This document has been created to give an insight into the required service and
troubleshooting needed to repair a system. The information held herein will grow
and be modified with each new understanding of system design that is made. This
information is not for use as customer documentation and should not be modified
as such without the written permission of EcoWater CHC, Schertz, Texas.
When trouble shooting a system it is very important to
remember the following:
WARNIN
WARNIN
WARNIN
WARNIN
WARNIN
HIGH VOLTAGE, Electrical Shock and or
Death can occur if safety is not your #1 priority.
Main Electrical Service is normally 480 VAC
Control Voltage is 120 VAC or 24VDC
Use Caution When Servicing This Unit
ONLY Qualified Electricians Should Attempt
Any ELECTRICAL Service.
Always disconnect electrical service before attempting service
on any items found within this skid.
Servicing of equipment should be completed only in a well
ventilated area.
Most Items located on the skid are Very Heavy.
Use all appropriate lifting methods and safety precautions
WARNIN
WARNIN
WARNIN
while lifting or moving items.
In case of Fire, use appropriate notification methods of local
fire departments and facility personnel. Turn OFF all power
sources immediately.
DO NOT operate the pump motor if the safety guard has been
removed from its fan.
DO NOT operate any motor or electrical device on this skid in
the presence of standing water or direct rain.
6
7
Shutting Down the CHC System upon EMERGENCY.
1. Turn the power disconnect OFF on the CHC Motor Controller. Verify the CHC pump has
stopped operation (look for motor rotation, and listen for the discontinuation of the standard
CHC operational sound).
2. Close one of the Isolation valves found on either side of the basket strainer.
3. Close the Isolation valves found on the towers if necessary.
Shutting Down the Filtration Systems upon EMERGENCY:
1. Turn the power disconnect OFF on the Filtration Motor Controller. Verify the pump has
stopped operation (look for motor rotation, and loss of pressure on gauge)
2. Close one of the Isolation valves found on either side of the basket strainer.
3. Close the Isolation valves found on the towers if necessary.
2.0TERMINOLOGY
The following words are referenced throughout this manual, it is important that
you have an acceptable understanding of the following words:
Actuator- A motorized system used to control a valve or positioning system. Actuators come in
many different sizes and types. It is important to identify what type of actuator you need, some
may be air operated (ZGF) or electrical. Call EcoWater CHC while you are looking at the actuator
to make sure you get the appropriate replacement parts. An actuator can be powered by Air, AC
voltage or DC voltage and it is important to understand what you have BEFORE you get a
replacement.
Actuated Valve- An actuated valve references any valve that is controlled by a motor. When
replacing an actuated valve it is important to record the type (Grey is VSI, Blue is Jordan, and
Yellow is Apollo, Red can be Rotork or J&J), it is also important to record the valve size and type
and control voltage (120VAC or 24VAC or 24VDC).
Alkalinity (Alk.): Alkalinity is a measurement of the buffering capability of water with the
addition of acid. With the addition a certain amount of acid, pH can lower dramatically for water
with low alkalinity, but pH only decreases slightly when its alkalinity is high. The main
contributors of alkalinity are carbonate ions, bicarbonate ions, hydroxide ions, and dissolved CO
present in water. For most of waters, bicarbonate (HCO
-
) is the dominant contribution to
3
alkalinity. Alkalinity affects both corrosion and scaling tendencies.
2
Amiad (Filtomat)- The automated filtration systems added to some CHC offerings. These
automated systems require appropriate sizing. And utilize a screen to capture the debris from the
filtration water flow. An automated screen cleaning regime is used to clean debris from the screen
and flush it to waste. We utilized the M100 Filtomat filters and you can learn more from
www.amiad.com or from the appropriate Service Manuals.
Approach Temperature- This measurement is available if a chiller is being used. It references
the efficiency of the chiller tubes at removing temperature from the refrigerant and the closed loop
system. The approach temperature references the difference between the cooling water discharge
temperature and the refrigerant temperature. Approach temperatures are only accurate if the
Chiller is at 100% load. It can be used as an indication of scale within the tubes. If the approach
temperature stays high, normally above 10 degrees than scaling could have occurred. Further
analysis of the tubes are required for verification.
Bacterial Colony Counts- When required the water sample is sent to CHC overnight in a
refrigerated container. This container should only used a refrigerated gel (NO ICE) to maintain
temperature. The sample should be marked to ensure appropriate processing by CHC. The sample
is placed into specially prepared dishes, and left to incubate. Once the incubation is complete, the
colonies are counted and a report is prepared for distribution. The normal results of this test are
given as colonies/square cm.
Bag Filters- Bag Filters can be used in line or side stream they remove any debris within the
filtration water flow that is larger than the bag micron size. It is important to know what type of
8
9
bag filter housing you have to be able to order appropriate bags for replacement purposes. CHC
recommends the use of dual bags within these systems. If used in a side stream arrangement, we
recommend approximately 20 % of the filtration water flow. If the Bag Filter is in line (100% of
flow), then a bypass system must be utilized to allow filtration flow to continue when the bag
blinds off.
Ball Valve- A ball valve is any valve that utilizes a ball for the valve mechanism, as the ball
rotates a hole within the valve aligns with the inlet and outlet connections and water is allowed to
flow.
Basket Strainer- The basket strainer is an initial filtering element that is placed in front (suction)
of the pump. This element consists of a housing and basket. The basket has holes placed into it
that initially remove any larger debris from the water flow that will not pass through the pumps
impeller. The basket strainer holes are normally specified as smaller than the pump specifications
indicate. The basket is required to be emptied at appropriate intervals to make sure the pump’s
flow is not restricted. Basket strainers come in many varieties and manufacturers and require
appropriate maintenance to ensure no air intake into the system. CHC will normally oversize the
basket strainer to make sure that the time between cleanings is maximized.
Biodispersant- A Biodispersant is a chemical surfactant that is used to loosen any Biofilm that
may be on the walls of a cooling system. It is basically a soap that loosens up the film and allows it
to flow with the water to the CHC chamber for treatment.
Biofilm- Biofilm is a growth of Biological material on surfaces within a system. This could
include a growth of algae or other films on surfaces that could decrease the efficiency of the system
as well as harbor other detrimental bacterial growths like Legionella. In many cases a Dispersant
must be used to dislodge this film to allow it to be destroyed by the CHC treatment or biocides.
Blow Down- Blow Down is the water that is removed from the system to control the conductivity
levels within the system. Blow Down is preferred from a water source within the system that
contains the highest conductivity. As Blow Down water is removed it is replaced by fresh Make
Up water.
Calcium Hardness (Ca): Calcium is one of the principle elements making up the earth’s crust.
Calcium normally gets into water when rain water causes calcium carbonate to leach from
limestone deposits in the soil. It is the major contribution to water hardness. Calcium aids in the
formation of soap curds during cleaning and in some instances can form hard scale.
Cartridge filters- Cartridge Filters can be used in line or side stream they remove any debris
within the filtration water flow that is larger than the cartridge’s micron size. It is important to
know what type of Cartridge filter housing you have to be able to order appropriate bags for
replacement purposes. CHC recommends the use of easy clean cartridges within these systems to
make cleaning easier. If used in a side stream arrangement, we recommend approximately 20 % of
the filtration water flow.
Centrifugal Separator- A centrifugal separator is a vessel that utilizes a speed centrifugal
spinning to separate out the heavier than water particles from the water stream. It is very important
to size a separator according to the filtration flow to make sure appropriate separator forces are
10
achieved and debris removed. Centrifugal Separators do not have any moving parts but do require
an additional debris purging system.
CHC Chamber- The chamber is made up of many parts and normally consist of a common
manifold (linking pump to chamber), riser tubes, end caps, nozzles, and chamber. Most CHC
chambers assemblies utilize Groove lock fittings for connecting the components. The chambers are
specified by their GPM flow rate. Chambers can be designed to increase their bacterial kill rates
for specific applications. All current production chambers contain components that are made of
stainless steel. Older systems could utilize plastic, nylon, or stainless steel construction. Chambers
can be made to connect directly to a pump or even remotely. The remote chambers differ in their
construction, due to the pump being placed remotely to the chamber. Each chamber requires
specific applied pressures to perform appropriately. Some chambers allow for the monitoring of
created vacuum by a vacuum gauge. The back pressure of the chamber must be verified and should
not exceed 5 mmHg. The CHC sizing reflects the water analysis as well as the overall volume of
the system being treated. It is important to understand this when sizing a CHC treatment system.
Normally the CHC system is sized to see the entire system water at least seven times each 24 hour
period. There are several parts that make up a chamber, they include the center weldment, nozzles,
end caps (ends of nozzles) and end bells (covers for the nozzles that attach to the center weldment.
CHC Control Station or CCS- This is a Programable Logic Controler (PLC) who’s software was
made by EcoWater CHC to control and monitor the filtration and CHC skid’s operation.
Chemical treatment- Chemical treatments are costly and must be maintained continuously. From
making sure chemicals are on site at all times, to making sure that bacteria does not become
resistant to the treatment, Chemical treatment regimens must be continuously monitored and
adjusted for the changing conditions. It is this service that makes most customers loyal to chemical
systems, while it is also the need for this service that make most customers wish they had a reliable
non-chemical treatment system.
Chloride (Cl-): Like Sodium (Na), most chloride salts are very soluble in water. They can cause
corrosion at high levels. Chloride is used to calculated cycles of concentration because it is stable in
cooling water systems.
Clearance for Electrical Panels- In general we must meet the local regulations at the customer
site. However EcoWater CHC recommends at least 36” clearance in front of the motor starter for
electrical servicing.
Cooling Towers- A cooling tower is part of a system that uses water as a cooling agent within a
larger system. This system, as in air conditioning, passes this cool water from the cooling tower to
a chiller that is the similar to a heat exchanger. The chiller is the link between the cooling tower
water, and the water used within the building’s for air conditioning. The chiller uses a refrigerant
like FREON, to remove the heat from the buildings cooling water and passes that heat back to the
cooling tower’s water. Within this type of system, the customers want to decrease their water
usage by increasing the recycling rate of water within the cooling tower. But as they increase the
times water is reused, the dissolved solids within the system increase due to evaporation. These
dissolved solids are what is left behind as the water evaporates out of the system. Traditionally,
chemicals were used to control scale and corrosion and reduce any bacterial growths. The only
problem with chemical treatment programs is, in many cases, it takes one chemical to dissolve the
11
solids, one to reduce corrosion rates, one to keep the solids from scaling up in the chiller and one or
more to reduce the bacterial levels and it relies on blow down to remove any dissolved solids. A
filtration system is the only system that can physically remove solids from the tower water and
most chemically treated systems do not use filtration. The types of chemicals and amounts vary by
the type of system being treated, the season, the external sources of particulate, the type of bacteria,
the temperature, and on and on and on. Normal cooling towers utilize a basin (water storage site),
cooling media (normally called fill, this normally plastic structure allows water to drain down it
surface while air is passed through the fill to cool the water, a pump to move the water up above the
fill to the spray nozzles that distribute it equally over the fill and a fan to force air through the fill.
Conductivity: Conductivity is defined as the ability of an aqueous solution to carry an electric
current and can be easily measured by a conductivity meter. It is used to estimate Total Dissolved
Solids (TDS). CHC has used several types of Conductivity meters in the past. Walchem WCT
series is the most common, while we have also used the LMI brands or utilize the CCS.
Corrosion - Most metals used in cooling water systems are very susceptible to corrosion. Keeping
surfaces clean is the most important aspect of preventing corrosion, since under-deposit corrosion
can take place and result in serious damage. Corrosion can be uniformly distributed throughout the
system or it can be localized, causing severe pitting and rapid equipment failure. There are various
corrosion inhibitors used in chemical treatment.
Customer Service Report- This report is the record of what service was conducted at the
customer’s site. In most cases the customer will be given a copy of this report at the time of
service. The report is then completed with any appropriate test results (Dip Slide Test), any
appropriate comments and then sent to EcoWater CHC at the end of the week for processing. A
Service Order will be completed at EcoWater that will include any Water Analysis results and
recommendations for continued service in the future. The Service Order will be sent to the
appropriate personnel with any recommendations for modifications.
Customer System Survey- A Customer Survey is a report that is completed at the time of a
monthly or quarterly service that is a detailed listing of the equipment at the customer site as well
as specific application information that is needed to identify equipment or usage. It is a good idea
that as pumps are replaced or piping modified that this survey is updated. If allowed pictures are
worth a thousand words and will make identification of system parts much easier, but always verify
with the customer before any pictures are taken, if pictures are even allowed. This report is sent to
EcoWater CHC to ensure appropriate system information for phone support and other reporting
needs.
Cycles of Concentration- It is a comparison of the concentrations of dissolved salts in makeup
water and basin water. Because of evaporation, H2O left water to evaporate and leave the dissolved
salts in cooling water. So the concentration of the dissolved salts in the cooling tower water will
increase. Cycles of 2 means the concentration of certain species (like sodium or chlorides) in the
cooling tower water are 2 times the concentration in the makeup water. As cycles increase the less
make up water is required to maintaining the water level because there is less blow down and more
water remaining the tower basin. Higher CoC are helpful to control bacteria levels.
Descaler- Descalers are chemicals that are used to dissolve scale for cleaning purposes. EcoWater
uses the Rydlyme product.
12
Differential Pressure Switch- The differential pressure switch is a switch that compares two
pressure sources and closes an electrical switch upon the differential pressure reaching the specified
set point.
Dip Slide Testing- The Dip Slide test can be used to verify the concentration of bacteria within the
system. This test requires a Dip Slide to be placed into the system water and then placed aside for a
period of 48 hours for results to be taken. Results of the test should be recorded on the copy of the
Customer Service Report that is sent to EcoWater CHC at the end of the week. Please refer to the
paper “Dip Slide Testing” for instructions on how to conduct this type of test.
Electrical Supply- The electrical supply is the power that will be supplied for the use by the CHC
skids. Normally a CHC system utilizes a 480 Volt, three phase supply. This is the main supply
and is normally the type of electrical supply used directly by the pump’s motor. Three phase
voltage works very well for industrial type applications because it lends itself very well for pump
use. The electrical supply may also be stepped down inside of the motor starter for use as a control
voltage.
Evaporative Condensers- Similar to cooling towers, except the condenser is also the heat
exchanger. Condensers are normally used in industries where refrigeration is required. The
condenser passes its water directly over the hot refrigeration lines that pass through it. It too,
suffers from the same type of problems as found in cooling towers. It is made up of a basin, heat
exchanging tubes, pump and nozzles and a fan to move the air. The condensers can be used wet
(with water) or dry (no water, normally only used in the winter time dry).
Flow Meter- CHC has utilized a flow meter to aid in the flow setting through the corrosion rack.
The normal flow that we try to achieve is 5 to 8 GPM. The flow meters are made by Blue and
White. You must test the flow meter with different flows to verify that the bobbin moves freely
over the entire range. When ordering a flow meter it is important to record the total flow as well as
the inlet and outlet sizes.
Filtration Systems- Since the CHC treatment system creates crystalline debris by design, it is the
Filtration systems job to remove this debris from the system. All CHC systems require some type
of filtration. CHC systems have incorporated ZGF, centrifugal separators, bag filters, cartridge
filters, Turbo Disk, Amiad, and Forsta filtration systems. Each of these systems are designed to
remove water borne debris. Some of them remove only larger particles while others cost more and
remove a wider variety of particulate. Some require frequent user intervention to clean the media
while others are fully automated and clean themselves. It all depends upon how much the customer
is willing to pay, how much interaction with the system they are willing to do, and what type of
water their system uses for makeup water.
Filtomat- (see Amiad)
FLA- Full Load Amperage of a motor, this is the rated amperage draw for a motor that is working
at 100% load. If the pump motor is flowing more water that it is rated for (pressure too low) than
the amperage will be above the FLA rating and if the pump has a blockage in the inlet or outlet so
that it is flowing little or no water the amperage rating will be far below the FLA rating as found on
the rating plate of the motor.
13
Forsta Filter- Similar to the Amiad and the Orival Filters it also is a screen filter that is utilized by
CHC to remove lighter than water particles from the filter flow. Their housings are always
Stainless Steel constructed.
Gauge- CHC utilizes many gauges within our system. We only use stainless steel, glycerin filled
gauges. It is important when ordering a replacement gauge to specify the range, units of measure,
if it is flanged or not and if the pressure connection is on the back (cbm) or on the lower edge of the
dial. EcoWater CHC requires that the replacement gauge’s range be at least 20% larger than the
expected pressure being measured (if you expect 90 psi, then the gauge’s maximum range should
be 120 psi.)
Globe Valve- A globe valve is used to control the flow within a pipe, as the round handle is turned
a large flat plunger (valve seat) is pushed towards the valve body. As the plunger gets closer to the
valve body the flow diminishes, as it moves away the flow increases.
Head Pressures- Head pressures are used in refrigeration systems to identify the efficiency of the
heat exchange surfaces. If the heat exchanger is scaled up the head pressures will increase due to
the heat not being removed from the refrigerant due to possible scaling in the heat exchanger.
HOA Switch- The Hand Or Auto switch is the power switch on the motor starter that is used to
turn the power to the pump ON and OFF. This switch is referenced as an HOA switch even though
the switches used by CHC Systems are marked as ON and OFF only.
Magnesium hardness (Mg): Mg, like Ca, is leached from the soil by rainwater. It contributes to
the total hardness but is generally present at much lower levels than Ca. Magnesium hardness is a
calculated number based on measured total hardness and calcium hardness:
Magnesium hardness = Total hardness - Calcium hardness
Make Up Water- This is the water that is used to refresh the system water. Make Up can come
from city water, reclaimed water, well water, defrost water or most other source of water.
Typically, potable water is used for Make Up.
Motor Starter- A motor starter is the box that controls the power to the pump. If the motor starter
includes a Power Disconnect, then the motor starter is a Combination Motor Starter. To specify a
replacement motor starter the input voltage is required, the HP of a pump is required as well as its
configuration if it includes a timer or Control Station.
Motor Contactor- The motor contactor is found within the motor starter box and acts like a relay
and upon the instruction of a control signal, will close and pass power to the motor of the pump.
Non-Chemical Water Treatment- The CHC technology uses apposing streams of water that are
forced together under high pressure at extreme speeds, as the two streams converge a vortex is
created. This vortex places the molecules within the water under extreme stress due largely to the
significant vacuum created. The point of intersection of the streams (vortex) exhibits a sudden
temperature change as well as pressure change. The temperature rise can exceed 5000owhile a
vacuum is created at the center of the vortex. These extreme pressure and temperature changes can
rip apart the molecular bonds that are found in the majority of waters impurities. This technology
can be used to diminish bacteria growth as well as degas the Co2 from the water and promote the
14
formation of Calcium Carbonate crystals in the free flowing water so that they do not aid in the
production of hard layered scale formation on the surfaces of the treated system.
Normally Closed Switch- The term Normally Closed (N.C) refers to a type of switch that when it
is in its normal position (not powered) that the switch contacts are closed. Voltage will pass
through a normally closed switch as well as it will have continuity when tested with a DVM. Upon
turning the Switch ON, or applying power the switch will open, no longer passing voltage or being
conductive.
Normally Open Switch- The term Normally Open (N.O) refers to a type of switch that when it is
in its normal position (not powered) that the switch contacts are open. Voltage will not pass
through a normally open switch as well as it will have no continuity when tested with a DVM.
Upon turning the Switch ON, or applying power the switch will close, passing voltage or becoming
conductive as tested with your DVM.
