANCE AND CLEANING
!
DANGER
Before servicing, turn off electrical power to boiler at service switch. Close manual gas valve to turn gas supply OFF to boiler.
!
CAUTION
Label all wires prior to disconnection when servicing controls. Wiring errors can cause improper and dangerous operation.
NOTICE
Verify proper operation after servicing.
NOTICE
Perform regular service and maintenance by
qualied service agency at least once every 12
months to assure safe, trouble free operation and
maximum efciency.
11-1 Sight Glass
11.1 Beginning of Each Heating Season
• Check boiler area is free from combustible materials, gasoline, and other ammable vapors and liquids.
• Visually inspect combustion air and vent piping for
proper operation. Check for and remove any obstruction
to ow of combustion air or vent gases. Immediately
repair or replace pipe showing deterioration or leakage. Reassemble per instructions in section 6. Ensure proper reassembly and resealing of system.
• Visually inspect condensate drain line for proper operation. Checking for deteriorated or plugged condensate drain line. Verify condensate trap drains freely.
• Test safety relief valve for proper operation. Refer to valve manufacturer's instructions packaged with relief valve.
• Examine ue passages in heat exchanger, burner,
condensate lines, and cleaning (if necessary) by following instructions in “Annual Examination and Cleaning of Boiler
Components” in this section.
• Circulator pump and combustion air blower motor furnished with boiler are permanently lubricated from factory and require no further lubrication. Lubricate
eld sourced pumps and/or motors should be lubricated
according to pump and/or motor manufacturer’s instruction.
Sight Glass
• Check following components are operating properly and are free of blockages or obstructions:
• air vent;
• check venturi air inlet for blockage and clean as
required;
• check air hose is tight
• supply, return, and ue temperature sensor clips
must be securely seated on pipes; Check boiler for any sign of leaks.
• Check low water cutoff using user interface.
• Check operation by pressing test button on low water
cutoff.
• "Low Water" LED should illuminate and burner should shut down.
• Should get error message on User Interface (E36).
• Every 5 years remove low water cutoff. Reinstall after cleaning.
• Every 10 years replace low water cutoff.
• Check ame signal with user interface. Should be 8 micro
amps at 100%.
• Visual inspection of ame through sight glass. Burner should be fully illuminated. See gure 11-1.
• Check expansion tank.
40
Page 41
11 - GENERAL MAINTENANCE AND CLEANING
11.2 Annual Shut Down Procedure
• Follow instructions “To Turn Off Gas To Appliance” unless boiler is also used to supply domestic hot water. See section 10 page 39.
• Drain system completely and add antifreeze when heating system is to remain out of service during freezing weather.
• Drain condensate lines when boiler is to be exposed to freezing temperatures.
!
WARNING
Following service procedures must be performed
by qualied service agent. Boiler owner shall not
attempt these steps. Failure to do so could result in death or serious injury.
11.3 Annual Examination and Cleaning of Boiler
Components
• Obtain Burner Inspection Kit. Follow kit instructions to prepare for examination and cleaning.
• Burner and heat exchanger inspection and cleaning.
• Remove gasket and burner. Allow burner to clear top
lip of chassis.
• Remove any residual sleeve and/or gasket material from removed burner.
11-2 Blower Inlet Assembly
Blower
Inlet
Housing
Refractory
Burner
Flame Sensor
Igniter
Sight Glass
• Clean burner using air hose directed into top of burner opening to dislodge any debris in burner
ports. Inspect burner for foreign matter in ame
ports or inside burner. Remove foreign matter by blowing with compressed air or vacuuming. Replace burner if it cannot be cleaned or is showing deterioration.
• Clean heat exchanger with low pressure water spray. Use exible handle nylon brush to loosen sediment
and oxide on all accessible heating surfaces of heat exchanger. Take care not to get brush stuck in heat exchanger.
• Remove any remaining loosened sediment using shop vacuum with snorkel attachment.
• Clean condensate collector if signicant debris found
in heat exchanger.
• Expand upper spring tension clip of condensate trap using hose clamp pliers. Disconnect condensate trap
from condensate collector. See gure 9-1 page 33.
• Disconnect wire harness from vent temperature s e n s o r . S e e ( 1 5 )  g u r e 3 - 2 p a g e 9 .
41
Page 42
11 - GENERAL MAINTENANCE AND CLEANING
11-3 Condensate Collector • Loosen upper hose clamp securing condensate
collector to ue pipe using 3/8" socket with 6"
extension.
• Remove ¼-20 hex ange nuts securing condensate
collector to heat exchanger using 7/16" deep well
socket. See gure 11-3.
Combustion
Condensate
Collector
Condensate
Drain
Chamber
• Remove condensate collector assembly from heat exchanger and ue pipe.
• Flush collector and condensate trap with water.
• Follow Burner Inspection Kit instructions to reassemble
boiler and resume operation.
42
Page 43
12 - RATINGS AND CAPACITIES
SEA LEVEL RATINGS
NATURAL AND PROPANE GASES
Boiler Input Rate
Size
Maximum Minimum
075 100
(1)
1000 Btu/hr (British Thermal Units Per Hour)
(2)
Heating Capacity and AFUE (Annual Fuel Utilization Efciency) are based on DOE (Department of Energy) test
procedures.