Oriface Plate- An orifice plate is a plate placed between two flanges with a fixed orifice (hole of
specific size) in it. The size of the hole restricts water and maintains a constant flow at specific
pressures. Some CHC systems utilizes orifice plates under the filters on combo skids to maintain
the required pressure and flow through the CHC chamber.
Orival Filter- Similar to the Amiad and the Forsta Filters it also is a screen filter that is utilized by
EcoWater CHC to remove lighter than water particles from the filter flow. Their housings are
always constructed of carbon steel and are orange in color.
pH: The pH is a measure of acidity or alkalinity of water. pH < 7 is acidic, pH > 7 is alkaline and
pH of 7 is neutral. As pH increases, water becomes less corrosive but the scaling tendency of some
insoluble salts, such as calcium carbonate and calcium phosphate, increases. Each time you
descend a whole number (for example: from 7.0 to 6.0), the acidity of solution increases by a factor
of 10. Thus, a pH of 6 is 1000 times more acidic than a pH of 9. Normally under standard CHC
treatment the pH of the system water will rise above the pH of the makeup water. This standard of
operation can be useful when verifying the CHC operation.
PPE- Personal Protection Equipment- Normally EcoWater CHC requires the use of Steel Toe
Boots and protective eye wear while servicing our equipment. However, depending upon what is
being conducted other appropriate equipment may be required.
Power Supply- A Power Supply is an power converter that creates a different DC (Direct Current)
voltage. Most current CHC systems utilize a 24VDC power supply to create the required power for
the PLC and control circuits.
Pressure Sensor- A sensor that monitors the pressure and passes the actual pressure as an
electrical signal (transducer), or senses the pressure and closes or opens a electrical switch at the
specified pressure (Switch)
Pump Savers- These special connecting tubes are designed to isolate the pump from the system
piping to minimize vibration, and reduce applied stresses on the plumbing system as the pump
15
starts, stops, or during continued operation. The piping on most systems will expand and contract
with temperature changes and these changes in lengths will pass directly to the pump as applied
torque, possibly damaging the wet end if a pump saver is not used.
Pump- The pumps used in CHC systems are centrifugal pumps that may consist of a single stage
or multiple stages depending upon the requirements of the system. Pumps are normally identified
by being horizontal or vertical in construction, its HP (horse power rating) and size of its impeller.
These identifications are used to determine the exact GPM (gallon per minute) flow rate and head
pressure. Most pumps if they are leaking can be reworked in the field. Identify the type of pump
kit needed and request the kit from EcoWater CHC before proceeding to the customer site.
Purchases- A customer who decides to purchase our system will be responsible for all installation
costs as well as the cost of the system. All of our systems are warranted against defects in parts for
a period of one year and labor for 90 days. During the first year after installation, EcoWater CHC
will support the system by completing maintenance visits to check up on the system’s operation.
Purge Valve- The purge valve is an actuated valve that is placed on the drain line of a centrifugal
separator. It is opened to purge any solids out of the separator. Normally CHC systems cycle this
actuator on for 18 seconds at least once every 8 hours. Also known as a blow down valve.
Quarterly Maintenance- The quarterly maintenance is a more extensive service that is conducted
once a quarter and consists of the standard maintenance, but includes a more detailed operational
verification, system verification, and maintenance. During the quarterly Maintenance, the motor’s
amperage should be read and compared to the motor’s rating. You should also grease the motor
with the required lubricant. And clean and paint any rusty CHC system surfaces. And review the
condition of the towers. The customer will receive a copy of the Customer Service Report for their
records. This service will only be conducted by a qualified EcoWater CHC Service personnel with
few exceptions.
Relay- a relay is an automated switch that when a control signal is present to its coil, it will
energize and close the contacts found within the relay allowing power to pass through the contacts.
When specifying a replacement for a relay, you must specify the control voltage, number of
contacts and any other information shown on the relay itself.
Roof Types- There are many roof types from tin, to rubber, to concrete, to composite, to what ever
you might find. You need to understand what type of roof the customer has so you can design an
appropriate mounting system. If the customer has a rubber roof, EcoWater CHC utilizes PHP type
feet to mount the equipment directly onto the roof. Refer to www.PHP.com for further information
on these pedestal feet. Other surfaces may require the use of a platform to support the CHC skids.
Routine Maintenance- Routine Maintenance consists of verifying the operation of a CHC system,
basic care and water analysis. Bacteria testing via a Dip Strip Test is conducted during a Routine
Maintenance visit. The customer is given a copy of the Customer Service Report that details the
findings of the maintenance. The Routine Maintenance can be conducted by a qualified
Manufacturing Representative if available. The customer will receive a copy of the Customer
Service Report for their records. This service will only be conducted by qualified EcoWater CHC
Service personnel who have been trained on the function of the system with few exceptions.
16
Rydlyme- A buffered acid that is used to remove scale. It is a stable product that can be shipped
without problem or sent down the drain once used. It is recommended to use the appropriate PPE
when using this product (Eyewear and gloves, if gloves are not available, wash any skid that
comes in contact with the Rydlyme with a mild soap and water solution)
Scale - Minerals such as calcium and magnesium are relatively insoluble in water and can form
scale deposits when exposed to conditions commonly found in cooling water systems. A layer of
scale as thin as 1/64 inch can reduce heat exchanger efficiency by 15%. Scale formation can be
controlled by scale inhibitors such as threshold inhibition chemicals and scale conditioners.
Chemical treatments include acids, polymers and polyphosphates which prevent scale formation by
keeping the scale-forming minerals in solution to prevent deposits from forming. EcoWater’s CHC
treatment will normally cause a thin soft scale formation on the surfaces of the towers. This
inhibition layer should be soft and easily removed with the rubbing of a hand or strong water flow.
Solenoid Valve- A solenoid valve is a valve that is opened or closed in response to an electrical
signal sent across the coil. Solenoid valves can come in 2 or 3 way configurations (refers to the
number of connections on the valve). It is important to reference the part number on the valve
when ordering a replacement, this part number is found on the coil and it specifies the valve size as
well as the control voltage requirements.
Sweeper Jet or Nozzle- also called Eductors, The sweeper nozzles come in many sizes from 3
GPM all the way up to 33 GPM. They use this primary flow pushed through a venturi to increase
flow and push or sweep debris along the bottom of a tower’s basin towards the suction manifold.
When ordering a replacement sweeper jet, it is very important to replace it with the same GPM
flow. If you do not recognize the size, measure the length as well as the connection size for
reference when calling for a replacement.
Thermal Overload- The thermal overload is connected to the motor contactor and its job is to
monitor the continuous amperage draw of the pump motor. When the thermal overload identifies
that the pump is pulling too much amperage, it will automatically turn off the power. Most systems
will automatically reset the thermal overload if the Power disconnect is turned OFF and back ON.
The setting of the amperage trip point is calculated by the motor’s amperage x 1.15.
Timer- EcoWater CHC systems have used a timer to activate the purge actuator for the evacuation
of solids from the centrifugal separator. This timer has controls that allow for the setting of the ON
and OFF times, please refer to the reference section of this manual for specific instructions on the
set up of the Timers used by the CHC treatment systems.
Toroidal Sensor- The Toroidal conductivity sensor is a sensor that does allow the direct contact of
the electrical signal to the water it is monitoring. Non-Toroidal sensors will have two electrical
connections that pass a signal directly through the water to monitor the conductivity. A Toroidal
probe uses two electrical coils, one with a primary AC signal passing through it and the second is
the pick up coil. As water passes between the two coils, the amount of solids within the water
allow a portion of the primaries signal to pass to the secondary coil, the actual amount of signal that
passes through to the secondary coil is used to judge the amount of dissolved solids in the water.
Total Dissolved Solid (TDS): TDS is the total concentration of dissolved components, such as
salts and sugar. Salts, like NaCl, dissociate into ions; while some organic matters, like sugar, do
17
not break up into ions when dissolved in water. There are different approaches to determine TDS,
but it is commonly estimated from conductivity.
Total hardness: This is the sum of Ca and Mg hardness. Fe (Iron), Mn (Manganese), Al
(Aluminum) and other metals also contribute to the total hardness but these substances are usually
present in such small quantities that they can be ignored. Hard waters are generally considered to
be those waters that require considerable amounts of soap to produce a foam or lather, and that also
produce scale in hot water pipes, heaters, boilers, and other units in which temperature of water is
increased materially.
Transducer or Transmitter- Pressure transducers are also called transmitters and they act like a
variable resistor to a DC Voltage that is sent to the PLC. As the pressure increases the voltage that
is released by the transmitter increases, while as the pressure decreases the output voltage also
decreases.
Transformer- A transformer is used to convert one type of AC voltage to another. You can have
step up and step down transformers. Some CHC systems used primarily step down transformers to
convert the electrical supply voltage (normally 480V 60 HZ in the US) to a lower stepped down
voltage to use for the control circuit’s supply (normally 120 VAC). Transformers are rated for a
voltage and should only be replaced with equivalent parts. All CHC motor starter boxes with a
timer, contain a 100VA, center tapped transformer that creates 120V from the 480 Volt supply.
Older Older cabinet style CHC units utilize a 50VA transformer, that creates 24VAC from the 480
Volt supply.
Turbo Disks- Verify similar to ZGF systems these automated filtration systems also strain out
debris from the filtration water flow. They also conduct automated back washes to remove debris
from the filtration disks.
Uses of the CHC Technology- The technology not only has applications in water treatment, it has
also been found to be beneficial in many other possible applications from mixing to treatment of
human waste to oil processing. These other uses continue to be researched and will be defined in
the future. The strongest use of our technology can be found in the Water Tower Treatment.
Cooling towers and Condensers are the primary users of our technology when we talk about Water
Towers.
Water Analysis- The water analysis is a chemical analysis of the water sample taken from the
customer’s location. The results of this analysis will be returned to the appropriate personnel upon
completion. The water analysis requires an appropriate water sample to be taken and then sent to
EcoWater CHC for analysis. Follow the Water Sampling Procedure to secure appropriate water
samples. The water samples can be sent to EcoWater upon acquisition, or can be sent at the end of
the week for convenience.
White Rust- White rust is a corrosion of the galvanizing surfaces of a cooling tower. Unlike
normal scale, it will not dissolve in acid or Rydlyme and is very waxy in consistency. It also looks
like greasy ckicken pox covering a surface, because it is not consistent with a layer type scale over
tubes.
18
ZGF Systems- ZGF Systems are automated filtration systems that strain out debris from the
filtration water flow and then remove debris by conducting a back wash to pass the debris towards
the drain. Most ZGF systems require at least 115 TDH pumps to guarantee adequate flow force for
back washing. For more information go to www.ZeroGravityFilters.com. EcoWater CHC has used
the Easy Clean (single or double element systems), Phoenix (set of 6 elements, they also come in a
dual Phoenix systems) and the S-2000 units.
19
3.0THEORY OF OPERATION
EcoWater CHC supplies both water treatment and filtration systems.
CHC Water Treatment System-
The CHC Water Treatment System consists of a pump and treatment chamber. As water enters into the
main suction pipe it passes through the basket strainer. The basket strainer is designed to remove any
large particles from the water before it enters the CHC pump. Isolation valves are located at both the
inlet and outlet of the basket strainer and are used to isolate the basket strainer from the water flow
during servicing. The pump utilizes a centrifugal pump to pressurize the water to the required pressure
for the Hydrodynamic Cavitation to occur in the CHC treatment chamber. The CHC treatment
chamber consists of two proprietary nozzles that create a high speed water stream that are aimed
directly at the opposing water stream. As these two streams collide, a vortex is created, it is within this
vortex that the Hydrodynamic Cavitation cloud is created. The pressure regulation valve located on the
discharge of the CHC chamber is used to control the required 2-5 psi back pressure for appropriate
operation of the chamber. As water leaves the chamber it then passes through the discharge pipe and
back to the tower’s sump. A vent may be provided at the top of the discharge pipe, to break any
vacuum that could be created as the water suddenly drops into the sump.
CHC
CHC
CHC
Refer to the CHC web site (www.ecowaterchc.com) for more information regarding the CHC
chamber’s configuration and the technology behind its operation.
Filtration System-
As water is drawn in from the basin it passes through the main suction pipe and passes through the
basket strainer. The basket strainer is designed to remove any large particles from the water before the
water passes to the pump. Isolation valves are placed on both the inlet and outlet of the basket strainer
to allow for isolation of the basket strainer during the required servicing. The water then enters the
skid pump. The skid pump utilizes a centrifugal pump that delivers water to the filtration system. As
the water leaves the pump it passes through a centrifugal separator that removes all heavier than water
particles. A timed purge cycle, removes the debris from the separator and passes it to the drain as
needed. Once past the separator, water then flows back towards the tower while a portion is pulled
through a side stream, automated screen filtration unit. This second stage filter, utilizes a fine screen to
filter out any particulate out of the water stream that may be lighter than water. As the filter’s screen
becomes clogged, the differential pressure between Inlet and Outlet increases causing the PLC to
initiate a back wash of the filter. When a back wash is initiated, water is driven into the rinse piston at
the end of the filter. The rinse piston opens the back wash drain valve, and as water passes out of the
drain it crease a Venturi effect that is used to suck off any debris from the filter’s screen. Once the
20
back wash is complete, the controller will cease all water flow to the rinse piston and the filter will
return to a home position. At the end of the filtration back wash cycle, the PLC verifies filter
cleanliness, and if the filter did not clean it’s screen appropriately, a second back wash may begin. The
filter’s back wash cycle is also controlled by a timer, the timer has been set to automatically clean the
filter at least once every 6 hours of operation. All operational failures are shown within the Control
Station’s Filter Alert Area.
2
3
4
Drain
Tower Sweeper
Nozzles
Tower CHC
Discharge
Tower Suction
Manifold
Combo Skid (1 pump)
Torroidal
Conductivity
Probe
1
FP
5
Centrifugal
Separator
CHC Chamber
Assembly
Auto Filter
Assembly
Toroidal Conductivity-
EcoWater has chosen to utilize a Toroidal Conductivity Sensor. Conductivity is a measurement of the
dissolved solids within water. This sensor is utilized to help control the overall maximum conductivity
of the system water.
The advantage of this technology is measurement without any electrical contact between the electrode
and the process fluid. The probe uses two toroidal transformers which are inductively coupled side by
side and encased in a plastic sheath. The controller supplies a high frequency reference voltage to the
first toroid or drive coil which generates a strong magnetic field. As the liquid containing conductive
ions passes thru the hole of the sensor, it acts as a one turn secondary winding. The passage of this
fluid then induces a current proportional to the voltage induced by the magnetic field. The conductance
of the one turn winding is measured according to Ohm's law. The conductance is proportional to the
specific conductivity of the fluid and a constant factor determined by the geometry and installation of
the sensor. The second toroid or receiving coil also is affected by the passage of the fluid in a similar
fashion. The liquid passing thru the second toroid also acts as a liquid turn or primary winding in the
second toroidal transformer. The current generated by the fluid creates a magnetic field in the second
toroid. The induced current from the receiving coil is measured as an output to the instrument. The
controller converts the signal from the sensor to specific conductivity of the process liquid. Although
the toroidal probe is less subject to calibration errors or buildups on the sensor, it is still important that
the probe be cleaned and calibrated at least once every three months. Please refer to the appropriate
sections of this manual for further information.
21
pH Monitoring (Optional)-
Ecowater has chosen to utilize an industrial pH probe for this measurement. A pH meter is an
electronic instrument used for measuring the pH (acidity or alkalinity) of a liquid. The pH probe
measures pH as the activity of hydrogen cations surrounding a thin-walled glass bulb at its tip. The
probe produces a small voltage (about 0.06 volt per pH unit) that is measured and displayed as pH units
by the CHC Control Station (CHCCS). The pH probe is a combination electrode, which combines both
the glass and reference electrodes into one body. It is important that this probe be clean and calibrated
at regular intervals, please refer to the appropriate sections of this manual for specific information.
22
3.3HOW CHC WORKS
CHC chemical-free cooling water treatment has been in service over 15 years and is unlike all other
non-chemical technologies currently available. The technology essentially consists of two side-stream
water loops typically connected into the sump or basin of the cooling tower/evaporative condenser. One
loop acts as a side stream filter. The second side stream loop is where cooling water passes through a
pair of horizontally opposed vortices and is accelerated to a very high velocity at the discharge. At the
point of discharge, the two opposing water streams (whose internal rotation is opposite from one another)
collide, creating hydrodynamic cavitation, shear force, and vacuum.
This sudden lowering of pressure into a vacuum state forces the release of dissolved carbon dioxide
(CO2) from the water. This release of CO2 in turn, causes calcium carbonate to immediately drop out of
solution into suspension where it is removed by filtration. Unlike other non-chemical technologies, CHC
is relatively impervious to alkaline or acidic source water, high or low pH, hardness, TSS or TDS, all of
which are parameters that may render other forms of cooling water treatment less desirable. Additionally,
it is relatively easy for operational personnel to see if this system is working, because it can be either
remotely monitored or monitored on-site by physical observation of the pump status and a vacuum gauge
which measures vacuum being created inside the CHC chamber.
System Operation: Water is pumped from the sump/basin of the cooling tower/condenser and into the
pressure-equalizing chamber. It is then channeled into precision-manufactured nozzles (vortices) that are
configured to impart a specific rotation and velocity to the water streams. The circular motion of the water
is accelerated as the stream flows through the nozzles and the resultant discharge is a conical stream.
The opposing cones collide in the low-pressure stage (stabilizing chamber) to form a circular zone of very
high shear force and high vacuum caused by the collapse of micrometer-sized bubbles and cavities.
Essentially, the pressure change causes hydrodynamic cavitation with locally high temperature at the
point of collision. This cavitation creates solid particles, and the rapid change in pressure to a vacuum
causes the cell walls of microorganisms to burst, thus killing the cell. Finally, the hydrogen-bonding
molecular arrays of water are broken down, thereby allowing entrapped gasses (such as CO2) to be
released and off-gassed to atmosphere. The remaining energy dissipates as turbulent flow, and the
treated water exits the unit at ambient pressure. Suspended matter is removed from the sump/basin via a
second side stream loop designed to sweep the debris from the floor of the sump into the automatic filter
or centrifugal separator. The filter is automatically backwashed to remove solid matter on a timed basis
and is then sent to waste.
Biological Control: CHC technology is in sharp contrast to chlorine or bromine treatments that degrade
over time and require constant additions. During biocide dosage the bacteria cell must ingest chlorine or
bromine. This often takes up to 30 minutes if and when the cell comes in contact with a chlorine molecule,
and is therefore not always 100 percent effective. CHC technology causes a combination of physical
changes to take place in the water that disrupt the cell membranes of biological matter, ultimately
destroying the cell. Every cell pumped through the system is subjected to vacuum, high pressure, kinetic
energy, high velocity collision, shear energy, and localized high temperatures. The pressure of the fluid
inside the cell wall is in balance with ambient water pressure prior to its entrance into the CHC chamber.
However, the pressure differential becomes relatively high once the cell enters the low-pressure stage that is in
vacuum, resulting in a pressure imbalance between the inside and outside of the cell. The cell wall cannot
withstand the pressure differential and the cell wall ruptures, dispersing the cell cytoplasm. After the lowpressure
stage, localized high temperature and high pressure at the intersection point of the vortices also
kills additional bacteria and cell life.