(3)
Net AHRI Ratings based on piping and pickup allowance of 1.15. Contact Technical Support before selecting boiler for installations having unusual piping and pickup requirements, such as intermittent system operation, extensive piping systems, etc.
(MBH)
75 15 69 60 97
100 20 91 79 97
(1)
12.1 Ratings and Capacities
• Constructed and hydrostatically tested for maximum allowable working pressure of 50 psig (pounds per square inch gauge) (345 kPa) in accordance with ASME Boiler and Pressure Vessel Code, Section IV, Rules for Construction of Heating Boilers.
• Ratings used for elevations up to 2000 ft (600m) above sea level.
• For elevations between 2000 ft (600m) and 4500 ft (1350m), install high altitude control kit
Heating
Capacity
(MBH)
(1)(2)
Net AHRI
Rating, Water
(MBH)
(1)(3)
AFUE
(2)
• For elevations above 4500 ft (1350m) install high altitude control kit and :
• USA - Reduce input rate 4% for each 1000 ft (300m) beyond 4500 ft.
• Canada - Boiler derates input 10% for every 2000 feet (610 m) above an elevation of 4500 feet (1.37 km).
43
Page 44
13 - TROUBLE SHOOTING
44
Page 45
3
13 - TROUBLE SHOOTING
Screen Display Explanation
Control has blocking error for more than 20 hours in a row.
Three unsuccessful ignition attempts in a row Go to Page 48
Open gas valve power circuit. May involve high temperature switch, gas valve, or gas valve relay in control module.
Safety Circuit is open. Go to Page 49
Blower speed does not reach speed calculated by Control Module.
Control Module internal error.
Go to Page For
Troubleshooting
Go to Page 47
Go to Page 47
Go to Page 50
Replace Control
Module
High Temperature opens during normal operation.
Control Module detects ame after gas valve
is closed more than 10 seconds.
Go to Page 51
Replace Gas Valve
Flame is detected before gas valve opens. Replace Gas Valve
Control module internal error.
Replace Control
Module
Lost ame signal 3 times during one heat call. Go to Page 52
Control Module internal error.
Control Module internal error.
Replace Control
Module
Replace Control
Module
External voltage supplied to DHW T-T or CH
Blocking Error
REFLO too LO
T-T terminals. Eliminate voltage using dry contact relay.
Flame detected when gas valve is closed. Go to Page 52
-
45
Page 46
3
E
39
13 - TROUBLE SHOOTING
Screen Display Explanation
Low water cutoff sees no water. Go to Page 53
Go to Page For
Troubleshooting
Blocking Error
Flue Gas Error
Flue temperature sensor sees temperature higher than 200°F.
Return water temperature sensor sees temperature higher than 200°F.
Control board internal error. Power down then power up boiler. If error repeatedly occurs replace control module.
Boiler is powered by three wires, hot, neutral and ground. E44 displays when neutral wire is not neutral.
Control board sees power supply frequency not in range of 59 to 61 Hz.
Boiler power supply ground wire is not grounded.
Control board internal error. Power down then power up boiler. If error repeatedly occurs replace control module.
Go to Page 54
Go to Page 55
Replace Control
Module
Go to Page 55
Go to Page 56
Go to Page 57
Replace Control
Module
Supply temperature sensor is open. No continuity.
Return water temperature sensor is open. No continuity.
Flue temperature sensor is open. No continuity.
Supply water temperature sensor is shorted. '0' Ohm
Return water temperature sensor is shorted. '0' Ohm
Go to Page 56
Go to Page 57
Go to Page 59
Go to Page 59
Go to Page 60
Flue temperature sensor is shorted. '0' Ohm Go to Page 60
Reset button was pressed too many times.
Error Clears in 1-2
minutes
Fault detected in blower motor system. Go to page 56
46
Page 47
13 - TROUBLE SHOOTING
Replace Supply Sensor
NO
hot?
YES
pipe at top of boiler)
Is supply pipe (copper
NO
available?
YES
Unplug connector on supply
sensor. Measure continuity of high
two purple wires. Is continuity
between two pins connected to
limit sensor (close/open signal)
Is wire harness
connected to both
Gas Valve and J13
Boiler has been dry
red. System has too
Connect harness
NO
Purge air from system,
much air. Close manual
gas valve (shut off gas).
Module?
YES
connector on Control
Disconnect J13 connector
on Control Module. Measure
resistance across third (blue
wire) and fourth (brown wire)
wait for system to cool.
NO
Gas Valve. Does each
Disconnect harness from
Control Module
wire have continuity
between Gas Valve and
YES
terminals. Is resistance
between 1.0 and 1.2 kΩ?
Module
NO
YES
Replace Gas Valve Replace Harness
Enter Installer Menu, Boiler
Status. Scroll to most recent
Lockout Alarm A 0 0
Blocking too long error
Lockout Alarm or Blocking Error.
_ _ _ _ _
Diagnose corrective action using
appropriate Troubleshooting Tree.
Replace Control
47
Page 48
13 - TROUBLE SHOOTING
48
Page 49
13 - TROUBLE SHOOTING
YES NO
heat exchanger) hot?
Is boiler supply pipe (above
NO
hot?
YES
Is Heat Exchanger surface
drops.
temperature
Let all zones
run until water
Check high limit
Wait for boiler to
switches
and surface
temperature
cool down.
Replace Broken Switch
NO
YES
Error shows when safety circuit is
open. Remove J13 connector from
pink wires, is continuity available?
between two pins connected to two
control module. Check for continuity
Is continuity available?
YES NO
between two pins on sensor (two
Unplug molex connector on supply
Replace Control Module
temperature sensor. Check continuity
pins connected to two pink wires) .
on two pink wires on J13
Check for loose connections
safety temperature switch.
connector, supply sensor, and
NO
YES
Boiler red without enough water ow
through heat exchanger. Heat exchanger
Fix Loose Connections Replace Wire Harness
Check the following:
• Air in system?
• Verify water ow in system piping
exchanger temperature switch is open.
is over heated. Either high limit or heat
• Flush system if water is dirty.
49
Page 50
13 - TROUBLE SHOOTING
50
Page 51
Disconnect harness from High
Temperature Supply Switch and
Control Module J13.
Continuity from J13-5 to Switch
1? Continuity from J13-6 to
Switch 3 (continuity of the two
purple wires) ?
13 - TROUBLE SHOOTING
purple wires?
Control Module J13.
Disconnect harness from High
Check continuity of both purple
Temperature Supply Switch and
wires. Continuity available for both
51
Page 52
13 - TROUBLE SHOOTING
NO
3.7µA
ring rate)?
Status, Flame Signal.
to initiate boiler operation.
Follow Operating Instructions
Is ame signal greater than
Enter Installer Menu, Boiler
YES
(Boiler may be running at any
Replace Flame
Sensor and Burner
Module
Replace Control
Module
NOYES
Replace Control
52
Blocking Error E 3 5
False flame detect
_ P _ _ _
glass. Is flame present?
Inspect burner through sight
shutoff valve.
Turn Gas Shutoff
Valve clockwise to
Turn off manual gas
closed position.
Follow instructions
Follow instructions
Gas Valve.
TO APPLIANCE.
TO TURN OFF GAS
Replace Gas Valve.
APPLIANCE. Replace
TO TURN OFF GAS TO
Page 53
13 - TROUBLE SHOOTING
any remaining air in system.
Repair System Piping, remove
Water Cutoff.
YES NO
Is 24 vac at terminals 1 & 2
Disconnect harness from Low
Connect harness to Transformer.
(Between blue and yellow wires)?
53
Page 54
3
39
E
13 - TROUBLE SHOOTING
NO
gas temperature through sampling
Use thermal couple to measure ue
Interface signicantly different?
port. Is the measured temperature
and ue temperature reading on User
NO
Replace Control Module
YES
Interface.
Replace Flue Gas Sensor
YES
Blocking Error
Flue Gas Error
Read ue gas temperature on User
Is temperature higher than 200°F ?
system.
for boiler to cool. Fix
Boiler is over red. Wait
purging all air out of the
ow rate problem if any,
54
Page 55
13 - TROUBLE SHOOTING
NO
YES
sensor (2 Brown Wires)?
Is correct harness connected to return
Correct wiring
NO
properly oriented?
Is Heat Exchanger Pump
(Pump arrow pointing down?)
NO
YES
wire. Is wiring/pins in right order? Does
sure volts on pins of black wire and white
Verify order of pins on J2. Pin order should
be: empty, black (or red), white, green. Mea-
Install Heat
proper orientation
Exchanger Pump in
NO
pin have 0 VAC?
black/wire have 120 VAC? Does white wire/
Sensor
Replace Return Water
Module
Replace Control
antifreeze solution.
YES
Unplug molex connector on return
metal pins? Liquid might be water or
sensor. Is there moisture or liquid on
from connector.
Repair all leaks.
Check for leaks.
Remove all liquid
55
YES
Disconnect harness from
Return Water Sensor. Measure
950 to 33,000 ohms?
resistance using digital ohm
meter. Is resistance between
Replace Control Module
Page 56
13 - TROUBLE SHOOTING
+/- 2%
Blocking Error E 4 5
Net frequency error
_ P _ _ _
Is power supply between 59
and 61 Hz?
NO
YES
stabilized power
Provide frequency
supply rated at 60 Hz
NO
loose or faulty?
YES
Is power supply circuit breaker
NO
YES
Is field wiring loose or faulty?
breaker
Replace circuit
Module
Replace Control
Correct wiring
NO
blower motor system.
These error messages are displayed
Check wire connector to blower.
when the control board detects fault in
Check connector J9 on control board.
YES
Is any connection loose?
NO
Replace Control Module
YES
this correct the problem?
Replace blower motor. Does
Fix the connection.
properly
Boiler is operating
56
Page 57
13 - TROUBLE SHOOTING
NO
Module J5?
Water Sensor?
YES
Blocking Error E 5 1
Supply Sens Open
_ P _ _ _
Is harness plugged into Supply
Is harness plugged into Control
Insert Harness
NO
YES
Disconnect J5 from Control
Module. Using digital meter
Using digital meter measure check
Disconnect J5 from Control Module.
and Sensor. Continuity?
measure check continuity of
continuity of white wires between
white wires between Control
Control Board and Sensor. Continuity?
Replace Wires
Unplug J5 connector on Control
resistance between Supply
Using digital meter measure
resistance between terminals J5-11
Water Sensor terminals J5-11
board. Using digital meter measure
and J5-3. Measure resistance
NO
Resistance Chart?
range of the Resistance Chart?
of Sensor with digital meter.
and J5-3. Estimate
Estimate Sensor temperature.