Scale and Hardness Control: Cooling systems build up scale over time due to the addition and
concentration of soluble calcium often in the form of calcium bicarbonate. Calcium bicarbonate can
decompose to yield insoluble calcium carbonate and carbonic acid with any changes in temperature and
pressure. Carbonic acid can further decompose to carbon dioxide and water. (Ca(HCO3)2)↔
CaCO3+CO2+H2O, or (Calcium bicarbonate) ↔ (Calcium carbonate) + (carbon dioxide) + (water). At a
given temperature and pressure, this equation is in equilibrium with no chemical reaction taking place.
Once the pressure is lowered to a vacuum in the low pressure stage, the CO2 equilibrium is shifted
between aqueous and gas phase, causing dissolved CO2 to release to the gas phase. This phenomenon,
together with the high localized temperature created by the collision of the conical water streams,
decreases the solubility of calcium in water and a simultaneous elevation of water pH, which, in turn,
causes a massive formation of calcium carbonate precipitate. Soluble calcium carbonate species
concentrations are thus depleted (by design) both via de-adsorption of CO2 and the precipitation of
CaCO3. As the water stream leaves the CHC unit it enters the sump/basin where the water pressure is
23
stabilized (at atmospheric pressure) and the velocity of the water slows down. Submicron particles of
calcium carbonate called colloids are formed and flow with the water. These become thermodynamically
favored incubation sites to grow crystals composed of Ca2+ and HCO3 ions versus metal surfaces in the
system. As the molecules agglomerate, they become heavy and sink to the basin/sump floor. At this
point, the resultant calcium scale is removed via the side stream filter or centrifugal separator and
collection system. This device is periodically backwashed to remove entrapped calcium and other
suspended matter.
Corrosion Protection: Corrosion occurs in a system due to several phenomena mentioned earlier in this
report. All waters are corrosive to some degree; however, the level of corrosive tendency will depend
upon its physical and chemical characteristics. The materials that a given water supply will negatively
affect may differ. For example, water that is corrosive to galvanized pipe may not be corrosive to mild
steel. Corrosion inhibitors that protect one material may have no effect on other materials. Biological
growth in a piping system can also cause corrosion by providing an environment in which physical and
chemical interactions can occur. Several types of system level problems can occur if cooling water
systems are left untreated. A major source of corrosion is the addition of the bio-inhibiting chemicals
themselves. This is true especially when “shocking” is required as chemicals lose effectiveness over time
and a chemical alternative is administered. By the time this new chemical, usually bromine or chlorinebased,
is put into service the biological growth in the system has gotten out of control such that a “super
concentration” of biocide is required. These chemicals tend to be very corrosive. A layer of biofouling on
any surface in the condenser water system acts as a haven for aerobic and anaerobic activity, bacteria
formation, scale accumulation and potential corrosion. By eliminating biofouling, the potential for corrosive
activity is greatly diminished. CHC operating parameters and the absence of chemicals allow the pH
level to be elevated in the range of 8.5 to 9.0. At these values both iron and copper are protected from
oxidation corrosion, which cannot operate in an alkaline state. Under these conditions metals are allowed
to establish a thin layer of natural protection, which is not penetrated by system water or dissolved
oxygen.
24
4.0TEST EQIPMENT and PPE
This section has been constructed to define the appropriate usage for a DVM (Digital Volt
Meter), Conductivity Pocket Meter ,Ultrasonic flow meter, other equipment as well as PPE
(Personal Protection Equipment) and Safety Practices.
4.0 Safety Requirements-(Updated May, 2014)
THE SAFETY OF EcoWater CHC PERSONNEL MUST ALWAYS BE
TAKEN SERIOUSLY, AND DONE RIGHT WITHOUT REGARD
FOR TIME REQUIRED TO DO THE JOB SAFELY. YOUR LIFE
MAY DEPEND UPON IT!
EcoWater CHC REQUIRES you to follow all safety regulations as set forth by EcoWater management
and requires you to follow all training and or instruction you have been given by EcoWater. If you are
found not following this instruction, you will be warned only once, upon continued failure to follow
our requirements, you will be terminated.
All CHC Requirements are superseded by any Customer Safety Requirement. Before doing any work
at a Customer Site, you are required to check with the customer to obtain any training and/or safety
instructions that may pertain to your work.
You must follow these instructions at all times and are required to contact your supervisor, if any safety
requirements are not understood, or you will have any problems performing them.
EcoWater CHC has a Safety Board located in the Hallway to manufacturing for those personnel
working within our facility. This location includes the MSDS logs for those products used within our
facility. If any field personnel wishes, CHC will provide this same information for your review and or
use. It is your responsibility to acquire any MSDS sheets for products that were not provided by
EcoWater and use them. Please copy EcoWater on an MSDS sheets that you receive on chemicals
used on the behalf of EcoWater.
You must contain a working knowledge of the information found within this document, and be able to
show the ability to utilize this information at all times. This information will be covered within your
training regime at point of hire. You will also participate in yearly examinations and updates of your
working knowledge.
IF YOU HAVE ANY QUESTIONS OR CONCERNS CONTACT CARL STEFFEN AT cell 210857-5252.
25
Site Safety-
Site Safety is a very important part of your work ethics when working with EcoWater CHC. Site
Safety is required when you go to ANY Customer Site.
You MUST verify the following upon any attempt to work at a customer site:
1. You must be familiar with the Emergency Notifications systems used at the site.
2. You must be familiar with all Emergency Evacuation Routes as assigned by the
customer.
3. You must be familiar with all Emergency Notification Requirements as set forth by the
customer. This includes understanding who to contact upon an Emergency and/or
incident.
4. If the customer has any required safety training, you must be trained and follow all
training while at their location.
5. If the customer requires any special PPE, you must comply with that request before
any work is conducted.
6. You must notify the customer of your intent to work on the equipment at the site, and
the customer must know your location at all times, while on the customer’s premises.
7. You are not allowed to do any work at a site without the customer being aware of your
presence at their facility.
8. All PPE must be up to date and inspected before use, do not assume that its protection
and/or function is adequate and safe. This includes any customer supplied PPE.
9. You must utilize the PPE as instructed.
10. You must notify the customer of any possible Hot Work, and/or use of Hazardous
materials while on site, and make sure you have their approval and have met the site’s
safety requirements before any work is done. The customer and you must have a
copy of any intended use chemical’s MSDS sheet.
11. You will not enter any Confined Spaces without customer approval or without the use
of appropriate ventilation and or testing equipment.
12. You will not perform any Hot Work without an appropriate fire suppression system
within arm’s reach. Any Hot Work inside of a Cooling Tower requires you to have
used the appropriate methods of fire control and monitoring. If a penetration is being
made in a tower, you must have an observer on the outside of the tower to monitor for
fire hazards.
13. Never work on electricity if you do not have the appropriate equipment, training, or it
is raining.
26
14. Always use appropriate Lock Out and Tag Out procedures when entering a tower or
working on a motor starter. Remember the most important item for Lock Out and
Tag Out, is notification of the customer.
15. Use your brain, it is your most important PPE.
Personal Protective Equipment-
EcoWater strongly recommends the use of PPE to protect yourself. Equipment on our skids are heavy
and we recommend the use of Steel Toe Safety shoes whenever servicing requires the removal or
installation of any heavy items.
The use of gloves is recommended whenever damage or cuts may be possible. It is up to you to use the
gloves that were provided for your use.
The use of eye protection is recommended whenever you are at a customer site. If you are using any
power equipment, you ARE REQUIRED use the appropriate eye wear. If you are using any chemicals,
you MUST use the appropriate eye wear. If you have prescription safety eye wear, you MUST use
your prescribed eye wear whenever possible.
If using any strong chemicals, refer to the MSDS sheet or contact EcoWater CHC for further PPE
requirements that must be used. Respirators, face shields, protective clothing and gloves MAY BE
REQUIRED AND MUST be used if recommended by the MSDS sheet or by EcoWater.
NEVER assume you will be alright, ALWAY protect yourself, use the prescribed PPE.
If you will be working on a ladder or scaffolding higher than 10 feet, you must work with another
person and you must follow tie off rules and use a safety harness. If you do not have one, one will be
provided for you or one can be purchased for your use (Verify that the specifications meet your
intended use.
If you are working at a new facility or any other facility where construction is in progress you must
wear a bump cap to protect you head.
The customer site may require the use of specific PPE, Always ask what PPE is required, if the
customer will not provide it, you will have to obtain it.
If the customer requires you to go through any specific Safety Training, please do.
Contact EcoWater CHC to identify that customer as a customer requiring additional safety training.
Safely using your PPE-
Always clean and inspect your PPE.
If your PPE is damaged, you must replace it.
If you are unsure how to use your PPE, then ask.
Protect yourself, your body is the only one you have.
Follow Procedures.
Your brain is the most important PPE.
27
Electrical Safety-
This procedure establishes the minimum requirements for any electrical work that will be done on a
customer’s site. You must comply with these requirements at all times. Failure to do so, may cause
death.
You WILL NOT work on any supply connections for power. A licensed electrician or customer
supplied electrician is required for any work conducted on electrical supplies.
You WILL NOT do any electrical work in the RAIN, and/or standing water.
You WILL NOT do any electrical work on live circuits. You must verify loss of power through
the use of a hand held Multi Meter, and or verified electrical tester before any work on existing
wiring or components is conducted.
You WILL use Lock Out/Tag Out procedures when working on electrical systems within the
CHC skid.
You WILL inspect your test equipment before use.
You WILL NOT use any test equipment with defective leads.
You WILL use safety glasses when troubleshooting electrical circuits.
Follow all safety guidelines as instructed to you during your electrical safety training.
If any problems are encountered you must notify EcoWater CHC management as well as the
customer.
28
Hot Work Procedure
This procedure establishes the minimum requirements for the safe use of flames, flammables and or
spark creating equipment. You must always instruct the customer whenever Hot Work will be
conducted. Many customers have Hot Work procedures in place and you must comply with all
customer related Hot Work Requirements including the use of Hot Work Permits.
Before any Hot Work is conducted you must have a working knowledge of Safety Reporting and/or
Emergency Reaction steps that may be needed. You must be prepared for the work and you must take
precautions to minimize any accidents. You must be aware of your surroundings and any possible
combustibles that may be affected. If you cannot view all sparks that are generated due to the location
your work is being conducted in, then you must use someone to monitor the sparks in their entirety
until cool on the other side of the obstruction.
Prevention is always easier than correction of problems created due to Hot Work. This includes
understanding that any material you will be working on may be hot and could cause other problems as
it falls off your work.
Hot Work Requirements:
1. Customer Notification
2. Permit Completion and Filing when applicable.
3. Locate Fire Alarms and Evacuation Routes
4. Move an appropriate Fire Extinguisher into your work area
5. Control any Combustibles
6. Use a Monitor as needed
7. Use your PPE
8. Prepare Work Space to ensure minimization of damage caused by sparks or direct
heat.
Once the Hot Work is completed you must clean up any debris and or safety gear and make sure the
site is better than it may have been when you arrived.
If any problems are encountered you must notify EcoWater CHC management as well as the
customer.
29
Lock Out, Tag Out Procedure
This procedure establishes the minimum requirements for the lockout of energy isolating devices
whenever maintenance or servicing is done on machines or equipment. It shall be used to ensure that
the machine or equipment is stopped, isolated from all potentially hazardous energy sources and locked
out before employees perform any servicing or maintenance where the unexpected energization or
start-up of the machine or equipment or release of stored energy could cause injury.
All employees are required to comply with the restrictions and limitations imposed upon them during
the use of lockout. The authorized employees are required to perform the lockout in accordance with
this procedure. All employees, upon observing a machine or piece of equipment which is locked out to
perform servicing or maintenance shall not attempt to start, energize, or use that machine or equipment.
Sequence of Lockout
(1) Notify all affected employees that servicing or maintenance is required on a machine or equipment
and that the machine or equipment must be shut down and locked out to perform the servicing or
maintenance.
(2) The authorized employee shall refer to the company procedure to identify the type and magnitude
of the energy that the machine or equipment utilizes, shall understand the hazards of the energy, and
shall know the methods to control the energy.
(3) If the machine or equipment is operating, shut it down by the normal stopping procedure (depress
the stop button, open switch, close valve, etc.).
(4) De-activate the energy isolating device(s) so that the machine or equipment is isolated from the
energy source(s).
(5) Lock out the energy isolating device(s) with assigned individual lock(s).
(6) Stored or residual energy (such as that in capacitors, springs, elevated machine members, rotating
flywheels, hydraulic systems, and air, gas, steam, or water pressure, etc.) must be dissipated or
restrained by methods such as grounding, repositioning, blocking, bleeding down, etc.
(7) Ensure that the equipment is disconnected from the energy source(s) by first checking that no
personnel are exposed, then verify the isolation of the equipment by operating the push button or other
normal operating control(s) or by testing to make certain the equipment will not operate.
Caution: Return operating control(s) to neutral or "off" position after verifying the isolation of the
equipment.
(8) The machine or equipment is now locked out.
Restoring Equipment to Service
When the servicing or maintenance is completed and the machine or equipment is ready to return to
normal operating condition, the following steps shall be taken.
30
(1) Check the machine or equipment and the immediate area around the machine to ensure that
nonessential items have been removed and that the machine or equipment components are
operationally intact.
(2) Check the work area to ensure that all employees have been safely positioned or removed from the
area.
(3) Verify that the controls are in neutral.
(4) Remove the lockout devices and reenergize the machine or equipment. Note: The removal of some
forms of blocking may require re-energization of the machine before safe removal.
(5) Notify affected employees that the servicing or maintenance is completed and the machine or
equipment is ready for used.
If any problems are encountered you must notify EcoWater CHC management as well as the
customer.
Confined Spaces
This procedure establishes the minimum requirements for the safe entry into a confined space. A
structure may be indicated as a confined space may be due lack of ventilation (Tank or sump) or the
proximity to moving objects (Fan Blades in an Evaporative Condenser). It is imperative that
appropriate precautions be taken when entering a confines space to ensure brain damage or death do
not occur in a tank or sump due to the lack of oxygen or inhalation of other harmful gasses or loss of
limb or life do not occur due to coming in contact with a moving object.
Always consult with a customer when entering a confined space and in most cases, it will require
someone to monitor you from a safe distance during your entry.
When entering a tank or sump, gasses can build up that are harmful to your health and it is imperative
that appropriate ventilation be given. It is imperative that you require the use of someone to monitor
your condition when entering a confined space.
You will be required to monitor the air’s oxygen levels with a continuous monitoring meter before and
during entry into the space. All workers within the space are required to utilize appropriate PPE and
restraints connected to an external surface. Please refer to the instructions on the Oxygen monitor for
minimal safe levels for entry, BEFORE entry into the tank or sump.
When entering into a Cooling tower, always stop the water flow and continue the fan operation for a
period of at least 5 minutes to evacuate any harmful gasses from the tower.
Utilize Lock Out/Tag Out procedures to secure all controls for the tower’s pump and fans before entry.
Notify the customer when all work is done in the confined space and remove any safeties that were
added during entry.
31
Confined Space Entry Requirements:
1. Customer Notification
2. Use Appropriate PPE
3. Use Appropriate Ventilation
4. Use an Approved/Operational Verified Oxygen Monitor
5. Secure all workers with restraints to an outside surface of the tank or sump.
6. Use Lock Out / Tag Out Procedures
7. Use someone external to the confined space as a monitor.
Use of Combustibles Procedure
This procedure establishes the minimum requirements for the safe use of Combustibles. Before using
any Chemicals make sure and review the MSDS sheets to recognize their flammability. Remember just
because the chemicals may not be flammable as a liquid does not mean it isn’t
flammable as a vapor.
You must always instruct the customer whenever combustibles may be used.
Prevention is always easier than correction of problems created due to the inappropriate use of
combustibles.
Hot Work Requirements:
1. Customer Notification
2. Locate Fire Alarms and Evacuation Routes
3. Identify Combustibles in an appropriate manner, and container.
4. Move an appropriate Fire Extinguisher into your work area
5. Control any Combustibles in methods as defined on their MSDS
6. Use a Monitor as needed
7. Use your PPE
8. Prepare Work Space to ensure minimization of damage caused by sparks or direct
heat.
9. Use appropriate ventilation.
10. DO NOT use combustibles in areas where open flames or sparks are present.
Once the work is completed you must clean up any debris and or safety gear and make sure the site is
better than it may have been when you arrived.
If any problems are encountered you must notify EcoWater CHC management as well as the
customer.
32
Use of Corrosives Procedure
This procedure establishes the minimum requirements for the safe use of Corrosives. Before using any
Chemicals make sure and review the MSDS sheets to recognize their corrosively.The MSDS
Specifies the Safe Handling, usage precautions, cleanup and disposal. You must understand the
handling requirements and or usage, before attempting to use the chemicals.
You must always instruct the customer whenever corrosives may be used.
Prevention is always easier than correction of problems created due to the inappropriate use of
corrosives.
How Work Requirements:
1. Customer Notification
2. Locate Fire Alarms and Evacuation Routes
3. Locate eye wash and other washing facilities.
4. Identify Corrosives in an appropriate manner, and container.
5. Move an appropriate Fire Extinguisher into your work area
6. Control any Corrosives in methods as defined on their MSDS
7. Use your PPE
8. Use appropriate ventilation.
9. DO NOT use corrosives in manners that are not described on the MSDS.
10. Ask Customer about any specialized permits needed for disposal.
11. Corrosives must be neutralized before disposal.
12. Flush all drains for a period of at least 15 minutes after disposal.
Upon any Spills:
1. Utilize the instructions as specified within the MSDS sheet, DO NOT assume you know
the appropriate methods for cleaning up the Chemicals.
2. You must notify EcoWater CHC Management upon any spill.
Once the work is completed you must clean up any debris and or safety gear and make sure the site is
better than it may have been when you arrived.
If any problems are encountered you must notify EcoWater CHC management as well as the
customer.
33
Use of Fire Extinguishers
This procedure establishes the minimum requirements for the safe use of a Fire Extinguisher.
Remember, the use of a Fire Extinguisher requires you to be safe at all times. Do no use the
extinguisher in a manner that would allow you to be blocked by flames from your escape route.
Things to remember about Extinguishers:
1. Make sure your extinguisher is rated for the type of work being done and fire that
may be encountered.
2. During small fires, the use of a Fire Extinguisher is only for use to aid in your removal
from the area. If you have been previously trained with the use of a Fire Extinguisher,
then pull the pin, aim the hose at the base of the fire and squeeze the trigger. If the
fire is on top of a combustible liquid, do not aim at the base, but rater at the mid to top
of the flames to reduce any spreading of the burning material. At any time, if the fire
does not want to extinguish to takes more than a couple of minutes, NOTIFY THE
CUSTOMER and or Fire Department.
3. When a large fire erupts, NOTIFY CUSTOMER IMMEADEATELY and use the
extinguisher to aid in your removal from the area. Make sure the fire alarm has been
sounded and evacuate to the appropriate location as specified by the customer.
4. If you ever have to evacuate, locate the customer representative who is responsible for
you, and check in to make sure they know you have made it out of the building.
5. Dispose of the extinguisher as instructed by the Customer.
Contact EcoWater CHC Management.
Incident Reporting
This procedure establishes the minimum requirements for reporting any mishaps and/or injuries to a
EcoWater CHC employee.
Upon any mishap, you must contact the customer and any other personnel the customer directs you to
IMEADIATELY. You must also contact EcoWater CHC Management IMEADIATELY. If you are
unable to contact the customer, call 911 as needed.
Notifications:
1. Type of Mishap/Incident
2. People Notified
3. Date of Mishap/Incident
4. Injury type and or degree
5. Actions taken for Mitigation
6. Location, time and name of physician or hospital visit.
7. Report from said care giver.
8. Updates as requested from EcoWater CHC Management.
It is our intension that you are taken care of as quickly as possible, if one of the above notifications is
delayed due to the requirements of care, please alert us to that standing after the fact.
34
In most cases a written explanation of the Mishap and/or Incident will be required, please
provide as requested.
4.1Digital Volt Meter-
The DVM is a meter that can be used to Test Voltages, Amperages, component continuity as well as
other uses. A DVM should not be used if any physical damage to the device or its probes have been
found.
Each DVM is different and its labeling and appearance can change. Here is an example of a DVM and
you will see to the right, that there are several possible symbols for each function. (Example only,
may not represent your meter)
AC AMP Clamp
Probes
480 V
V V A
Common V
Display
Selector
Probe connections
Voltage DC= V,VDC, DC,
Voltage AC= V,VAC, AC,
Amperage = A, AAC, A
Continuity = ,,
Black Lead = Common
Red Lead = Voltssupply
The function of the meter depends upon the function Selector and its position. Here are some examples
of when to use each function:
Voltage DC (VDC or V+/-)- Uses the Probes and measures direct current voltages. The black lead
will go onto a ground or negative wire or V- connection and the red lead will go onto the power or +
wire or terminal. The Display must show the DC Voltage indicator. (Uses can include measuring the
voltage of a battery, or DC power supply, or a DC control voltage or Analog transmitter signal.)
Voltage AC (VAC or V~)- Uses the Probes to measure alternating current voltages. The black or red
probes must be placed on the powers, or power and neutral, or power and ground to measure the
voltage. (Uses can include measuring the voltage on a motor, motor contactor, electrical supply, control
voltage if AC)
Amperage (AC)- Uses the AC Amp Clamp and it will measure the AC Amperage passing through a
wire to a motor or other power load.
Continuity- Uses the Probes and measures the resistance to power passed through an object from the
black probe to the red probe. Most DVMs will also beep as the continuity is verified. This function
can be used to verify if a fuse is good (0on display and beep sounded) or bad 1.__will be shown
on the display and the fuse must be replaced. It can also be used to verify any coil, wire, or connection
for continuity. A coil will have an indication of some resistance (2000 K ), a wire or connection
should indicate 0and sound the beep. This function should never be used while power is applied
35
to the circuit and you should never verify the continuity of an object that is placed on a
conductive surface.
Safely Using the DVM-
Never use any DVM that is damaged or its probes are damaged.
Never measure voltages or amperages if it is raining or you are standing in water.
Always verify if power is applied to the test subject with a known good Voltage Checker
before you test it with your DVM.
Never measure continuity with power applied to the circuit.
Never hold a wire with power onto the probe with your fingers.
Never use both hands to measure a voltage, use a self sustaining connection like an clip to
maintain one of the probe’s connections and then use one hand with the other probe.
Never connect the AC Amp Clip to a powered circuit, always remove power, connect the
clip, and then turn the power on to measure amperage.
Never use a DC Amp meter function to measure AC amperage.
Always replace batteries and fuses with those specified by the manufacturer.
If your DVM gets wet, DO NOT USE IT!!
It is important that you understand what type and voltage you should expect. If you do not set your
voltmeter correctly, it will not read correctly. It is important that it is put in the correct measurement
mode you are intending to verify. Many times you can see what power is being supplied to a device or
refer to its label to verify how to set your meter.
The next couple of pages describe different parts found on our systems as weather they are AC or DC
powered:
363738
4.2AC Voltage Checker
As the yellow tip is passed close to
The AC Voltage Checker is a pen sized tester used to quickly verify if AC voltage is present without
having to make an electrical connection.
AC Voltage Checkers come in many shapes and sizes, but the most common looks like this one:
a wire with AC power applied the
tip will light and a sound may be
heard.
The checker can be held in one hand and as it comes close to an AC voltage it will light up and sounds
a beep if the checker has that function.
Safely Using the Voltage Checker-
Never use any checker that is damaged
Never check for voltages if it is raining or you are standing in water.
Always verify if your checker is good by verifying against a known AC power source.
Never use both hands to check for a voltage, The other hand should be behind your back.
Always replace batteries and fuses with those specified by the manufacturer.
If your Checker gets wet, DO NOT USE IT!!
39
4.3Conductivity Pocket Meter
The conductivity meter is a wonderful piece of test equipment, as long as you use it correctly and
maintain it. It can be used to measure the conductivity of the make up water, verify a skids
conductivity meter’s accuracy, as well as check ONE Shot Calibration Solution for possible errors.
You must be aware of the units of measure that your tester is using when verifying the skids reading.
Refer to your Operation Manual supplied with your meter for specifics on how to use your meter.
Always Clean and check the calibration of your handheld meter each week before you visit a customer
site. You need to make sure the batteries are good and the meter calibrated before you try to use it in
front of a customer.
Safely Using the Conductivity Pocket Tester-
Always clean and calibrate your tester each week against a new One-Shot calibration
solution.
Always verify units of measure when using to validate a Conductivity monitor’s values.
Always rinse your tester before submerging it in the water you want to test.
Never use your meter to test Acid or Strong Bases.
Always use the protective cap to cover the probe tip when not in use.
If your meter was provided with a sponge in the test cap, make sure this sponge is wet at
all times.
Refer to your meter’s manual for cleaning and calibration recommendations.
Use your tester to verify the skids conductivity meter over a large scale (air, make up, One
shot, and tower water.)
Always replace batteries and fuses with those specified by the manufacturer.
If your tester gets wet, You must be using it right!!
40
4.4Ultrasonic Flow Meter
The ultrasonic flow meter is a wonderful piece of test equipment, as long as you use it correctly and
maintain it. If can be used to measure the actual flow in piping systems to aid in balancing problems
when multiple towers are being treated by on treatment system.
Refer to your Operation Manual supplied with your meter for specifics on how to use your meter.
Safely Using the Ultrasonic Flow Meter-
Always clean and calibrate your meter before each use. Replace the transducer gel if the
gel is no longer clear.
Apply gel to the pipe being tested before you apply the sensor.
Apply the sensor onto the pipe in a manner that lines up the sensor as instructed in the
manual (the sensor must be lined up on the pipe according to the direction of the flow
within the pipe.)
Never place the sensor on a pipe directly after a turn in flow or restriction of any type, this
can cause turbulence in the water flow and may force your meter to measure an incorrect
flow value.
Always use the protective cap to cover the probe tip when not in use.
Refer to your meter’s manual for cleaning and calibration recommendations.
Always replace batteries and fuses with those specified by the manufacturer.
41
4.5EcoWater strongly recommends the use of PPE to protect yourself. Equipment on our skids
are heavy and we recommend the use of Steel Toe Safety shoes whenever servicing requires the
removal or installation of any heavy items.
The use of gloves is recommended whenever damage or cuts may be possible. It is up to you to use the
gloves that were provided for your use.
The use of eye protection is recommended whenever you are at a customer site. If you are using any
power equipment, you ARE REQUIRED use the appropriate eye wear. If you are using any chemicals,
you MUST use the appropriate eye wear. If you have prescription safety eye wear, you MUST use
your prescribed eye wear whenever possible.
If using any strong chemicals, refer to the MSDS sheet or contact EcoWater CHC for further PPE
requirements that must be used. Respirators, face shields, protective clothing and gloves MAY BE
REQUIRED AND MUST be used if recommended by the MSDS sheet or by EcoWater.
NEVER assume you will be alright, ALWAY protect yourself, use the prescribed PPE.
If you will be working on a ladder or scaffolding higher than 10 feet, you must work with another
person and you must follow tie off rules and use a safety harness. If you do not have one, one will be
provided for you or one can be purchased for your use (Verify that the specifications meet your
intended use.
If you are working at a new facility or any other facility where construction is in progress you must
wear a bump cap to protect you head.
The customer site may require the use of specific PPE, Always ask what PPE is required, if the
customer will not provide it, you will have to obtain it.
If the customer requires you to go through any specific Safety Training, please do.
Contact EcoWater CHC to identify that customer as a customer requiring additional safety training.
Safely using your PPE-
Always clean and inspect your PPE.
If your PPE is damaged, you must replace it.
If you are unsure how to use your PPE, then ask.
Protect yourself, your body is the only one you have.
Follow Procedures.
Your brain is the most important PPE.
42
4.6Safety Procedures
1. Always use your appropriate PPE.
2. Always Notify the customer when you enter their site, and make sure
someone knows where you will be and when you are leaving their site.
3. Always use your brain and follow safety practices.
4. Always be aware of any customer requirements for safety and follow them, if
not, you may get in trouble, may be fired, electrocuted, burned, drown or die.
5. Your brain is the most important PPE, use it.
6. Never work on electricity if you do not have the appropriate equipment,
training, or it is raining.
7. Always use appropriate Lock Out and Tag Out procedures when entering a
tower or working on a motor starter. Remember the most important item
for Lock Out and Tag Out, is notification of the customer.
Lock Out, Tag Out Procedure
This procedure establishes the minimum requirements for the lockout of energy isolating devices
whenever maintenance or servicing is done on machines or equipment. It shall be used to ensure that
the machine or equipment is stopped, isolated from all potentially hazardous energy sources and locked
out before employees perform any servicing or maintenance where the unexpected energization or
start-up of the machine or equipment or release of stored energy could cause injury.
All employees are required to comply with the restrictions and limitations imposed upon them during
the use of lockout. The authorized employees are required to perform the lockout in accordance with
this procedure. All employees, upon observing a machine or piece of equipment which is locked out to
perform servicing or maintenance shall not attempt to start, energize, or use that machine or equipment.
Sequence of Lockout
(1) Notify all affected employees that servicing or maintenance is required on a machine or equipment
and that the machine or equipment must be shut down and locked out to perform the servicing or
maintenance.
(2) The authorized employee shall refer to the company procedure to identify the type and magnitude
of the energy that the machine or equipment utilizes, shall understand the hazards of the energy, and
shall know the methods to control the energy.
(3) If the machine or equipment is operating, shut it down by the normal stopping procedure (depress
the stop button, open switch, close valve, etc.).
(4) De-activate the energy isolating device(s) so that the machine or equipment is isolated from the
energy source(s).
(5) Lock out the energy isolating device(s) with assigned individual lock(s).
43
(6) Stored or residual energy (such as that in capacitors, springs, elevated machine members, rotating
flywheels, hydraulic systems, and air, gas, steam, or water pressure, etc.) must be dissipated or
restrained by methods such as grounding, repositioning, blocking, bleeding down, etc.
(7) Ensure that the equipment is disconnected from the energy source(s) by first checking that no
personnel are exposed, then verify the isolation of the equipment by operating the push button or other
normal operating control(s) or by testing to make certain the equipment will not operate.
Caution: Return operating control(s) to neutral or "off" position after verifying the isolation of the
equipment.
(8) The machine or equipment is now locked out.
Restoring Equipment to Service
When the servicing or maintenance is completed and the machine or equipment is ready to return to
normal operating condition, the following steps shall be taken.
(1) Check the machine or equipment and the immediate area around the machine to ensure that
nonessential items have been removed and that the machine or equipment components are
operationally intact.
(2) Check the work area to ensure that all employees have been safely positioned or removed from the
area.
(3) Verify that the controls are in neutral.
(4) Remove the lockout devices and reenergize the machine or equipment. Note: The removal of some
forms of blocking may require reenergization of the machine before safe removal.
(5) Notify affected employees that the servicing or maintenance is completed and the machine or
equipment is ready for used.
44
5.0TROUBLESHOOTING
This section has been divided into sections that reflect the problems that may be encountered.
The possible causes discussed may not specify all possible failures (Contact EcoWater CHC
Service personnel to discuss your problem for other possible failures to look for). At the end of
this section, specific failure alarms are discussed.
The troubleshooting techniques discussed here are placed in a functional order, the actual order
used for your troubleshooting may differ.
After each set of troubleshooting instructions you will find a blank area for you use in adding
notes and other hints.
5.1Power Issues-
5.1.1The skid will not power ON (No power LED and No pump operation)-
1. Verify if the power indicator is lit on the motor starter, IF IT IS LIT, skip to #4.
2. Verify that power is available at the motor starter. Open the motor starter and with the
DVM (Digital Volt Meter), verify that power is present on all three legs of the power
supply. EcoWater CHC recommends the use of the ONE HAND safety technique. This
means only one hand should enter the motor starter box at any one time, the other hand
should be placed behind your back during testing. You can connect the black lead to any
ground location within the motor starter or you can hold both probes with one hand as
discussed during training.
3. If power is not at the skid, have the facility maintenance staff verify that the power
disconnect breaker is still in the ON position, have the customer verify why power is not
available at the CHC equipment.
4. If power is available at the skid, verify that as the power disconnect on the motor starter is
turned ON, that power is available at the outlet terminals of the power disconnect. If there
is no power at the outlet terminals (must be on all three), replace the power disconnect.
5. If power is available at the outlet terminals of the power disconnect, then verify that power
is available through the main fuses. If power is not available through the fuses, replace the
fuses and verify operation of the system. Normally if these main fuses have been blown, a
secondary system failure may have occurred, and other trouble shooting may be required.
Another possible cause for a main fuse failure could also include weather conditions. If
lightning in the area occurred at the original time of failure, it is possible that the lightning
had struck the electrical supply and caused a sudden surge of power into the skid causing
the fuses to fail. Verify all other components for appropriate operation, and replace those
items if they have also failed.
6. If the power is available through the fuses then verify that you have 120V at the secondary
side of the control transformer. If you do, proceed to “Power at skid, however the pump
will not start”. If you do not verify that you have 480 V on the Primary side of the
transformer. If there is 480 volts on the transformer’s primary and 0 volts on the secondary,
than the transformer has failed and must be replaced.
7. If there was no voltage on the primary of the transformer, then check the smaller control
voltage fuses. The control voltage fuses are rated for 4/10 A at 600 Volts. You will need to
replace them with an appropriate rated replacement part. You do not want to exceed the
4/10 size, too large of a fuse could cause a fire due to transformer overload. Once the fuses
are replaced verify that the system operates without continuously blowing fuses. If the
45
fuses were blown but after replacement, they will not blow again, then we can assume that a
sudden surge in the electrical supply due to weather or lightning strikes.
8. If the fuses continue to blow, remove one of the following at a time until the fuses no longer
blow and then troubleshoot or replace that item and continue testing the unit: Relay, Blow
Down Actuator, Conductivity Meter, LED or other indicators on the motor starter and
finally the motor contactor.
9. If the PLC will not power ON and the pumps will not start and your system incorporates a
24VDC power supply, it is possible that one of the actuated valves is pulling down the
24VDC supply. Open the motor starter box, Turn the Power Disconnect ON, and verify if
the power supply LED is fully lit. Disconnect the Din Rails from the actuated valves or
remove the relays if the valves are wired directly and then try to turn on the Power
Disconnect again. If the PLC then lights, one of the actuated valves is pulling the power
down. Connect one valve at a time and verify operation of the system as discussed earlier.
When the power will no longer come on, disconnect the last actuated valve and verify it will
again power ON. Replace that actuated Valve.
5.1.2The skid’s pump will not power ON (Power LED ON but No pump operation)-
1. The power indicator is a good signal that at least two of the three power lines coming into
the motor starter are live. It also indicates that the corresponding fuses, transformer and
power breakers are still OK.
2. Verify that the Thermal Overload is not tripped, simply press the Reset button to verify. If
the thermal overload was tripped, go to step 8.
3. Verify that power is available at the motor starter on all three legs. Open the motor starter
and with the DVM (Digital Volt Meter), verify that power is present on all three legs of the
power supply. EcoWater CHC recommends the use of the ONE HAND safety technique.
This means only one hand should enter the motor starter box at any one time, the other hand
should be placed behind your back during testing. You can connect the black lead to any
ground location within the motor starter or you can hold both probes with one hand as
discussed during training.
4. If power is not good on all three legs at the skid, have the facility maintenance staff verify
that the power disconnect breaker is still in the ON position, have the customer verify why
power is not available at the CHC equipment.
5. If power is available at the skid, verify that as the power disconnect on the motor starter is
turned ON, that power is available at the outlet terminals of the power disconnect. If there
is no power at the outlet terminals (must be on all three), replace the power disconnect.
6. Verify that power is available past all three main fuses within the motor starter. Replace
any defective fuse.
7. Verify that as the HOA switch is turned into the ON position that the control voltage is sent
to the motor contactor’s coil.
46
8. If you are working on an older style CHC(Cabinet type) it may have the push button ON
and OFF power switches, there is an upgrade available to convert this style of switch to a
standard HOA switch. To test the push button switches, verify that power passes through
the switch as the button is pressed.
9. Verify that the pump motor’s amperage is within the specified FLA as shown on its motor’s
rating plate, if it is, turn the power to the skid off and verify all electrical connections. A
discoloration on a wire’s insulation will signal a loose connection. Make sure all
connections are tight and verify that if any wire nuts are used, their connections are secure
as well.
5.1.3The skid’s pump will not maintain power when your release the ON push button (Older
cabinet style CHC units only)
1. Verify that the OFF switch is not stuck or defective, the OFF switch is a normally Closed
switch, however if it fails the power to the pump will not remain when the ON button is
released.
2. Check to see if the vacuum switch has been rewired, if it has, a blue and brown wire will be
wire nutted together in the motor starter. If these wires are not connected with the wire nut,
contact EcoWater CHC Service for the upgrade procedure.
5.1.4The skid’s pump pops breakers, fuses, or thermal overloads frequently-
1. Verify that the pump motor’s amperage is within the specified FLA as shown on its motor’s
rating plate, if it is, turn the power to the skid off and verify all electrical connections. A
discoloration on a wire’s insulation will signal a loose connection. Make sure all
connections are tight and verify that if any wire nuts are used, their connections are secure
as well.
2. Verify that the power coming into the skid on all three legs is the same voltage. If you have
one leg that is significantly lower, than there is a problem with the power balancing of the
three legs at the facility and you will need to bring this to the attention of the facilities
service manager. If one leg gets loaded more than the other two, it can cause a single phase
condition of the pumps motor and will cause the amperage to suddenly increase blowing
fuses and breakers.
47
3. Look at the power disconnect and the motor contactor, if any smoke residue is left on the
plastic, this can signal that one of the contacts may be failing. EcoWater CHC recommends
the replacement of the component to ensure appropriate power distribution. If one of the
contacts have failed, the pump will make a humming noise and will not spin.
4. If the Main breaker is weak or too small in rating, the pump can cause the breaker to trip
during start ups. This is most noticeable upon repeated starting/stopping of the pump motor.
The normal rating of the supply breaker should be at least twice the pump’s rated FLA. It is
also recommended that the supply breaker be of a time delay type allowing for at least 2
seconds of sudden amperage spikes.
5. If it is the thermal overload that is tripping frequently also verify that the selected trip point
is at least 1.15 x the rated FLA of the motor. If it is set correctly and the thermal overload
continues to trip, replace the thermal overload.
5.1.5Indicator lights are non functional (pump is operational but the indicator is not lit)
1. Verify that the control voltage is present on the back of the indicator. If it is, then replace
the indicator with an appropriate matched bulb or LED. Be aware that some of the older
CHC (Older cabinet style units) utilize a 24V AC bulb, it must be replaced with a like
product.
2. Always make sure that the plastic cap covering the bulb is not cracked, broken, or its seal is
defective, if water or rain gets onto a bulb, it will cause the bulb to fail, so replace any
defective parts found.
3. If there is no control voltage at the back of the indicator, then there may be a faulty wire or
connection, contact EcoWater CHC Service to receive the appropriate electrical wiring
schematic to verify the wires and connections.