Sensor temperature. Does it fall in the
YES
Does it fall in the range of the
Water Sensor
Replace Supply
Module
Replace Control
conductor
NO
YES
connected to High Voltage
Is field grounding conductor
Blocking Error E 4 6
Faulty ground
Terminal Strip 120 VAC (G)?
_ P _ _ _
Connect ground
Disconnect field wiring. Is
continuity between field wiring
neutral and ground less than
NO
10 ohms?
YES
conductor
Correct faulty ground
Module
Replace Control
Supply Water Sensor
Resistance
°F
Resistance Chart
°C
9K to 24K ohms
50 to 9010 to 32
3K to 9K ohms
90 to 130
32 to 54
2K to 3K ohms
130 to 150
54 to 66
2K to 1K ohms
150 to 200
66 to 94
57
Page 58
13 - TROUBLE SHOOTING
Return Temperature Sensor
2K to 1K ohms
2K to 3K ohms
3K to 9K ohms
°F°C Resistance
50 to 9010 to 32 9K to 24K ohms
Resistance Chart
90 to 130
32 to 54
130 to 150
54 to 66
150 to 200
66 to 94
Blocking Error E 5 2
Return Sens Open
_ P _ _ _
Temperature Sensor?
Is harness plugged into Return
Is harness plugged into Control
Module J5?
YES NO
Insert Harness
wires between Return
Check continuity of brown
Temperature Sensor and
Control Module J5-4 and J5-12
Continuity?
YES NO
Replace Wires
Replace Return
on chart?
YES NO
meter. Estimate Sensor
Measure Return Temperature
Measure Return Temperature
Sensor resistance with digital
Estimate Sensor temperature. Does
Sensor resistance with digital meter.
ranges shown in chart?
and resistance fall within
temperature. Do temperature
temperature fall within ranges shown
Temperature Sensor
Module
Replace Control
58
Page 59
13 - TROUBLE SHOOTING
shown in chart?
Disconnect wire harness from High
resistance across terminals 2 and 4.
Does temperature fall within ranges
Temperature Supply Switch. Measure
Resistance Chart
Supply Water Temperature Sensor
59
Page 60
Blocking Error E 6 5
Flue Sens Shorted
_ P _ _ _
Vent Temperature Sensor.
Disconnect wire harness from
Does resistance match
Measure Sensor resistance.
13 - TROUBLE SHOOTING
NOYES
estimated flue temperature?
Replace Vent
Temperature Sensor
in blue wires?
YES NO
Disconnect harness from
Control Module J5. Continuity
Replace wires
Module
Vent Temperature Sensor
2K to 1K ohms
2K to 3K ohms
3K to 9K ohms
°F°C Resistance
50 to 9010 to 32 9K to 24K ohms
Resistance Chart
90 to 130
32 to 54
130 to 150
54 to 66
150 to 200
66 to 94
Disconnect harness from
Blocking Error E 6 0
Return sens shorted
_ P _ _ _
less than 50 ohms?
Measure resistance across
Return Temperature Sensor.
sensor terminals. Is resistance
YES NO
Disconnect harness from
Control Module J5. Measure
Sensor
resistance between brown
12. Is resistance less than 50
wires at terminals J5-4 and J5-
Replace Control
NOYES
ohms?
Module
Replace Control
Replace wires
Replace Return Water
60
Page 61
14.1 Connection Diagram
14 - WIRING DIAGRAM
61
Page 62
14 - WIRING DIAGRAM
14.2 Schematic Diagram of Ladder Form
62
Page 63
15 - GLOSSARY
• ANSI - American National Standards Institute, Inc. oversees creation and maintenance of voluntary consensus standards, including ANSI Z21.13/CSA 4.9: Gas-Fired Low Pressure Steam and Hot Water Boilers.
• ASTM - American Society for Testing and Materials. ASTM International is one of largest voluntary standards development organizations in world trusted source for technical standards for materials, products, systems, and services. Known for their high technical quality and market relevancy, ASTM International standards have important role in information infrastructure that guides design, manufacturing and trade in the global economy.
• AUTHORITY HAVING JURISDICTION - Individual or organization adopting and enforcing codes, rules, and by-laws governing various concerns of community.
Commonly referred to as "nal authority" for any matters
• HIGH-VOLTAGE - Circuit involving potential of not more
relating to LIFE SAFETY and BUILDING CONSTRUCTION within a community.
• Btu - Abbreviation for British Thermal Unit. Quantity of
• IGNITER - Device utilizing electrical energy to ignite gas
heat required to raise temperature of 1 pound of water 1°F.
• LEAK CHECK - Operation performed on gas piping
• BURNER - Device for nal conveyance of gas or mixture
of gas and air, to combustion zone.
• LOW WATER CUTOFF - Device constructed to
• COMBUSTION - Rapid oxidation of fuel gases
accompanied by production of heat or heat and light. Complete combustion of fuel is possible only in presence of adequate supply of oxygen.
• COMBUSTIBLE MATERIAL - Materials made of or
surfaced with wood, compressed paper, plant bers,
• LOW-VOLTAGE - Circuit involving potential of not more
• METRIC GAS METERS
or other materials capable of being ignited and burned. Such material shall be considered combustible
even though ame-proofed, re-retardant treated, or
plastered.