5.1.6The conductivity meter will not power on (Walchem or LMI only)
1. Verify that power is available into the conductivity meter on the power cable. Both meters
require 120V AC power. If no power is available verify the power cable and its connection
to the power source.
2. Check the fuses inside of the Walchem or LMI units.
a. The F1 fuse on the LMI is under the black plate below the control panel. It is rated
at 4A, 250V slow blow and should only be replaced with a similar product
b. The F1 fuse on the Walchem is behind the control panel, you will need to remove
the two Phillips screws to access the fuse. It is rated at .125 A, 250V and should
only be replaced with a similar product.
c. If they continuously blow the meter is defective and must be replaced.
48
3. If the above has been verified and power is available to the conductivity meter and it will
not turn ON, then replace the meter.
5.1.7The CHC Control Station will not power ON (newer style skids only)
1. The control station will power on whenever power is supplied to the skid. If the pump will
function and the control station will not come ON, verify that the breaker to the DC power
supply has not been tripped.
2. If the breaker is tripped, reset it and verify operation. If the breaker continues to trip, then
disconnect one item at a time from this list until the breaker no longer trips: Blow Down
Actuator, Relay, Motor Contactor and finally the control station. If the breaker continues to
trip after each one of the above is removed from the circuit, then replace the DC power
supply. Once the problem has been isolated take the appropriate actions to verify the wiring
and connections and then replace the defective parts.
3. If the 24Volts DC is available at the Control Station but the display will not respond,
replace the Control Station. To replace the unit, disconnect all wire terminals from the unit
and then remove the four mounts from each corner of the controller and remove it from the
panel. Once the new controller has been installed, reconnect all terminals and test.
4. Contact EcoWater CHC Service if further assistance is needed.
5. If the PLC will not power ON and the pumps will not start and your system incorporates a
24VDC power supply, it is possible that one of the actuated valves is pulling down the
24VDC supply. Open the motor starter box, Turn the Power Disconnect ON, and verify if
the power supply LED is fully lit. Disconnect the Din Rails from the actuated valves or
remove the relays if the valves are wired directly and then try to turn on the Power
Disconnect again. If the PLC then lights, one of the actuated valves is pulling the power
down. Connect one valve at a time and verify operation of the system as discussed earlier.
When the power will no longer come on, disconnect the last actuated valve and verify it will
again power ON. Replace that actuated Valve
49
5.2Pressure Issues with the CHC skid-
The following chart represents the normal CHC pressures. Some pressures may differ from those
shown below due to water height in relation to the CHC chamber as well as pump specifications.
CHC Pressures- The CHC chamber requires the following pressures:
Vacuum –(all) -25 ~ -30 (When applicable)
Pump Pressure-(10 and 20 GPM units only) 72-84 psi
(40, 60, 80, 125 and 250 GPM units) 85-102 psi
Back Pressure-(all) 3-6 psi, normally set using the sound
5.2.1Gauge Problems-
If the gauge is reading high or low, turn off all power to the device the gauge is connected to
and allow the pressure to stabilize. The gauge should return to 0 psi. If it does not, open the
vent at the top of the gauge and allow it to return to 0 psi (this may take several minutes). If the
pressure still remains above or below 0 psi, replace the gauge. Replace the gauge
5.2.2Low Pump (s) Pressures-
Verify that the gauges are operating and return to 0 psi as the pump is stopped. Verify the
strainer basket is clean. You will have to verify the sides of the basket are clean, and not just
the bottom. If the pressure remains low, verify that the isolation valves around the pump as
well as the towers are open. If the pump appears to be cavitating, verify that there is no o-ring
or seal failures in the pump suction line. If air is ingested the pump pressure could be low. If
the pressure remains low, verify that no blockage exists within the tubing to the gauge. If the
pressure remains low, rebuild or replace the pump or motor.
5.2.3High Pump Pressures-
Verify that the gauges are operating and return to 0 psi as the pump is stopped. Verify the
isolation valves at the unit as well as the towers are open. High pump pressures, if not caused
by a defective gauge, are normally caused by an obstruction to flow. If all the valves are open,
the obstruction will have to be located and removed. The obstruction may be within the CHC
chamber itself. Open the chamber and make sure that all nozzle inlets are clear of debris. Be
aware that some systems with a high head pressure due to the location of the pump as
compared to the height of the water level may increase the performance of the pump causing
higher pump pressures. In these cases, verify that the pump pressures reflect the initial
installation pump pressures and if so, disregard the current gauge reading as being high.
50
5.2.4Back Pressure Problems-
Verify that the gauges are operating and return to 0 psi as the pump is stopped. If the back
pressure of the CHC chamber is not appropriate the effectiveness of the CHC treatment may be
affected. Increase low CHC back pressures until within range or CHC sound appears. If the
back pressure is too high then decrease the pressure utilizing the back pressure valves on the
discharge of the CHC all the way to any tower isolation valves. Verify that the CHC chamber
is at least within 10’ of the water height as long as the back pressure does not exceed 5 psi.
5.2.5Vacuum Pressure Problems- (When Applicable)
Most vacuum problems are associated with leaks or blocked vacuum tubes.
a.Leaks- To verify the location of a leak, if you run your hand over the connections of the
tubing and fittings of the vacuum system while the system is running, as you move a
location that is leaking the vacuum will increase, you can then rework that connection or
replace it to fix the problem. In some cases the gauge may be the source of the vacuum
leak. If the gauge has the valve on the back of it, simply close off the valve during
operation of the CHC skid and then turn off the power to the pump if the reading remains
constant then the gauge is not leaking, however, if the pressure decreases quickly, the gauge
or valve will required replacement.
b. Blocked tubing- To verify if the tubing is blocked, first turn off the CHC pump, if the
vacuum changes quickly, there is no blockage. However if the vacuum responds very
slowly or does not change at all, remove the hose from the vacuum gauge and see if the
gauge then responds, if it does the gauge is good and the blockage is somewhere else. The
most common location for blockage is in the vacuum tubes within the chamber, these tubes
will need to be removed and cleaned or replaced. You can also verify that the elbows that
attach to these tubes are free from any buildup, use a descaler (e.g. Rydlyme or equivalent)
to remove the buildup or replace the elbow to correct the problem
c. If you could not find a blockage or leak, you will need to verify the pump pressures and if
correct, the problem is likely associated with the CHC chamber itself. Contact EcoWater
CHC Service Department.
51
5.3Issues with the Filtration skid-
Filter Pressures can vary widely depending upon the construction of the installation. However
there are several key things you must be aware of.
1.The filter pressure should never exceed the dead head (DH) pressure of the pump. To
verify slowly close down the discharge valve on the filter until the pressure reaches it
maximum point. This is the dead head pressure. If the valve is Opened, the pressure
should be at least 2 psi below the dead head pressure.
2. The filter pressure should be set so that the pump is operating at its designed flow and
pressure. There are three basic pressures to be aware of for the pump:
a. Older pumps with a rating of 75 TDH (Total Dynamic Head) should be
operated at 32 psi.
b. Pumps with a rating of 95 TDH should be operated at 41 psi.
c. ZGF pumps with a rating of 115 TDH should be operated at 50 psi.
d. Utilize the Filter discharge valve or Sweeper jets to maintain this operational
pressure.
5.3.1Gauge Problems-
If the gauge is reading high or low, turn off all power to the device the gauge is connected to
and allow the pressure to stabilize. The gauge should return to 0 psi. If it does not, open the
vent at the top of the gauge and allow it to return to 0 psi (this may take several minutes). If the
pressure still remains above or below 0 psi, replace the gauge. Replace the gauge
5.3.2Low Pump (s) Pressures-
Verify that the gauges are operating and return to 0 psi as the pump is stopped. Verify the
strainer basket is clean. You will have to verify the sides of the basket are clean, and not just
the bottom. If the pressure remains low, verify that the isolation valves around the pump as
well as the towers are open. If the pump appears to be cavitating, verify that there is no o-ring
or seal failures in the pump suction line. If air is ingested the pump pressure could be low. If
the pressure remains low, verify that no blockage exists within the tubing to the gauge. If the
pressure remains low, rebuild or replace the pump or motor.
52
5.3.3High Pump Pressures-
Verify that the gauges are operating and return to 0 psi as the pump is stopped. Verify the
isolation valves at the unit as well as the towers are open. High pump pressures, if not caused
by a defective gauge, are normally caused by an obstruction to flow. If all the valves are open,
the obstruction will have to be located and removed. The obstruction may be within the CHC
chamber itself. Open the chamber and make sure that all nozzle inlets are clear of debris. Be
aware that some systems with a high head pressure due to the location of the pump as
compared to the height of the water level may increase the performance of the pump causing
higher pump pressures. In these cases, verify that the pump pressures reflect the initial
installation pump pressures and if so, disregard the current gauge reading as being high.
5.3.4Differential pressure too High or too Low-
Verify that the gauges are operating and return to 0 psi as the pump is stopped. Systems with
centrifugal separators require at least 4 psi differential pressures between the inlet and outlet
pressures. If the pressures are too low <4 psi, verify that there is no obstruction to the flow of
the sweeper nozzles, this can also be seen by having a closed valve on the discharge of the
filter. If the differential pressures are to high (normally seen in an automated filtration system
including Filtomat, ZGF and Turbo disk systems) this indicates that the filter media is not being
cleaned appropriately during a back wash. See Filter Back Wash Failures.
Conduct a Power Clean procedure and then clean the Filter element as specified.
5.3.5Filter Back Wash Failures-
These types of failures may be seen from a visual alarm on the controller or recognized by the
DP switch indicating a pressure that is higher than the set point continuously. Please refer to
the appropriate service manual attached for each specific type of filter. There are several types
of failures to verify:
1.Is the back wash function working when the manual BW start switch is pressed? Make
sure that all of the appropriate valves are being controlled to implement a back wash. See
specific troubleshooting requirements for ZGF, Filtomat, and Turbo disc filters.
53
2. If the valves are responsive, verify that purged water is passing to the drain during a back
wash cycle. If no water is passing to the drain, then look for clogged piping associated with
the drain.
3. If water is present at the drain during a back wash, then clean the filter element. A stainless
steel brush can be used with Rydlyme to clean the Filtomat and ZGF filters. EcoWater
CHC also recommends polishing the outside surface of a ZGF element. Once cleaned
verify that the filter again back washes effectively. Normally when the elements are
plugged you will need to discuss your findings with CHC Service Personnel to see if any
changes to the system are required. If the filter element becomes plugged frequently
changes to the DP switch set point, filter back pressure or other items may need to be
adjusted to diminish failure occurrences.
4. Verify the DP switch as its pressure increases to see at what pressure the filter responds with
a back flush routine. If an automated back flush is not started, the DP switch may be
defective and you will need to verify the switches signal to the controller, if the signal is
available at the controller, replace the controller, if the signal is not present at the controller,
replace the DP switch and or repair/replace the wiring from the switch to the controller.
5. Make sure the required back pressure is set with the valve down stream of the filter. The
ZGF requires 45 psi outlet pressure under normal conditions, the Turbo disc requires
minimally 32 psi outlet pressure and the Filtomat requires minimally 35 psi.
ZGF Filters- Refer to the appropriate service manual but here are a few thing to look for.
d.Air is required on the majority of the ZGF units. It requires minimally 80 psi to
operate the system. Make sure that air is available for the unit and that as the failure
occurred that air was present (if the failure occurred while you where not on site)
e. Holding down the Reset button can be used to reset a displayed alarm.
f.The air operated actuators must move freely, if they are sluggish make sure that a
moisture separator is on the air line at the filter to remove any water from the air
supply.
g. Phoenix- If the Home Position Not Found message appears, then verify all electrical
connections from the controller to the filter itself, we have found many of the filter’s
yellow interface cable to the black filter cable connections to be defective. We
normally rewire the yellow and black cables directly into the DP switch where we
solder the connections directly to their corresponding mates. You will be required to
set the foot valve back to home position before you can continue using or testing the
filter.
h. Phoenix DP Switch- The DP and High DP switches are normally closed, so that
when testing them you should have a 12V DC signal passing through the switches
with the filter pressures normal. Use the electrical schematic to verify which wires
to measure or call CHC Service Personnel.
54
i.Phoenix Home Position Switch- The home position switch sends a 12 VDC signal
back to the controller as the foot valve reaches its home position. If your filter is not
recognizing Home Position, first verify the connections of the cables, then measure
the voltage at the controller with your DVM to see if the signal is returning from the
switch. We have also seen one failure where the restraining clip on the center shaft
of the foot valve was missing and the foot valve shaft would allow the switch’s
signal bolt to move too low for the switch to see it. Make sure that the signal bolt is
within 1/8” of the home position switch as the foot valve rotates 360 degrees.
j.Phoenix Foot Valve- If water is found inside of the Foot Valve area where the home
position switch is located, an o-ring kit will need to be installed on the Foot Valve.
This kit includes smaller o-rings that will be placed inside of the valve against the
shaft itself. Without replacing these smaller o-rings water will most likely continue
entering the home position switch area. Always make sure the Foot Valve rotates
freely throughout its 360 degrees of rotation. If it does not, make sure no debris is
longed in one of the internal ports that the valve rotates against. We have seen large
debris in this are that can keep the valve from turning.
k. Phoenix Control PLCs- If you have a TECO controller it has been modified from
the original ZGF controller. The Teco controller will indicate that a BACK WASH
FAILURE has occurred, you will need to verify the appropriate steps if this message
appears. You could also find a SCREEN CLEANING REQUIRED message. This
message indicates that greater than 5000 back washes have occurred. To reset this
message, Press the ESC button, select STOP and press the OK button, then select
RUN and press the OK button. Now when you press the ESC button the display
should revert back to the initial screen and the BW counts should indicate 00000. Of
you find any other error codes, you will be required to replace the controller.
Turbo Disk Filters- Refer to the appropriate service manual but here are a few thing to look for.
a.Air is required on the majority of the Turbo Disk units. It requires minimally 80 psi
to operate the system. Make sure that air is available for the unit and that as the
failure occurred that air was present (if the failure occurred while you where not on
site)
b. The DP switch is used to manually initiate a back wash by rotating the gauge’s knob
until the striker comes in contact with the red pressure indicator.
c. The air operated actuators must move freely, if they are sluggish make sure that a
moisture separator is on the air line at the filter to remove any water from the air
supply.
55
d. The filter elements ride inside the element cassette. As a back wash is conducted
this cassette releases pressure on the disks, improving the back wash capability.
Make sure this cassette opens and squeezes against the disks easily, if not, clean and
replace the o-rings on the cassette.
e. The filter elements can be cleaned with Rydlyme or by hand, each side of each disk
has small groves that will need to be clean. Each disk should be free to move, if
disks are stuck together, clean or replace them.
Filtomat/Amiad/Forsta Filters- Refer to the appropriate service manual but here are a few thing
to look for.
a. The back pressure on the filter is required as specified above.
b. Under normal operation (no back wash in progress) the rinse piston will be
pressurized and if you remove its hose from the end of the filter water will
aggressively pass through the hose, in most cases it will travel several feet away
from the hose. If it does not, then there is an obstruction in the solenoid valve that
will either need to be removed with cleaning or replace the solenoid.
c. The DP switch used with the Filtomat and Orival systems have two switches in
them, on older Filtomat systems only one switch is used, so upon a failure of the DP
switch you can utilize the spare switch to repair the system. On newer Filtomat and
Orival systems you will notice that both switches are utilized. In this case you must
replace the DP switch if it fails. To adjust the set points of the DP Switch, utilize the
supplied allen wrench to loosen the screw on the switch slider, move the switch
towards the HI side to decrease the DP setting and towards the LO side to increase
its setting pressure. See attachment “New Style DP Switch”.
d. No back pressure on the drain is allowed. If the customer has installed a blow down
meter on the drain, contact EcoWater CHC Service to discuss further requirements.
e. If you have an older style Filtomat controller it will have a TECO controller. The
Teco controller will indicate that a BACK WASH FAILURE has occurred, you will
need to verify the appropriate steps if this message appears. You could also find a
SCREEN CLEANING REQUIRED message. This message indicates that greater
than 5000 back washes have occurred. To reset this message, Press the ESC button,
select STOP and press the OK button, then select RUN and press the OK button.
Now when you press the ESC button the display should revert back to the initial
screen and the BW counts should indicate 00000. Of you find any other error codes,
you will be required to replace the controller.
56
Centrifugal Separators- Refer to the appropriate service manual but here are a few thing to look
for.
a.There are no moving parts to a Centrifugal Separator, if during operation you hear
strange noises from the separator, then the baffle plate has failed and the separator
must be replaced.
b. The separator requires at least 3 psi differential pressure from its inlet to its outlet,
refer to filter problems for more information.
c. All separators remove solids from the water stream. Thereby requiring some way to
remove the solids from the filter. Most systems utilize a timed actuated purge valve,
this valve is controlled by a timer normally set at 18 seconds ON and 6 hours OFF.
Refer to “Adjusting the Purge Valve Timer” for more information on about adjusting
and reading the timer settings.
d. If a separator is clogging frequently decrease the OFF time and increase the ON
time. One example may be moving the ON time from 18 seconds to 24 seconds and
the OFF time from 6 hours to 4 hours. Trial the new settings for a month to see if
the clogging has ceased. Make further adjustments as needed.
e. Other Separators utilize a continuous drain flow through a bag filter back to pump
suction. Make sure that the flow restriction valve after the bag filter housing is
adjusted so that only a loss of 3 psi is seen on the discharge pressure of the separator
as this valve is opened. You will also need to verify that the customer is cleaning
the bag in a timely manner. Some of the systems in the field using this technique
also have a flow meter built in line with the flow restriction valve. You can use this
meter as a gauge as to when the bag is plugged and requires replacement. You can
also use this meter to regulate the flow through the bag.
57
Bag Filters-
Many of the systems that contain a centrifugal separator also have a bag filter. This bag filter
is used to remove the lighter that water particles from the water stream. Some filters are in line
with the separator while others remove a portion of the filters flow in a side stream application.
In-Line Bag Filters
a. The inline bag filter housings are placed in line with the discharge flow from the
separator. As the bag starts to blind off (clog up) the overall pressure on the
separator’s discharge will increase until it reaches the set point (BELOW THE
PUMPS DH PRESSURE) where it will operate a bypass valve. Some of the bypass
valves are Manual in design while others utilize a switch an electric actuated valve.
You will need to make sure the switch closes below the pump’s DH pressure then
opens the valve. If it does not open the valve, check the switch to make sure it’s
setting pressure is appropriate, and that it electrifies the valve as it’s setting pressure
is reached. Refer to testing actuated valves for further assistance. Once the bypass
pressure is reached and the valve opens you will be required to press the white
“RESET” push button on the top of the switch to close the valve and return to
normal operation.
b. There are two possible sites for gauges on a Bag filter housing, make sure any
gauges that are installed are functional. If the gauge is ported into the housing above
the top of the filter bag, its pressure will rise as the bag blinds off. If the gauge is
ported into the housing below the top ring of the bag, its pressure will fall as the bag
blinds off.
Side Stream Bag Filters
c. Side Stream Bag Filters have one advantage over In-Line filters, no moving parts to
trouble shoot. If the bag becomes blinded off, then no flow will be pulled through
the bag and away from the filtration system. However it is very important that you
only open its flow regulation valve only so that 10-15% of the filtration’s flow is
pulled though the bag filter. To make sure this flow requirement is met, utilize an
ultrasonic flow meter, or only open the valve so that a 3 psi pressure drop from the
discharge pressure of the centrifugal separator is seen (pressure with valve open
versus pressure with valve closed). There are two possible sites for gauges on a Bag
filter housing, make sure any gauges that are installed are functional. If the gauge is
ported into the housing above the top of the filter bag, its pressure will rise as the
bag blinds off. If the gauge is ported into the housing below the top ring of the bag,
its pressure will fall as the bag blinds off.