For example: Gas Meter measures 0.1 cubic Meters in 100
• CONDENSATE - Liquid separated from ue gas due to
seconds
reduction in temperature.
• DIRECT VENT BOILER - Boiler constructed and installed so all combustion air is derived directly from outdoors and all vent gases are discharged to outdoors.
• PRESSURE TEST - Operation performed to verify gas
• DRAFT - Pressure difference causes gases or air to ow
through a chimney, vent, ue or appliance.
• PURGE - To free gas conduit of air or gas, or mixture of
• FLA - Full load amps.
• GAS PIPE SIZES - Table 14
NATURAL GAS
Length of Pipe
- Ft.
20 92,000 190,000 350,000 625,000
40 63,000 130,000 245,000 445,000
60 50,000 105,000 195,000 365,000
Length of Pipe
- Ft.
20 131,000 216,000 189,000 393,000
40 90,000 145,000 129,000 267,000
60 72,000 121,000 103,000 217,000
Pipe Capacity - BTU Per Hour Input Includes Fittings
1/2” 3/4” 1” 1 1/4”
PROPANE GAS
Pipe Capacity - BTU Per Hour Input Includes Fittings
Copper Tubing
(Outside Diameter)
5/8” 3/4” 1/2” 3/4”
Iron Pipe
than 600 volts and having circuit characteristics in excess of those of low-voltage circuit.
at main burner.
system to verify system does not leak.
automatically cut off fuel supply when surface of water in boiler falls to lowest safe water level.
than 30 volts.
MBH =
MBH =
127,116 x cu meters
Seconds
127,116 x 0.1
100
= 127 MBH
tight integrity of gas piping following its installation or
modication.
gas and air.
• FLUE GASES - Products of combustion plus excess air
in appliance ues or heat exchanger.
• PURGE TIME - Period of time intended to allow for dissipation of any unburned gas or residual products of combustion.
63
Page 64
15 - GLOSSARY
• QUALIFIED AGENCY - Any individual, rm, corporation,
or company engaged in and responsible for:
• Installation, testing, or replacement of gas piping, or connection, installation, testing, repair or servicing of appliances and equipment.
• Experienced in such work.
• Familiar with all precautions required.
• Complies with all requirements of authority having
jurisdiction.
• SAFETY RELIEF VALVE - Valve designed to relieve pressure in hot water supply system when pressure exceeds pressure capability of equipment.
• SAFETY SHUTOFF DEVICE - Device that will shut off gas supply to controlled burner in event source of ignition fails.
• SEDIMENT TRAP - Gas piping arrangement designed to collect any liquid or solid contaminant before reaching gas valve.
• VENT - Passageway used to convey ue gases from
appliance vent connector to outdoors.
• VENTING SYSTEM - Continuous open passageway from of appliance vent connector to outdoors for purpose of
removing ue or vent gases.
64
Page 65
APPENDIX A - CONTROL MODULE
1.1 Introduction
The boiler is equipped with a programmable electronic control and user interface module.
1.2 Operation
• Display: 4x20 character LCD screen to show boiler status.
• Function Keys
Key Description
- Manual Lockout Reset
- Enter/Exit user menu
- Go to previous screen
- Select a menu item
- Conrm new parameter value
- Scroll up to next menu item
- Increase value
- Scroll down to next menu item
- Decrease value
Operation with LCD character display module
1.3 Status Indication
The following status screens can be displayed:
Boiler Status Indicator
F = Flame Detected
SERVICE Reminder
P = Central Heating System pump On B = Combustion Air Blower On S = Safety Relay Check G = Gas Valve Open D = DHW Pump On
Combustion Air Blower
Speed Indicator
Service Reminder Indicator Boiler in Standby Mode Boiler Supply Water
Temperature Indicator.
Boiler Running in Central Heat mode
Boiler Running in DHW mode
Lockout Alarm Indicator
Error code and short text description is displayed Press 'Reset" key for manual reset.
Blocking Error in DHW
Error code and short text description is displayed Boiler automatically returns to Standby Mode when condition is eliminated.
65
Page 66
1.4 Sequence of Operation
Operational State User Interface Display Explanation
APPENDIX A - CONTROL MODULE
No
Heat
Demand?
Yes
DHW CH
Pump on
Supply
Temperature
<Setpoint?
Yes
15 Second
Prepurge
No
Standby: No Demand
Boiler operates in standby mode until demand for Central Heat (CH) or Domestic Hot Water (DHW) is detected.
CH or DHW pump is turned based on type of heating demand.
(CH call is illustrated)
Control Module compares supply temperature to set point. Boiler proceeds to ignition if supply temperature is less than set point.
Combustion Air Blower speed modulates to prepurge setting for 15 seconds.
Ignition
Sparking
After 2 seconds
Sparking initiated sequence.
66
Page 67
1.4 Sequence of Operation
Operational State User Interface Display Explanation
After 2 seconds
Flame
Detected?
No
Gas Valve Energized
Yes
Lockout
Error A21
APPENDIX A - CONTROL MODULE
Note:
5 Ignition
trials,
then
Lockout A01
If ame detected before Gas Valve opens
during ignition boiler will lockout.