58
Cartridge Filters-
All CHC filter systems that contain a cartridge filter utilize a side stream flow through the
filter.
Side Stream Cartridge Filters have one advantage over In-Line filters, no moving parts to
trouble shoot. If the cartridge becomes blinded off, then no flow will be pulled through the
filter element and away from the filtration system. However it is very important that you only
open its flow regulation valve only so that 10-15% of the filtration’s flow is pulled though the
bag filter. To make sure this flow requirement is met, utilize an ultrasonic flow meter, or only
open the valve so that a 3 psi pressure drop from the discharge pressure of the centrifugal
separator is seen (pressure with valve open versus pressure with valve closed). There are two
possible sites for gauges on a cartridge filter housing, make sure any gauges that are installed
are functional. If the gauge is ported into the housing above the top of the filter cartridge, its
pressure will rise as the bag blinds off. If the gauge is ported into the housing below the top
ring of the cartridge or at the discharge piping, its pressure will fall as the cartridge blinds off.
59
5.4Frequent Pump Seal Failures-
If the pump seal continues to fail frequently (once every 3-4 months or more frequently) check
the following:
1.Is the pump operating at it original design pressures and flows? Verify that the pump
is not operating above or below its specified pressure. Adjust the pressures using the
filter discharge valve or sweeper jets to maintain the appropriate pressures.
2. Is the pump cavitating. If you see air bubbles moving past the flow meter
continuously, this indicates that there is an air leak on the suction side of the pump.
This air can cause the seal to prematurely fail. Find the air leak and fix and replace
the defective parts.
3. If the debris within the water is too great, it can damage the seal more frequently,
EcoWater CHC recommends the use of a Hard faced seal in these type debris
conditions.
4. Running the CHCsystems without water. If water did not flow to the pumps due to
the towers being dry or the customer not opening a valve after cleaning the basket,
these actions can cause the pump seal to fail. Replace the seal.
5. Bearing failure on the pump motor, if there is excessive noise coming from the pump
motor during operation, this can cause the movement in the shaft and can cause the
seal to fail, if there is excessive noise, replace the pump.
6. Impeller blocked or clogged with some type of debris. This can cause an impeller
imbalance and will cause the seal to fail. Remove any debris from the impeller and
replace the seal.
7. Extended period of Off time with water on seal. It is important if the pump will not be
used for extended periods of time > 4 weeks that the pump be started from time to
time to allow the seal to clean itself and to move the stagnant water out of the pump. If
there is no water in the system, drain the pump during storage.
8. If the Motor shaft is bent or the impeller is damaged, this can cause a vibration in the
wet end that can damage the seal. Replace the impeller or the entire pump if needed.
60
5.5Issues with Actuators and Solenoids-
5.5.1Actuator Failure-
Most actuator failures are caused by the failure of the actuated valve. As the actuator is
removed for servicing, make sure the valve is easily opened and closed. Some valves can
become to difficult to move by the actuator and can cause actuator failure. Verify that the fuse
or breaker controlling the timer circuit is still functional, If the fuse and/or breaker is still good,
the failure could be related to the actuator itself, timer, relay and/or the conductivity controller.
Other than the ground there are normally three wires that pass to an actuated valve. A neutral
wire that normally goes to pin 1, and two power wires. If an actuator is not functioning verify
the following pins and if the signals are there, and the actuator is not moving then the actuator
must be replaced.
Some of the actuators are 120 VAC while others may be 24VAC or 24VDC. It is important to
look at the nameplate to define what voltages you will be using for your troubleshooting. Use
your DVM and verify the signals coming into the actuator is the signal is present and the valve
does not open or close, replace the actuated valve.
If your actuated valve is operated by 24 VDC. Then you will see one ground wire and two
power wires. The power wires will reverse their voltage (wire 1= 24 VDC V+, and wire
2=0VDC V- when opening, and then wire 1= 0 VDC V- and wire 2=24 VDC V+ when
closing) normally controlled by a relay.
When ordering a replacement valve you must specify the valve size, and actuator type and
voltage. If the signal is not present refer to Issues with Conductivity Controller for further
information.
5.5.2Actuator Leaks-
If the actuated valve is leaking (could be internal and if so, you will see a continuous flow down
the drain) than that is an indication that the solids that are being purged from the separator may
have damaged the seal on the actuated valve. In this case, replace the valve.
61
5.5.3Non- Functional Solenoid Valves-
A solenoid valve utilizes a control signal to activate a valve. Once the single control signal is
present on the coil of the solenoid, the valve should respond. To verify if a solenoid has power
you will need to understand that when power is applied most solenoids will hum (noise), vibrate
or get hot. You can verify that the control signal is being sent to the solenoid, and if it is and
the solenoid does not respond, turn the power OFF, and then with the use of your DVM in the
continuity mode, you will see some resistance in the solenoids coil (normally between 500 and
2000 ohms). If power is present then verify it gets water pressure from its source tube, if not
verify the in line strainer is not clogged. If you have good water flow but not through the
solenoid, then most likely the solenoid is clogged. Clean or replace it.
5.5.4Stuck Solenoid Valve-
If you are getting a control voltage to the coil and the valve appears to not open, then this could
signal a clog of debris in the valve itself. You will need to open the valve and clean it or
replace it to fix the problem. If a solenoid valve continues to clog, you may want to consider
the use of a strainer up stream (pressure source) from the valve to stop debris from entering the
valve itself. If you find a strainer on the up stream side, make sure that the strainer is cleaned as
appropriate to make sure the system is functional.
In most cases the lack of response to the solenoid reflects a defective coil or valve. Replace the
defective solenoid valve. When ordering a replacement valve you must specify the valve size,
and actuator type and voltage.
62
5.6Issues with Conductivity Controllers-
CHC systems have utilized may brands of conductivity meters. The gray Walchem units, the yellow
LMI units and most recently the CHC Control Stations. Each conductivity meter utilizes a temperature
compensated probe as well as controls the Blow down Valve through the use of an on-board relay
(bleed NO). The following information reflects each model:
5.6.1Probe Cleaning and Calibration-
Always verify that the probe is clean first, do not just look and decide it is clean, always clean it with a
Rydlyme like product. Some scale on the tip may be clear, and so you will not be able to see it. If
there is any exposed metal on the probe tip, replace the probe. Always refer to the manual or
Conductivity Reference found within this manual before you clean a probe. Some probes can only be
cleaned in one direction.
5.6.2Bleed Set Point-
The Bleed Set Point has been chosen ahead of time and will not reflect the current COC. This set point
has been chosen against the worst case water analysis given for that customer. DO NOT adjust it each
time to control the COC. If water quality is better this month, than the COC will increase, if it is worse
than the original bleed set point chosen the COCs may decline, however this set point was chosen to
ensure that the system does not scale up, so Adjustments to the set point must be cleared with
EcoWater CHC Service Personnel.
5.6.3Dead Band Control-
The Dead Band should be adjusted to achieve 10% difference from the Bleed Set Point. If the Bleed
Set Point is 2000, then the Dead Band should be 200, however if the Bleed Set Point is 500 then a Dead
Band of 50 will suffice.
63
5.6.4Walchem-
Most of the Walchems used are the WCT300 and WCT400 series controllers. Please refer to
the attached service manual for information regarding the screen layout and specifics about the
controller. Some of the sites may utilize a WebMaster controller. Please refer to the attached
service manual for information regarding the screen layout and specifics about the controller.
Here is some basic information about the controller that will aid in troubleshooting.
The blow down valve is connected to the bleed function of the controller. Each
controller allows you to manually initiate the valve, refer to manual.
A LOW ALARM indicates that the current conductivity is too far away from the bleed
set point. If this alarm occurs, verify that the conductivity probe is calibrated, the bleed
set point is within its specifications and that the alarm set point is reasonable. Normally
the alarm set point should be at 30-40% for appropriate indication.
The blow down valve will only open if the current conductivity exceeds the bleed set
point.
All conductivity probes except for the toroidal must be verified once a week for
accuracy.
All models utilize a 5A, 240 Volt fuse on F2 that controls the power to the Bleed Relay.
The Webmaster unit requires programming via a USB cable to set the configuration of
the Bleed Relay.
Most Walchem units are wired directly into the 120V relay found in the motor controller
that will remove the control of the blow down actuator away from the Timer. The 120
Volt signal from the NO Bleed relay in the controller passes directly to the coil on the
relay found in the motor controller.
If the controller is wired directly into the Actuated valve, then the NO signal passes to
the OPEN pin on the actuator and the NC signal passes to the CLOSE pin on the
actuator.
All Walchem units have a test feature built in to test the meter as well as the probe, refer
to attached manual.
If the conductivity meter reads “BLEED” even if the current conductivity is blow the set
point and dead bands, then someone may have adjusted the control direction of the bleed
function. Go into the Bleed screens and look under Control Direction it should be set to
HI.
If someone has placed a password into the controller and the password is not “5850” or
one that the customer has added, you can reset the password on each Walchem product.
Please refer to the operation manual for the controller. The WCT series requires the unit
to turned OFF and then press and hold the UP and DOWN keys while turning it on. The
password will be modified back to “1995” as shown on the screen during the keys being
held in.
64
5.6.5LMI-
The only LMI unit used was the DC4000 series controllers. Please refer to the attached service
manual for information regarding the screen layout and specifics about the controller. Here is
some basic information about the controller that will aid in troubleshooting.
The blow down valve is connected to the bleed function of the controller. Each
The blow down valve will only open if the current conductivity exceeds the bleed set
All conductivity probes must be verified once a week for accuracy.
All models utilize a 4A, 240 Volt fuse on F1 that controls the power to the Bleed Relay.
Most LMI units are wired directly into the 120V relay found in the motor controller that
If the controller is wired directly into the Actuated valve, then the NO signal passes to
controller allows you to manually initiate the valve, refer to manual.
point.
will remove the control of the blow down actuator away from the Timer. The 120 Volt
signal from the NO Bleed relay in the controller passes directly to the coil on the relay
found in the motor controller.
the OPEN pin on the actuator and the NC signal passes to the CLOSE pin on the
actuator.
5.6.6CHC Control Station-
The newer CHC skids utilize the CHC Control Station to monitor the conductivity of the system
and control the blow down valve. It utilizes a toroidal sensor that needs to be verified each
month as well as cleaned at least once every quarter. If the conductivity probe fails the
conductivity reading will indicate 0 or 32000. You can use the hidden screen to monitor the
raw analog signal from the sensor, when in air it should read 60K-100 and when in water it
should read 200-4000. If the raw signal does not change verify the presence of the resistor and
check the voltage at the A1 connector. If the voltage does not change, then replace the sensor.
If the raw readings are normal but the meter is not stable, verify calibration or change the
sensor over to the A2 connector and change the VCS software accordingly. The Control Station
controls a relay within the motor starter that is used to control the blow down valve. If you
enter the Bleed screen, you can adjust the set points for the bleed function as well as press the
Bleed Test button to initiate a valve test (reverses current state for a period of 20 seconds).
Refer to the manual in this document for further assistance. If the Control Station Fails, it must
be replaced. Refer to “CHC Control Station Error Codes” for more information
65
5.7CHC Control Station Messages-
5.7.1No Filter Backwash (BW Failure shown on Control Panel’s screen)-
When the Filter’s Backwash has failed this indication will be shown, there are several possible
causes:
Screen Plugged- If the filtration screen becomes plugged the outlet pressure of the filter will be
below 20 psi after a Backwash. If you continue to manually initiate a back wash and the
differential pressure never falls, then the screen may need to be removed and cleaned. Refer to
Filtration Screen Cleaning.
Solenoid Failure- If the solenoid fails, the controller will try to initiate the Backwash cycle,
but no Backwash will occur. To verify disconnect the tubing from the end of the rinse piston
and initiate a back wash. Water should flow (strongly) from the tubing. If no water flows to
the Rinse piston, then verify the solenoid is being energized, if it is the valve must be replaced
or cleaned. Without water being directed to the Rinse piston, the Backwash will not be
completed. This failure could be caused by debris clogging up the screen in front of the
solenoid or a failure of the solenoid itself. If the solenoid has failed, it is recommended that the
screen be cleaned.
DP Switch Failure- If the filter’s back wash can be initiated with the Manual BW button but
does not respond to the DP switch, then it is possible that the switch within the DP switch has
failed. With a volt meter, verify that the switches within the DP switch are closed during
operation (this requires the DP switch gauge to be indicating over 8 psi. If power is not applied
to the skid, the pressure will be reduced and each DP switch should be open as tested with a
conductivity meter.
Transducer Failure- If the filter’s back wash can be initiated with the Manual BW button but
does not respond to the low trigger pressures as set in the CCS settings, verify that the
appropriate pressures as shown on the CCS. If no pressures are shown, then the CCS will not
backwash the filter as needed and you will have to troubleshoot the transducer signals.
5.7.2Screen Cleaning Required Message-
This message indicates that the filter has completed 8000 Backwashes and it is recommended at
that point to remove the screen from the filter, clean it and inspect the screen and suction
manifold for damage. To clear this message, Turn ON the power disconnect, and as the initial
screen is indicated on the Control Station, press the F1 (Set UP) button. A password screen will
appear, press the screen where the password is shown and a numerical keypad will appear.
Enter 1000 and press the Enter/Return button, the screen will revert back to the Password screen
and then press the F3 button to clear the memory. Press the Main button (F4) to return to the
main screen. You will notice that all counters will be cleared with this action.
66
5.7.3Control Panel Message of “Power OFF”-
No action required, this indicates that the motor controller’s HOA power switch is in the OFF
position.
5.7.4Control Panel Message of “Pressure LO”-
This indication is shown when the pressures of the Filter or CHC have not reached the
appropriate pressures. Verify that the strainer baskets are clean, and that no isolation valves are
closed. Other problems may be associated with a pump failure or clog in suction piping.
Contact EcoWater CHC Service for further assistance.
5.7.5Control Panel Message of “Power Failure”-
This indication is shown when the motor starter has recognized a loss of a Supply Phase, or the
motor as caused the failure of the thermal overload. Turn off the power to the motor starter by
turning OFF the power disconnect. Open the motor controller and reset the Contactor’s Reset
knob. Close the motor starter and try to initiate the pump again. If the pump fails to start,
contact the appropriate personnel to verify the power phases as well as monitor the motor’s
amperage. In many cases, problems with the power system due to weather may cause the
thermal overload to fail, if resetting the overload works, please verify the pump motor’s
amperage, if it is within range, monitor the function of the system to see if the failure continues.
Contact EcoWater CHC Service for further assistance.
5.7.6Control Panel Message of “Conductivity HI”-
This indication is shown when the conductivity value is exceeding the upper alarm limits as set
in the Set Up screens. This is normally an indication that the blow down or its piping is
plugged or non functional. It can also be an indication that the make up water source has lost is
supply pressure and make up is not being added to the system fast enough to keep up with the
blow down rate. If the water supply system has failed, take appropriate actions with regard to
the supply, and you may need to turn the Filter skid’s power OFF while the tower’s water level
increases.
67
5.7.7Control Panel Message of “Conductivity LO”-
This indication is shown when the conductivity value is below the lower alarm limits as set in
the Set Up screens. This is normally an indication that a problem with the blow down or filter
back wash system has occurred. Please verify the operation of the blow down valves and filter
back wash functions. This message could also be shown if low load conditions with the water
system are occurring (as in winter) if the load to the system is too low, the conductivity of the
water system may not cycle up to the appropriate COC levels. This message may continue until
the load increases on the water system. Monitor the system routinely to verify that this
condition is associated with the load.
68
5.8Leaks-
The majority of the leaks will require the replacement of the defective parts. However, always verify
that the hardware does not need to be tightened first to correct the issue.
5.8.1O-Ring Leaks or Failure-
Replace defective O-Ring, and lubricate with appropriate silicone lubricant.
5.8.2Flange gasket Leaks-
Tighten the flanges or replace the gasket.
5.8.3Plumbing Leaks or Failure-
Contact the appropriate personnel to make corrections to plumbing.
5.8.4Valve Leaks or Failure-
Contact the appropriate personnel to make corrections to plumbing.
5.8.5Internal Valve Leaks-
In some cases you may find that the blow down actuator has a continuous leak, even in the
closed position. If you find this you will need to replace the blow down valve.
5.8.6Vacuum Leaks-
Vacuum leaks on the CHC system can be a cause for concern, because they can cause a
decrease in the efficiency of the CHC treatment, it is always important to make sure that the
vacuum leaks are corrected with the appropriate actions.
69
5.9Algae and Biofilms-
5.9.1Algae growing in tower in sunlit areas-
This is not a failure. The CHC system can only retard water- borne algae. The use of a
chemical algaecide to treat the algae is recommended unless requested by the customer. You
can also recommend covering the affected areas with a sun screen to reduce the algae growth
rate. Many of our customers have used a cover made out of corrugated fiberglass to cover the
exposed ends of a tower next to the fill, these covers have been shown to be very efficient at
reducing algae growths on the ends of the towers. The use of a Biodispersant has also been
shown to be affective against Algae. The Biodispersant will in most cases release the Algae so
that it can be destroyed by the CHC chamber and removed by filtration. CHC has some
experience with an Ultrasonic Algae killing systems as well as Copper Silver Ionizers. If you
are interested about this system contact EcoWater CHC Service for further information.
5.9.2Biofilms-
This is not a failure. The CHC system can only treat water- borne growths it cannot treat films
growing in the piping or on other surfaces. The use of a Biodispersant has also been shown to
be affective against Biofilms by releasing its grip on the surface until it can be treated by the
CHC chamber. We have seen accounts where they were next to a farm and fertilizer (manure)
was being ingested into the tower and causing a food source for the biofilm. I am also aware of
a food plant that also uses their cooling water to cool a process, where product was getting into
the cooling tower water causing a biofilm growth. It is important that you not only treat the
symptom, but you must also find and treat the source.
70
5.10Scale-
Scale formation within a system can occur for many reasons. This section outlines the items to do and
check to aid in CHC’s determination of possible causes for scale formation .
There are three major types of scale that can form within a treated system. They include Hard Scale
(like glass), Soft Scale (reformed granular or sandy sludge), Silica Scale. Some other forms of scale
have also been discussed.
5.10.1 Hard Scale
Hard Scale is an indication that either the CHC treatment is not working as well as it should, or
that the cycles of concentration are too high. Thing to verify are as follows:
1. CHC function:
a. Is the pressure on the CHC unit appropriate (78-85 psi for a CHC 20, 88-105 for all
other CHC units.). Some causes for pressure loss may include suction side vacuum
leak, plugged strainers, incorrect valve positioning, plugged suction manifold or line,
loss of system power, defective pump, plugged CHC nozzle channels or loss of
pump prime due to air entrapment in pump or piping. Verify the cause and take
appropriate action. All gauges must be verified by turning the system off and the
pressure should decline back to 0, and then back on to measure the pressure.
b. The vacuum must be at least -25 inHg.(may vary depending upon elevation of the
site). Loss of vacuum may be associated with a leaky gauge, tube, connection and or
fitting, low pump pressure, plugged nozzle and or too much back pressure on the
chamber.
c. Back Pressure too high or too low. Back pressure must only be 2-5 psi. if it is too
low or too high make sure to adjust.
d. Alignment of Nozzles. As the water enters the end bells it should not enter one of
the nozzle’s channels directly. It should however, pass directly to the blank area
between two channels. This verification requires a visual inspection of the nozzles.
e. Inappropriate Venting of discharge. If the discharge of the CHC discharge drops
and is not vented, a siphon can occur causing an abnormal backpressure on the
cavitation cloud, it is important that the gasses are released to the atmosphere, and
that the back pressure is controlled within acceptable limits.
f.Inappropriate distribution of treated water. When one CHC unit is treating multiple
towers or sumps and you have a scaling problem on one of the towers, this is a
possible indication that the treated water is not being dispersed to all towers equally.