Please refer to troubleshooting guide.
Gas Valve energized to deliver air/fuel to burner.
After 3 seconds
Flame
Detected?
Yes
Heat Demand
Met?
No
No
Simultaneous
DHW + CH
Demand?
Yes
DHW
Priority
Mode
No
See Max DHW
Priority Time
30 second
post purge
Yes
Setting
If ame undetected after 3 seconds boiler
will de-energize Gas Valve and enter post purge mode for 30 seconds.
Ignition attempted 5 times before lockout.
Boiler will run provided all operational and safety devices are within limits
Refer to for more information.
Control module adjusts ring rate
according to heating demand. When Boiler detects demand met, will enter post purge mode then standby mode.
If simultaneous demand for Central Heat and DHW, boiler will enter DHW Priority Mode.
Priority mode limits amount of time boiler can run in DHW mode to meet CH demand.
Max DHW Priority Time setting determines maximum time allowed for DHW heating mode.
Please refer to section Appendix A section
1.5 for more information.
67
Page 68
1.5 User Menu
APPENDIX A - CONTROL MODULE
User Interface Display
Boiler operates in standby mode until demand for Central Heat (CH) or Domestic Hot Water (DHW) is detected.
Explanation
STANDBY
User Menu (Press Menu button on user interface to access User Menu)
User Menu structure includes:
• ‘Boiler Status’ submenu– User can monitor general boiler status parameters such as sensor temperatures and pump operation.
• ‘Settings’ submenu – User can view CH , adjust DHW supply water set points and also select control language.
User Menu
• ‘Cascade Status’ submenu – Boiler set to function as part of multiple boiler installation; submenu used to view runtime parameters. See Multiple Boiler Manual. (This line is not shown if boiler is not in cascade system).
Boiler Status
Supply Temperature set point displayed.
If boiler running in CH mode, CH set point displayed.
Note:
• While running in Outdoor Reset mode, this value may change in proportion with the outdoor temperature.
• If the boiler is running in DHW mode, the DHW supply set point is displayed.
Several boiler runtime parameters can be viewed while in ‘Boiler Status’ submenu.
Operational status of pump system also shown.
Information available during all states of boiler operation. Sensor values with troubleshooting tree used to diagnose typical problems.
68
Page 69
APPENDIX A - CONTROL MODULE
User Interface Display
Setting Range: 104° F to 195° F (40° C to 91° C) Default Value: 140° F (60° C)
Settings
Explanation
Adjust CH set point to hydronic system design while in Operating in CH Mode = 0 (CH with Thermostat) or 3 (Permanent Demand).
In CH Mode = 1 (CH with Thermostat and Outdoor Reset) or 2 (CH with Full Outdoor Reset). Display will change to ‘OD Reset Setpoint’ and cannot be changed. Controller calculates set point based on outdoor temperature.
Note:
For explanation of available CH heating modes, refer to ‘CH Mode’ section located in ‘CH Settings’ submenu in Installer Menu.
DHW set point determines supply water temperature set point while operating in DHW mode.
Setting Range: 104° F to 195° F (40° C to 91° C) Default Value: 180° F (82° C)
U
ser interface temperature unit of measure is selected using
‘Change Temperature Units’ screen.
Fahrenheit and Celsius available.
69
Page 70
APPENDIX A - CONTROL MODULE
User Interface Display
Installer Menu
Installer Menu
Explanation
Installer Menu structure includes:
• User 'Menu' can be accessed by pressing 'Menu' key on user interface.
• Installer 'Menu' can be accessed by pressing and holding the 'Enter' key continue to hold and at the same time press and hold the 'Menu’ key for 5 seconds. (You must press and hold the 'Enter' key then press and hold the 'Menu' key).
• ‘Boiler Status’ submenu – Monitors detail boiler status parameters such as error codes.
• ‘Boiler
• ‘CH Settings’ submenu –
Heating settings including outdoor reset curve parameters and boost function.
submenu – general boiler settings.
signal, fan speeds and stored
advanced Central
Boiler Status
• ‘DHW Settings’ – Domestic hot Water control settings such as DHW priority time.
• ‘Cascade Settings’ - Refer to Multiple Boiler Manual.
• ‘System Test’ – Tool aids setup of boiler installation or
diagnosis of common problems.
Combustion air Blower provides through Combustion and Vent systems.
Fan speed status screen indicates actual and operational fan speeds in RPM, high, low and ignition power speed settings.
Settings are for information only to aid in troubleshooting.
Boiler equipped with ionization rod to detect presence of combustion using method. When is present, ionization rod measures small DC offset current across to ground (i.e. burner surface).
‘Flame’ screen in ‘Boiler Status’ submenu displays information regarding ionization system; for information only and used in diagnosing combustion problems. See troubleshooting guide.
70
Page 71
APPENDIX A - CONTROL MODULE
User Interface Display
Installer Menu
Explanation
Control module logs successful and failed ignition attempts. Information accessed in ‘Ignition Attempts’ Screen as shown.
Ignition attempts are stored in non-volatile memory and are retained in event of power failure.
Figure A-1 Typical Ignition Cycle
Boiler Status
Following control features are implemented to ensure safe and reliable operation of Combustion System:
False Flame Detection
Re-ignition
Intermittent Operation
Flame out too late
Safety relay test
UL3563 High Limit Temperature Device
If ame is detected at end of pre-spark
period (Ignit_0) than lockout will occur.