You will also want to verify that the suction from the tower is equal to the others as
well.
g. The CHC nozzles may be blocked. Open the chamber and make sure the nozzle
ports are open and free from any large debris.
h. The CHC is undersized. This can occur when the initial quotation information was
gathered. It is possible that if the system water volume was underestimated, the
quoted CHC treatment required can be undersized and will require an upgrade. This
can also be the result of a significant change in Make-Up water hardness or Silica
levels.
71
2. Cycles of Concentration too High
a. Conductivity Meter is out of calibration- The meter may not have been routinely
calibrated to ensure accuracy. The calibration may have been affected by using an
out of date calibration standard, once the standard is used passed 50% or is brown in
color, EcoWater CHC recommends discarding the standard and opening a new one.
Verify the correct units of measure are used from the calibration standard label. The
probe may be dirty or scale may have formed on the tip affecting calibration (use
Rydlyme and or a mild soap solution to clean the probe tip as instructed in the
manual). The probe may be defective (normally seen by a probe that is out of
calibration by more than 100 points routinely (complete self test of probe on all
Walchem units)). A defective meter can also cause an out of calibration situation, if
the meter will not calibrate to match a calibration solution or it fails the self test
function (Walchem only) replace the meter. Always compare the readings of the
conductivity meter against a known good meter.
b. Inappropriate or inadequate flow across conductivity probe. If there is not enough
flow across the conductivity probe, its readings can be lower than normal causing
the system to cycle up and scale. It is important to have at least 5-8 GPM flow
across the probe to ensure accurate measurements. EcoWater also recommends that
a submerged probe is not placed into the tower, these types of applications can also
give an erroneous measurement value causing cycles to climb.
c. Suction piping too close to Make-Up water distribution. If the suction piping is too
close to the Make-Up water’s valve, you can get a conductivity reading that is
diluted with the lower Make-Up water’s conductivity. This will cause the actual
tower water’s conductivity not to be measured and the blow down will not occur
when expected causing high cycles of concentration.
d. Incorrect Bleed Set Point. Verify that the Set Point value is appropriately selected to
match the desired cycles of concentration as compared to the conductivity to the
Make-Up water, or as specified by water analysis.
e. Inoperative Blow Down Valve. Verify that the valve opens and closes as instructed
by the conductivity meter as well as the combo timer, failures could be associated
with a defective valve, relay, timer or conductivity meter. You must verify that
water is drained from the system as the valve is opened and closed. The drain flow
must be strong and represent pump pressure during the opening of the valve.
Inappropriate flow may be an indication of an incorrect setting of the flow
regulation valve, plugged separator drain or plugged piping.
f.Scale can also be caused by flow problems within the customers system. If the
water is suddenly stopped or weakened in flow within the heat exchanger or
condenser, the temperature at those sites can suddenly increase causing scale to
form.
72
5.10.2 Soft Scale
Soft Scale formation and or accumulation is an indication of filtration system inadequacies.
Two primary types of this scale include reformed granular and sandy sludge. Reformed
granular scale becomes compacted and hard as it accumulates, while sandy sludge scale remains
mud like as long as it remains wet. Things to verify are as follows:
1. Inadequate sweeping of the tower or basin floor. Check for placement on nozzles to verify
that debris is being swept towards the filtration suction and not the system suction. If debris
passes into the system suction, it can be ingested by their pumps, ground up and then
deposited into the fill or other areas creating reformed granular scale. If the scale is not
ingested by the system pump and remains in the basin, it can form the sandy sludge that
remains until removed. If the sweeping system is to strong so that it stirs instead of
sweeping the debris towards the suction manifold, this action can also make the debris pass
up the suction manifold and enter the system pump.
2. Placement and or design of the suction manifold. Check the placement of the suction
manifold, it should be located between the normal water flow within the sump or tower and
the system suction. If debris passes into the system suction, it can be ingested by their
pumps, ground up and then deposited into the fill or other areas creating reformed granular
scale. If the suction manifold does not create an adequate flow velocity, debris will not be
removed from the basin floor, so verification of the design of the suction manifold is
required.
3. Frequent Cycling of towers. If the towers are cycled on and off frequently, water will
remain in the fill and as evaporation occurs, its solids will deposit in the fill. It is important
that if the system is cycled frequently, that the fans be left on for a period of a few minutes
to draw any remaining water from the fill there by decreasing any possible formation of this
type of scale.
4. Restricted suction piping. If the suction piping has become clogged with debris, its ability
to pass water to the pump is diminished. Cleaning or replacement of the clogged pipe will
be required.
5. Inappropriate DP of Separator. Separators require a minimal 3 psi pressure drop across the
incoming and outgoing lines. If there is not enough pressure drop across the separator, this
indicates that the wrong separator has been installed, or that the flow has been compromised
within the system. A weak pressure drop is an indication that the water is not spinning
within the separator fast enough to ensure separation of heavy particles from the water.
6. Bags or cartridges not being replaced or cleaned as needed. Many systems are designed
with the use of bag or cartridge type filter systems. If they become full of debris and not
replaced as needed the debris will not be removed from the system as needed and will
remain in the water possibly causing scale to form.
7. Bag filter Bypass Failure. As in line bag filters become full they are designed to increase
the pressure in the system causing a pressure sensor to open a bypass valve and allow the
water to bypass the full bag. If the bypass system does not open, the flow of filtered water
back to the tower or sump will be compromised and possibly causing scale to form.
8. Low pressure within filtration system. Low pressure within the filtration system can be
caused by clogging of the basket strainer, clogs or restrictions in the piping, pump failure or
valve positioning problems. Low pressure normally means that filtration will not be
appropriate and that the unit will not remove enough debris from the system to stop scale
formation.
73
5.10.3 Silica Scale
Silica Scale is a type of scale caused by dissolved Silica levels in the basin increasing above the
point in which they can no longer sustain solubility. This type of scale will be deposited on
heated surfaces and is not affected by acid and must be removed my manual means. Things to
verify are as follows:
1. Cycles of Concentration too High
a. Out of calibration- The meter may not have been routinely calibrated to ensure
b. Inappropriate or inadequate flow across conductivity probe. If there is not enough
c. Suction piping too close to Make-Up water distribution. If the suction piping is too
d. Incorrect Bleed Set Point. Verify that the Set Point is appropriately selected to
e. Inoperative Blow Down Valve. Verify that the valve opens and closes as instructed
f.Scale can also be caused by flow problems within the customers system. If the
g. Changes in Make-Up water chemistry or source can affect the ability to form scale.
2. Cycles of Concentration did not reflect current Silica levels in the Make-Up water. If the
Silica levels within the Make-Up water suddenly increase, it is possible that the sump levels
accuracy. The calibration may have been affected by using an out of date calibration
standard, once the standard is used passed 50% or is brown in color, EcoWater CHC
recommends discarding the standard and opening a new one. Verify the correct
units of measure are used from the calibration standard label. The probe may be
dirty or scale may have formed on the tip affecting calibration (use Rydlyme and or
a mild soap solution to clean the probe tip as instructed in the manual). The probe
may be defective (normally seen by a probe that is out of calibration by more than
100 points routinely (complete self test of probe on all Walchem units)). A
defective meter can also cause an out of calibration situation, if the meter will not
calibrate to match a calibration solution or it fails the self test function (Walchem
only) replace the meter.
flow across the conductivity probe, its readings can be lower than normal causing
the system to cycle up and scale. It is important to have at least 5-8 GPM flow
across the probe to ensure accurate measurements. EcoWater CHC also
recommends that a submerged probe is not placed into the tower, these types of
applications can also give an erroneous measurement valve causing cycles to climb.
close to the Make-Up water’s valve, you can get a conductivity reading that is
diluted with the lower Make-Up water’s conductivity. This will cause the actual
tower water’s conductivity not to be measured and the blow down will not occur
when expected causing high cycles of concentration.
match the desired cycles of concentration as compared to the conductivity to the
Make-Up water, or as specified by water analysis.
by the conductivity meter as well as the combo timer. You must verify that water is
drained from the system as the valve is opened and closed. The drain flow must be
strong and represent pump pressure during the opening of the valve. Inappropriate
flow may be an indication of an incorrect setting of the flow regulation valve,
plugged separator drain or plugged piping.
water is suddenly stopped or weakened in flow within the heat exchanger or
condenser, the temperature at those sites can suddenly increase causing scale to
form.
If the source for Make-Up water changes or chemistry changes it is possible that the
Cycles of Concentration could be affected and promote scale formation.
74
of Silica may increase above the level of sustained solubility. At this level Silica can scale
out on the hot surfaces..
3. Frequent Cycling of Equipment. If the system pump is stopped before the heat has been
removed from heat exchanges, compressors, or other hot items, Silica scale can be formed
on the hot surfaces.
5.10.4 Ingestion Scale
Ingestion Scale is normal, if the environment has many forms of airborne debris that can be
ingested into the towers. This type of scale can look very rough and in many cases can look
like feathers or stalactites that hang onto the fill. You will also see ingestion scale on the
louvers or under the drip guards at the mist illuminators. The buildup on the tubes is normally
only on the lower tubes and are soft to the touch. They normally break very easily and can be
removed with a pressure washer under normal tower cleaning. If Ingestion Scale is found, the
use of alternate types of filtration may be warranted. Examples of Ingestion Scale forming
material: Concrete dust, sand, dirt as well as other airborne debris.
5.10.5 Overspray Scale
Overspray Scale is normal, if overspray reaches areas where there is not adequate water flow to
keep the surface clean. This light misting can evaporate and deposit its solids as a formation of
scale. This type of scale formation is normal and should be addressed during routine
maintenance
5.10.6 System Cycling Fill Scale,
If scale appears in the fill of systems where the pumps and fans are routinely cycled, water is
left in the fill, and as it evaporates, its solids will be deposited in the fill. To diminish this
effect, instruct the customer to leave the fans on for an additional five minutes after the pumps
stop to draw out any remaining water from the fill. This action will reduce the amount of debris
that will be available for scale formation.
75
5.10.7 Cotton like Fill Scale
Cotton like Fill Scale is normal and occurs on the leading edge of the fill, it occurs because of
the high evaporation rate at this leading edge and the diminished flow that is normally found at
this area of the fill as well. This type of scale is normally very soft and can be removed with a
manual spray nozzle cleaning as needed.
Example Pictures:
Soft Sandy Scale buildup
Mud like buildup of Soft Scale
76
Soft Scale that is granular but hard from basin
Soft Scale from tubes that is very granular
77
Hard Scale from tubes that is hard like Glass
78
6.0REFERENCES
The references attached to this document represent the specific CHC products and the literature
prepared by CHC all other reference material including service manuals are included on this CD
for your use.
79
6.1Corrosion Coupons
All CHC Equipment is supplied with Corrosion Coupon Racks installed. These racks allow for the use
of Corrosion Coupons to measure corrosion rates within the cooling system.
Normally, EcoWater CHC recommends allowing at least 90 days from date of installation before the
initial coupons are installed. These 90 days allow for the system to become accustomed to nonchemical water treatment, as well as gives the required time to bring the cycles of concentration to their
specified value.
Once the coupons are installed they will be removed and sent to a lab for analysis. The lab will then
issue a report stating the corrosion rates as measured from the before and after coupon weights.
Coupons come in many different metals. They are intended to be placed into our PVC coupon rack for
at least 60 days to yield accurate corrosion rates. CHC’s coupon racks allow for the use of any three
coupons at one time. We recommend selecting a coupon choice that will best represent the metal
content of the cooling system. The coupons that are available from EcoWater CHC include the
following:
EcoWater will supply Maintenance Agreement customers with two sets of coupons per year. The
normal coupon selection depends upon the tower type and its use.
Examples:
If a customer has an Evaporative Condenser with a Galvanized basin, EcoWater CHC will
supply a Scale coupon and a Mild Steel coupon.
If a customer has an Evaporative Condenser with a Stainless Steel basin, EcoWater CHC will
supply a Scale coupon, a Mild Steel coupon and a Stainless Steel coupon.
If a customer has a Cooling Tower with a Galvanized Basin or a Stainless Steel basin,
EcoWater CHC will supply a Scale coupon, a mild Steel coupon and a Copper coupon.
Other coupon configurations are available upon the request of the customer.
Installing the Corrosion Coupons
Most systems includes the provision for conducting Corrosion Coupon Testing. To conduct this test
you will first need to request coupons from EcoWater CHC. These coupons will be installed for no
less than 60 days before they are removed and weighed. The coupons can be installed up to 120
days before removal.This installation requires the use of Nitrile Gloves to insure no
contamination of the coupons occur.
80
IsolationValve
Flow
Meter
Corrosion Coupon Rack
Coupon Holder Rod
Holder Rod
RodNut
IsolationValve
Holder Rod withCoupon
To install the Corrosion Coupons follow these steps:
1. Acquire the coupons, the configuration of coupons will depend upon the type of cooling system
you are using. Refer to the statement on the first page of this document.
2. When placing coupons, the Copper coupon will be first coupon that the water will come in
contact with and the Scale coupon will be the last.
3. Turn off the two isolation valves at the rack to stop all water flow.
4. Loosen the nut securing the coupon holder.
5. Remove the coupon holder rod from the coupon rack.
6. Remove the coupon installation screw from the coupon holder.
7. Place a coupon over the holder and secure with the installation screw.
8. Place the holder back into the rack so that the coupon is extended into the water flow tube in a
vertical position. Do not place the orientation of the coupon in a horizontal position, if
horizontal, the coupon can act like a shelf and support debris that maybe detrimental to your test
results.
9. Secure the holder into place by tightening the holder nut.
10. Open the rack’s isolation valves.
11. Verify that the flow across the coupons is between five and eight GPM as shown on the flow
meter.
12. Mark the coupon envelopes with the date of installation and place in a secure location for use
upon the completion of the testing.
Removing the Corrosion Coupons
1. Turn off the isolation valves at the rack to stop all water flow.
2. Loosen and remove the holder nuts.
3. Slide out the holders, exposing the coupons.
4. Remove the coupon retention screws.
5. Remove the coupons, wipe them clean with a damp cloth.
6. Place each coupon back in its original envelope.
7. Place the retention screws back into the coupon holder rods.
8. Slide the coupon holder rods back into the rack.
9. Secure all rods by tightening their corresponding nuts.
10. Open the isolation valves and make sure no leaks are present.
81
11. Adjust the flow meter until the five to eight GPM flow rate is achieved.
12. Return the coupons to EcoWater CHC for examination and analysis.
13. A report will be generated and returned to you with the results.
82
6.2Conductivity Controllers (Walchem and LMI)
838485
6.3Timed Power ON/OFF Cycling of CHC Treatment
Not all customers require 24/7/365 operation of the CHC Treatment. The CHC treatment system is
designed to treat the water within the system whenever there is a load present on the system, as well
as periodically treat the water on a non-loaded system to enhance the calcium removal and control
bacteria growth.
So when a customer asks “Do we have to operate our CHC unit and Filtration units 24/7?”. And
the answer may surprise you. “Yes and No.”
Let me explain:
Evaporative Condenser Customers-
For a customer who has an Evaporative Condenser and runs their system dry for extended periods
of time throughout the winter. We can help.. These types of customers frequently use an indoor
drain down sump, and it is that sump that our CHC and Filtration systems treat. We can work with
each customer to customize a schedule to power ON and OFF the systems to maintain treatment of
their sump while minimizing the Bacteria growth. We have also suggested the use of Bleach (we
have an application formula) to increase the OFF time of the systems. These types of customers
can greatly save on energy if they use this approach.
Other Evaporative Condenser Customers do not use a drain down sump, but may also be able to
utilize this Power Cycling approach. Only customers who have a heated basin, and have insulated
and heat taped the CHC systems can use a similar approach. Other customers may not need to
utilize this approach if they currently drain their systems during the winter and leave our systems
Off anyway. If the customer stops the CHC and Filtration systems and does not have them
winterized or drained, the system may freeze and could possibly destroy gauges, pipes, strainers
and even pumps. So we are very selective about who we share this ON/OFF Power Cycling
approach with.
Cooling Tower Customers-
Most Cooling Tower customers utilize a chiller and would never qualify for the use of the above
mentioned approach to energy conservation. However, there are customers who do not use their
chillers in Winter, and move towards the use of a heat exchanger instead or only use the Cooling
Tower on the work days and not on the week ends. These type of customers could utilize this
approach and save money.
New Customers-
As we qualify each new customer, we need to keep in mind the types of towers they have as well as
their current usage through out the year. If that information is sent to CHC for quote with any
further information about the customer’s desire to be energy efficient, EcoWater CHC can look at
this information and suggest the use of energy efficient pumps (cost premium), or the use of a
Power Cycling Schedule or both. In any way, the customer should feel that EcoWater CHC offers
more than just water treatment, it offers the engineering, sales coordination and care about our
customers to make their application a success.
86
6.4Separator Purge Timer
Adjusting the Separator Purge Timer
A115Y1
Dial A adjusts the
range values of B
Dial C adjusts the
range values of D
ON
Time
OFF
Time
1-10min
6-60
1-10
.1-1
4
3
2
1
1-10min
6-60
1-10
.1-1
4
3
2
1
1816 A2
6-60min
1-10h
10-100h
6
6-60min
1-10h
10-100h
6
A
7
8
9
10
B
C
7
8
9
10
D
E
IfAis adjusted for 6-60 than the range for
B will be 6-60 seconds with 1 on B
representing 6 seconds and 10 representing
60 seconds. So if you want 18 seconds ON
you will need to adjustA to 6-60 and B
will need to be set on 3 (3 x 6 = 18)
If C is adjusted to 1-10h than the rangefor
D willbe1-10 hours with 1 on D
representing 1 hour and 10 representing 10
representing 10 hours. So if you want
3 hours OFF time, you will need to adjust
C to 1-10h and D to 3.
As long as you remember thatthe white
dialabove the bluedial sets the range of the
blue dial, and you carefully set thewhite
dialyou can adjust thetimer’s ON and
OFF times
The rate of Flashing of the indicator E
represents the status of the timer. If E
flashes quickly than thetimeris in the ON
state, while if it flashes slowly, itrepresents
the OFF state.
Whenever power is turned OFF and the
back ON the timer will initiate theON
statefor theperiod selected by the ON
Time dials. Once that period is complete
it willstart theOFF state time as selected
by the OFF TimeDials.
87
6.5Freeze Protection Options
Freeze Protection is normally the responsibility of the Customer. EcoWater CHC does recommend the
use of Freeze Protection in locations where freezing can occur with power outages. Due to the
geographical location or system usage, EcoWater CHC reserves the right to require Freeze Protection
and may adjust the Maintenance Agreement pricing to ensure such protection is taken.
Under normal conditions, if the system is powered, the piping will not freeze as long as the flow in the
piping is maintained. Most customer systems contain water that is heated by the use of a heater or from
the load on the system. Under these conditions the system will not have a problem unless power is lost
or upon pump failure.