If at end of safety period no ame
detected control will go to post-purge removing unburned gas. Re-ignition attempt started following same cycle. Number of re-ignition attempts limited to 3 after which lockout occurs.
Boiler can be ring continuously for 24
hours. Burner switched off and restart sequence follows.
If ame detected after post purge lockout
follows.
In Safety ON/OFF state correct operation of safety relay is proved before ignition.
Boiler comes equipped with UL353 approved temperature high limit device.
Gas Valve de-energized when supply temperature exceeds 203°F lockout follows.
71
Page 72
APPENDIX A - CONTROL MODULE
User Interface Display
Boiler Status
Explanation
Boiler stores information regarding total CH and DHW run time in hours.
Data stored in non-volatile memory and retained in event of power failure.
Boiler logs last 16 blocking errors and 16 lockout errors in non-volatile memory. Information retained in event of power failure.
Most recent blocking error code and its text description displayed with elapsed time in hours since logged.
Optional Computer interface Kit purchased separately to view extended error code history
‘Address Selection” screen used to set boiler position in multiple boiler cascade installation. Refer to Multiple Boiler Installation Manual.
Default setting of ‘0’ indicates boiler is operating in single boiler mode.
Boiler Conguration
Boiler incorporates integrated Low Water Cutoff device (LWCO) that disables boiler when low water condition exists. LWCO device located at high point of internal Heat Exchanger loop to detect low water condition.
Detection of low water condition will result in blocking error; boiler will automatically resume normal operation when proper water level returns. Refer to Troubleshooting Guide.
LWCO device can be disabled for diagnostic purposes or where applicable code permits.
72
Page 73
APPENDIX A - CONTROL MODULE
User Interface Display
Explanation
Two pump modes are available:
1.
Pump Mode = 0 ‘CH or CH&DHW’
• In this mode either CH or DHW pump terminal is energized depending on type of demand (CH or DHW).
• CH and DHW pumps are never energized at the same time.
• In the case of simultaneous call for both CH and DHW, the
energized pump depends on whether the boiler is currently supplying CH or DHW demand. Refer to DHW Priority settings below.
• This is typical of hydronic system design with separate CH and DHW Pumps.
2.
Pump Mode = 4 ‘System Pump’
• In this mode only one external system pump is installed in hydronic system. This pump will energize independent of type of demand (CH or DHW).
Boiler Conguration
• Connect this pump to CH/System Pump electrical terminal block. See page 35 for diagram.
• DHW pump terminal does not function.
• This is typical of hydronic system design which utilizes zone
valves for all CH zones and DHW indirect tank.
Note:
• Pump Mode selection depends on electrical and
hydronic system design. Please refer to sections 5 and 8 for recommended hydronic piping and electrical
congurations.
• Internal heat exchanger pump is energized anytime
demand exists regardless of Pump Mode setting or type of demand (CH or DHW).
'Service Reminder’ feature allows the installer to enable or
disable a service reminder notication on the User Interface at a predened interval .
Service reminder does not affect operation of boiler in any way. It is only a reminder to End User that routine preventative
maintenance is required by qualied service technician.
Allowed Range: 1 to 999 days
73
Page 74
APPENDIX A - CONTROL MODULE
User Interface Display
CH Settings
Explanation
4. Central Heating (CH) modes available:
• CH Mode = 0 ‘CH with Thermostat’
• Boiler will attempt to satisfy CH demand while CH thermostat input is closed.
• Boiler will modulate its ring rate to maintain CH set
point and match system heat load.
• CH set point adjusted in ‘Settings’ submenu under ‘User Menu’
• CH Mode = 1 ‘CH with Thermostat and Outdoor Reset’
• Boiler will attempt to satisfy CH demand when CH thermostat input is closed.
• Boiler will modulate its ring rate to maintain CH set
point and match system heat load.
• CH set point calculated as function of outdoor temperature using outdoor reset curve. See gure A-2
• CH Mode = 2 ‘CH with Full Outdoor Reset’
• CH demand is determined by outdoor temperature and Warm Weather Shutdown temperature.
• Boiler will permanently attempt to satisfy CH demand, when CH demand is available.
• CH thermostat input is ignored.
• CH set point calculated as function of outdoor temperature using outdoor reset curve. See gure A-2
• CH Mode = 3 ‘CH with Permanent Demand’
• CH demand is prermanently on.
• Boiler will permanently attempt to satisfy CH
demand.
• CH thermostat input is ignored.
• CH set point is adjusted in ‘Settings’ submenu under
‘User Menu’
Note:
• Once CH demand is satised (i.e. CH thermostat opens or boiler determines its minimum ring rate exceeds system
heating load):
• Burner shuts off, boiler enters post purge.
• CH pump continues to run for 30 seconds.
• Control will wait until Anti-cycle time of 180 seconds elapses before boiler res again. Prevents short-
cycling.
• The internal heat exchanger pump is energized anytime demand
exists regardless of Pump Mode setting or type of demand (CH or DHW).
74
Page 75
User Interface Display
Reset Curve Design Points , A and B, d B s B f
Allowed Range: 35°F to 100°F (2°C to 38°C) Default Setting: 70°F (21°C)
A
Allowed Boiler Range: 60°F to 195°F (40°C to 91°C)
Default Boiler Setting:180° F (82°C)
B
Allowed Boiler Range: 35°F to 120 F (2°C to 49°C) Default Boiler Setting: 100°F (37°C)
Allowed Outdoor Range: 35°F to 85°F (2°C to 29°C) Default Outdoor Setting: 70°F (21°C)
CH Settings
100
Explanation
If outdoor temperature is greater than Warm Weather Shutdown Temperature, demand for CH blocked and pumps stopped.
Boiler capable of operating in Outdoor Reset Mode when included Outdoor Sensor is connected and proper CH Mode selected.
If CH Mode = 1, ‘Outdoor Temperature Reset with Thermostat’ or 2, ‘Full Outdoor Reset’ boiler will adjust CH set point proportional to outdoor temperature as
Outdoor reset curve adjusted by modifying Design and Mild Weather reference temperatures. See points A & B of Reset Curve below.
Calculated CH set point always limited between ‘Reset Curve Boiler Minimum/Maximum’ temperatures. See points C & D of Reset Curve below.
Figure A-2 Outdoor Reset Curve
Calculated supply temperature follows thick black line in graph below based on outdoor temperature.
220
200
180
160
A
efine a s traignt line . oile r Min and Max, C and D, define a
ection on the stra ignt line.
oile r supply temperature Setpo int
D
ollows the bold line s ections
Allowed Min. Range: 40°F to 180°F (4°C to 82°C) Default Min. Setting: 70°F (21°C)
Allowed Max. Range: 80°F to 195°F (27°C to 91° C) Default Max. Setting: 180°F (82°C)
C D
140
120
100
Supply Temperature Setpoint F
Suppy Temperature Setpoint °F
80
0 20 40 60 80 100
Outdoor Temperature °F
Outdoor Temperature F
C
B
Note:
• Modes only function when outdoor temperature sensor connected.
• If ‘Open’ outdoor sensor detected CH set point equal to ‘Boiler Reset Curve Design’ temperature.
• Outdoor temperature used for CH set point calculation measured once a minute and averaged with previous measurement to compensate for rapid outdoor temperature variations.
75
Page 76
APPENDIX A - CONTROL MODULE
User Interface Display
CH Settings
Explanation
Outdoor reset boost function increases CH set point by increment (‘Temp’) if CH demand continues beyond pre-set time limit (‘Time’).
CH set point will continue to increase until set point reaches
0
195°F / 91°C
Allowable Temperature Increment: 0..36 °F (0..20 °C) Default Temperature increment: 0 °F (10 °C)
Allowable Time Delay: 1..120 minutes Default Time Delay: 20 minutes
Maximum boiler power in CH mode limited by adjusting ‘Maximum Power CH’ setting. Boiler will not exceed this value while operating in CH Mode.
Allowable Range: 1..100% Default Setting: 100%
Two DHW modes are available
• DHW Mode = 0 ‘No DHW
DHW Settings
• DHW Mode is disabled
• The DHW thermostat input is ignored and the DHW
pump is not used.
• DHW Mode = 2 ‘DHW Store with Thermostat’
• Boiler reacts to DHW demand when DHW thermostat
input closes.
• Boiler modulates to meet DHW demand similar to CH Mode except DHW set point is used. DHW set point set in Settings’ submenu found in 'User Menu’.
• Simultaneous CH & DHW demands handled using DHW Priority Timing. See ‘DHW Maximum Priority Time’ setting below.
Note:
• Outdoor reset function disabled while operating in DHW Mode.
• Typical when using a DHW indirect storage tank.
• After DHW demand satised, boiler enters post purge
mode and DHW pump continues to run for 15 seconds.
76
Page 77
APPENDIX A - CONTROL MODULE
User Interface Display
Allowed Range: 1 to 60 Minutes Default Setting: 30 Minutes
DHW Settings
Explanation
Maximum time boiler operates in DHW mode limited by DHW Maximum Priority Time Setting.
Priority timer starts when both CH and DHW demand is present. Boiler will switch from DHW back to CH operation after Maximum Priority Time has elapsed.
CH demand then has priority until Maximum Priority Time has elapsed.
Process repeats until either CH or DHW demand satised.
System test can be activated via installer menu for testing
system at xed power rates.
Boiler can be started without CH or DHW demand being present. System Test has priority over any system demand while test mode activated.
System test mode automatically ends after 30 minutes boiler resumes normal operation.
The following modes are available:
System Test
• Disabled
• Low power - Burner starts. After ignition period has nished the burner stays at low power
• Ignition power - Burner starts. Stays at ignition power
• High power - Burner starts. After ignition period has nished burner stays at high power.
Note:
• Before running system test modes, check if hydronic system capable of dissipating heat.
• Both heat exchanger and CH pumps are activated during system test.
• During System Test Mode, boiler will run at xed power
rates until supply water temperature is 93°C/195°F
• All other safety functions remain active while in System Test Mode.
77
Page 78
NOTES
78
Page 79
Company Address & Phone #Company Name & Tech InitialsService PerformedDate
79
Page 80
CONDENSING
GAS BOILER
Models 075 & 100
ECR International, Inc. 2201 Dwyer Ave. Utica, NY 13501
www.ecrinternational.com
Loading...