Some customers do not require Freeze Protection due to their geographical location, physical
installation area (indoors) or they may have chosen to run the systems dry in the winter and drain the
CHC system during those months.
There are several levels of protection that can be used to protect the system. The cost of each level
differs depending upon the overall systems complexity and customer’s needs. Here are several levels
and their associated advantages and disadvantages arranged for the least expensive to the most
expensive:
1. Not-Recommended
a. AS-IS from factory with normal power- This level although the most cost effective, has
several disadvantages. The first and strongest is loss of power, if power is lost or the
pump fails, water stops to flow within the system and freeze damage can occur. If the
pump fails for any reason or power is lost, the customer must become aware of the
failure, and then take action to isolate and drain the piping to ensure against freeze
damage.
b. AS-IS from factory with uninterrupted power- This level although cost effective, also
has several disadvantages. The first and strongest is pump failure. If the pump fails for
any reason the customer must become aware of the failure, and then take action to
isolate and drain the piping to ensure against freeze damage.
2. Conditionally Recommended (Requires Customer Service Personnel Diligence)
a.Upgraded at Factory with Pump Indicator and using uninterrupted power- Same as that
found in #2, however an indicator is added to the system that allows the customer to be
notified of a pump failure with the use of an external indictor placed in an appropriate
location or interfaced into the site’s monitoring system. The customer’s service
personnel would then be responsible to isolate and drain the system upon failure to
ensure against freeze damage.
3. Recommended
a. Upgraded at Factory with Pump Indicator and AUTO Isolation and Drain. This
modification to the system allows for the system to monitor the power of the pump and
pressures and then AUTOMATICALLY closes the isolation valves located at the
towers, and then opens the drains at the skid when a pump failure is detected. The
system then notifies the customer through a separate indicator as in #3. This type of
protection requires the use of an uninterrupted power source.
88
b. Heat Tracing and Insulation- Heat Tracing and Insulation only helps in instances where
the customer has the CHC and Heat Tracing on an uninterrupted power source. If the
system is installed without uninterrupted power, and a power failure occurs the
temperature of the piping and system will fall allowing for possible freeze damage.
Here again, the customer’s service personnel will be responsible to isolate and drain the
system to protect against freeze damage if the power stays off for extended periods.
Heat Tracing and Insulation also requires for the piping of the skid itself to be protected.
c. Upgraded at Factory with Heated Skid Housings- This level utilizes a heated skid
housing that protects the piping within the skid upon pump failure. The design of the
skid will be modified to internalize the Flow Meter, Conductivity probe and Corrosion
Coupon Rack It requires the use of Heat Tracing and Insulation to protect the piping
from the skid to the towers. This option yields the cleanest installation maximizing
serviceability, however is the most costly of the options.
If you have any questions about Freeze Protection, you can contact EcoWater CHC Technical Services
at 800-722-0476.
89
6.6Routine Maintenance Procedure
This procedure covers all CHC systems
All Systems, although they may look different, are generally made up of the same parts. This procedure
utilizes examples of item locations that may differ from those found on your skid. Please refer to the
Service Manual that is specific for your customer’s site for detailed equipment explanation.
Each section reflects the type of unit you have in front of you. Make sure that the section you are using
reflects the equipment that is at that customer site. Some examples of different types of equipment and
their gauge locations are shown at the end of this section and can be used for reference. However, not
all equipment may look like the examples, so they should only be used as examples.
This procedure reflects those sections of the Customer Service Report (CSR) as they appear from top to
bottom. Each section is important and you should take your time and make sure the corresponding
information is complete and accurate. If you have questions about so of this content, please contact
EcoWater CHC Service Personell.
Steps to be taken during a Repair are shown in Red.
Steps to be taken during a Mechanical visit are shown in Blue.
Steps to be taken during a Quarterly Service are shown in Green.
Steps to be taken on every visit are shown in Black.
Make sure the customer (end user) understands the Service offering and their responsibilities (PM’s)
oDefine the customers care requirements (PM’s)
oDefine the outlay of information and reports from EcoWater CHC
oInitiate chain of communication:
Know who is the contact person?
Know who requires the reports and water analysis?
Know and understand the site (customers) policies and procedures while on their site.
Know what days and times are better for the customer for site visits.
Scheduling
oNotify the customer of scheduled visit.
Request and provide the following information
Are there any issues, concerns and or comments?
Are there any new hires that need to be trained on the system?
Explain what type of service you will be performing.
Conduct Service according to the Specified Service Flow
SERVICE FLOW
1. Choose one of the following CSR Types
a.Regular
b. Mechanical performed by EcoWater CHC Service Technicians
c.Service by EcoWater CHC (any repairs)
2. Service by EcoWater CHC (REPAIRS)
a. Enter the date of the service repair request
b. Enter the creator of the service repair request
i. Customer
ii. Service Rep
iii. On Site Service Tech
iv. Other EcoWater CHC Personnel
90
c.Enter the reason for the Service Repair Request
d. Record all parts used to make the repair
e.In NOTES enter the cause of the problem and any notes relevant to the issue.
3. Perform a walk-around while visually inspecting the entire skid and plumbing
a.Looking for any issues, such as leaks, broken items, general condition
b. Make sure indicator lights are functioning properly.
4. Record CHC Chamber gauge pressure /transducer display
5. Record Separator inlet and outlet pressures/transducer display
6. Record Auto Filter inlet and outlet pressures/transducer display
a.Verify DP less than 3
7. Record Conductivity controller conductivity reading
8. Record Conductivity controller conductivity unit of measure
9. Record Conductivity controller Blow Down set point
10. Record Backwash count
11. Auto Filtration – Initiate an “Manual Backwash”
12. Record Separator Purge Timer/Blow down settings
a.Timer ON/OFF
13. Turn off power to the pump (COMBO)
14. Turn off power to the CHC Chamber and Filter pumps
15. Verify that the CHC gauges/transducer display returns to zero
16. Verify that the Separator gauges/transducer display returns to zero
17. Verify that the Auto Filter gauges/transducer display returns to zero
18. Turn off main power disconnect (COMBO)
19. Turn off main power disconnect to the CHC Chamber and Filter pumps
20. Open the Motor Starter box (MECHANICAL)
21. Check all electrical connections (MECHANICAL)
22. Grease Pump(s) (MECHANICAL)
23. Cycle all Butterfly and Ball Valves
24. Valve off the strainer(s)
25. Check and clean the strainer(s)
26. Remove, check and clean Auto Filtration Screen (MECHANICAL)
27. Clean any inline strainers (found on ¼” tube associated with Auto Filters)
28. Remove and clean the conductivity probe leave in the open air.
29. Remove Coupons (MECHANICAL)
30. Install Coupons (MECHANICAL)
31. Turn main power disconnect on (PLC)
32. Confirm that the Conductivity reading is at zero
33. Reinstall the Conductivity probe.
34. Calibrate Transducers (if Needed)
a.Refer to REFER TO “CHC PLC Sensor Calibration Procedure” instructions
35. Calibrate Conductivity probe
a.Refer to REFER TO “CHC PLC Sensor Calibration Procedure” instructions
36. Open all valves to their operational settings
37. Turn Main Power Disconnect ON to all skids (MECHANICAL)
38. Turn ON Pump(s)
39. Record Amperage reading and Pump FLA rating for: (MECHANICAL)
a. Single pump (COMBO)
b. Filtration Pump
c.CHC Chamber Pump
91
40. Turn OFF Pump(s)
41. Turn OFF Main Power Disconnects (MECHANICAL)
42. Close Motor Starter Box(es) (MECHANICAL)
43. Turn ON Main Power Disconnect (MECHANICAL)
44. Enter F1 Set Up Screen (MECHANICAL)
45. Turn ON Pump(s)
46. Verify and record CHC Chamber gauge Pressure /transducer display
47. Verify and record Separator inlet and outlet pressures/transducer display
48. Verify and record Auto Filter inlet and outlet pressures/transducer display
a.Verify DP less than 3
49. Record Conductivity controller conductivity reading (AFTER CALIBRATION)
50. Water samples are to be taken from each sump and make up source.
a.The samples are to be shipped to EcoWater CHC.
b. Each sample must be labeled with the following information:
i. Location
ii. Date
iii. Type Sump (CHC) or Make up
1. Include the sump number or identifier when multiple sumps are being treated.
51. Water Samples and Biological Testing (MECHANICAL)
a. Water samples are to be taken from each sump and make up source.
b. The samples are to be refrigerated and shipped to EcoWater CHC OVERNIGHT for biological
testing
52. Dip Slides are to be taken from each sump sample and results recorded and reported to EcoWater CHC after 48
hours
a.All results greater than 10,000 need to be photographed and submitted to EcoWater CHC.
53. 2ndVerification that all valves are in their normal operating position.
54. Touch up painting of EcoWater CHC and Filtration components (MECHANICAL) <FSA>
55. Repeat the above for Filtration Systems #2 and #3 if applicable
56. Meet with Customer to discuss findings
57. Review and photograph the following tower elements (MECHANICAL+)
a. I would like this to happen on all MECHANICAL visits
b. Tube bundle condition
c.Basin condition
i. CHC nozzle function
ii. CHC suction manifold function
iii. Tower pump suction screen (Customer to clean if needed)
d. Tower spray nozzle function (Customer to clean if needed)
58. Make recommendations to customers (EcoWater CHC Employee)
59. NOTES:
a.Each section in Ulysses will have a “Notes:” section. Add any pertinent notes to the appropriate section.
b. Record ANY notes that do not meet the parameters above.
c.Note ANY customer concerns and or comments.
d. Copy all customer concerns and comments into EcoWater CHC only notes.
60. EcoWater CHC ONLY NOTES:
a.Record any notes that you feel need to make EcoWater CHC aware of. These notes are only visible to
EcoWater CHC.
92
Customer evaluation and training.
Timely delivery of accurate reports.
Timely shipment of water samples for analysis.
Discuss Service Visit with the appropriate customer contact.
Verify follow up with regards to notes and customer comments.
Refine schedule as needed.
Your EcoWater CHC Field Technician will be contacting the customer upon receipt of the submitted CSR in
Ulysses.
Notify Carl Steffen via email SteffenC@ECOWATER.COM of any items that need to be addressed. Please use
the following phrase in the subject line of the email “SERVICE ACTION REQUESTED”
6.7CYCLES OF CONCENTRATION
What are Cycles of Concentration? Cycles are not the flow cycles of water in the system. It is a
comparison of the concentrations of dissolved salts in makeup water and basin water. Because of
evaporation, H2O left water to evaporate and leave the dissolved salts in cooling water. So the
concentration of the dissolved salts in the cooling tower water will increase. Cycles of 2 means the
concentration of certain species (like sodium or chlorides) in the cooling tower water are 2 times the
concentration in the makeup water.
How do you calculate cycles? The easy, and most popular method is to use TDS (Total Dissolved
Solids). Cycles are equal to the TDS (or conductivity) ratio of basin to makeup. This is based on the
assumption that all dissolved constituents in makeup will still be in basin water. The evaporation is the
only source for changes in concentration. This is true for systems with a successful chemical treatment.
But for water treated by CHC, parts of the dissolved calcium and bicarbonate are transformed into
calcium carbonate solids. TDS is only good for estimating the cycles, EcoWater CHC recommends the
use of chloride concentrations to calculate the actual cycles.
If the makeup and blow down rates are known, cycles can also be calculated by the ratio of makeup
volume to blow down volume. This method will give an average cycles over a certain time period,
instead of a snap shot value when using TDS or chloride.
TDS vs. cycles: When we tell customers we are going to reduce blow down significantly, the
customers may think there will be a huge bump up in cycles and TDS. Yes, cycles will go up, but not
necessarily TDS. Let's look at this in detail:
When using chemical treatment, acids or scale inhibitors are used to prevent the precipitation of
calcium carbonate, so all the dissolved solids from makeup will stay in the water. Therefore the TDS
of the cooling water is linearly proportional to the makeup TDS and cycles:
TDS (basin) = TDS (makeup) * cycles
Actually, the TDS (basin) may be even higher, because of the addition of treatment chemicals. This is
usually negligible; but for some water having very low TDS, such as water from the Pacific North
West, the contribution could be noticeable.
When water is treated by CHC, reactions in the CHC chamber will force some dissolved Calcium and
93
bicarbonate to form CaCO3colloids. These colloids are very small and are still suspended in water, but
they are not dissolved anymore. They are in a solid state, instead of a dissolved state. All other species,
such as chloride, sulfate and potassium will not be affected by CHC treatment. Formed CaCO3may
also contain a small percentage of Mg, but most of Mg will be in water. So the TDS (basin) will not
linearly increase with cycles. The increase of TDS (basin) will be slower with cycles than in chemical
treatment. Let's look at an example:
The is the makeup water analysis:
Calcium=100 ppm as CaCO
Magnesium=30 ppm as CaCO
3
3
Sodium=7 ppm as ion
Bicarbonate= 100 ppm as CaCO3(for most water, alkalinity = bicarbonate)
Chloride= 25 ppm as ion
Sulfate= 10 ppm as ion
The TDS of this water is 89 ppm
When using chemical treatment, at a cycles of 3, the water chemistry will be like this:
Calcium= 300 ppm as CaCO3
Magnesium= 90 ppm as CaCO3
Sodium= 21 ppm as ion
Bicarbonate=300 ppm as CaCO3
Chloride= 75 ppm as ion
Sulfate=30 ppm as ion
So everything is increased 3 times, including TDS: TDS = 267 ppm.
However, when one uses CHC treatment, some Calcium and bicarbonate are converted to CaCO
3
colloids, so at a cycles of 3, the water chemistry will be the same except Calcium will be ~ 150 ppm as
CaCO3and bicarbonate will be ~ 150 ppm as CaCO3. e.g., magnesium, sodium, chloride, sulfate
increase 3 time, but calcium and bicarbonate increase less. This water has a TDS of 208 ppm. See the
difference? TDS only increased to 2.3 times. So cycles measured from conductivity is 2.3 whereas the
real cycles are 3.0. Substantially less water was blown down than what the conductivity based cycles
indicate.
94
6.8Basic Water Chemistry and Understanding the Water Analysis Results
The water analysis provided by EcoWater CHC can be difficult to understand. However, by
understanding the terms shown in that analysis, you can make sense of your water analysis.
Example of Water Analysis provided by EcoWater CHC
A standard water analysis includes pH, alkalinity, total hardness, calcium hardness, magnesium
hardness, chloride, TDS, conductivity, cycles of concentration and bacteria population. Other analyses,
such as silica, zinc, copper, iron are also performed for some cases.
95
Terminology
+
-
pH: The pH is a measure of acidity or alkalinity of water. pH < 7 is acidic, pH > 7 is alkaline and pH
of 7 is neutral. As pH increases, water becomes less corrosive but the scaling tendency of some
insoluble salts, such as calcium carbonate and calcium phosphate, increases. Each time you descend a
whole number (for example: from 7.0 to 6.0), the acidity of solution increases by a factor of 10. Thus, a
pH of 6 is 1000 times more acidic than a pH of 9.
The pH Scale
RangepHH
Concentration
OH
Concentration
Substance
Examples
010.0000000000000
1
10.10.0000000000001Battery acid
20.010.000000000001Lemon juice
Acid30.0010.00000000001Vinegar
40.00010.0000000001Orange juice
50.000010.000000001Coffee
60.0000010.00000001Normal rain
Alkalinity (Alk.): Alkalinity is a measurement of the buffering capability of water with the addition of
acid. With the addition a certain amount of acid, pH can lower dramatically for water with low
alkalinity, but pH only decreases slightly when its alkalinity is high. The main contributors of alkalinity
are carbonate ions, bicarbonate ions, hydroxide ions, and dissolved CO2present in water. For most of
waters, bicarbonate (HCO
-
) is the dominant contribution to alkalinity. Alkalinity affects both corrosion
3
and scaling tendencies.
Calcium Hardness (Ca): Calcium is one of the principle elements making up the earth’s crust.
Calcium normally gets into water when rain water causes calcium carbonate to leach from limestone
deposits in the soil. It is the major contribution to water hardness. Calcium aids in the formation of
soap curds during cleaning and in some instances can form hard scale.
96
Magnesium hardness (Mg): Mg, like Ca, is leached from the soil by rainwater. It contributes to the
total hardness but is generally present at much lower levels than Ca. Magnesium hardness is a
calculated number based on measured total hardness and calcium hardness:
Magnesium hardness = Total hardness - Calcium hardness
Total hardness: This is the sum of Ca and Mg hardness. Fe (Iron), Mn (Manganese), Al (Aluminum)
and other metals also contribute to the total hardness but these substances are usually present in such
small quantities that they can be ignored. Hard waters are generally considered to be those waters that
require considerable amounts of soap to produce a foam or lather, and that also produce scale in hot
water pipes, heaters, boilers, and other units in which temperature of water is increased materially.
The hardness of water varies considerably from place to place. In general, surface waters are softer than
ground waters. The hardness of water reflects the nature of the geological formations with which it has
been in contact. The following illustration shows the general character of the water supplies in the
United States. The softest waters are found in the New England, South Atlantic, and Pacific Northwest
states. Iowa, Illinois, Indiana, Arizona, New Mexico, and the Great Plains states have the hardest
waters.
97
Waters are commonly classified in terms of the degree of hardness. There are different standards, as
3
etc.
Some action on basic compounds
–
CaCO
3
+ H2CO
3
Ca(HCO
3)2
, etc.
listed in the following Table:
Table: Water hardness Classification
Developed by Water Quality Association
Termppm as CaCO
Soft< 17.1
Slightly hard17.1 – 60
Moderately hard60 – 120
Hard120 –180
Very hard> 180
The hardness of water is derived largely from contact with the soil and rock formations. Rain water as
it falls upon the earth is incapable of dissolving the tremendous amounts of solids found in many
natural waters. The ability to dissolve is gained in the soil where carbon dioxide is released by bacterial
action. The soil water becomes highly charged with CO2, which, of course, exists in equilibrium with
carbonic acid. Under the low pH conditions that develop, basic materials, particularly limestone
formations, are dissolved. The Figure below shows where this originates and how it attacks carbonate
minerals. Since limestone is not pure carbonate but includes impurities such as sulfates, chlorides, and
silicates, these materials become exposed to the solvent action of water as the carbonates are dissolved,
and they pass into solution too.
In general, hard waters originate in areas where the topsoil is thick and limestone formations are
present. Soft waters originate in areas where the topsoil is thin and limestone formation is sparse or
absent.
Rain
TOPSOIL
Zone of intense bacterial action CO2in large amounts
SUBSOIL
Zone of less bacterial action CO2in small amounts
Continued action on basic compounds – CaCO3+ H2CO3 Ca(HCO3)2,
LIMESTONE
Zone of intense chemical reaction
CaCO3+ H2CO3 Ca(HCO3)2,
MgCO3+ H2CO3 Mg(HCO3)
2
98
Chloride (Cl-): Like Sodium (Na), most chloride salts are very soluble in water. They can cause
corrosion at high levels. Chloride is used to calculated cycles of concentration because it is stable in
cooling water systems.
Total Dissolved Solid (TDS): TDS is the total concentration of dissolved components, such as salts
and sugar. Salts, like NaCl, dissociate into ions; while some organic matters, like sugar, do not break
up into ions when dissolved in water. There are different approaches to determine TDS, but it is
commonly estimated from conductivity.
Conductivity: Conductivity is defined as the ability of an aqueous solution to carry an electric current
and can be easily measured by a conductivity meter. It is used to estimate Total Dissolved Solids
(TDS).
Cooling water problems
Scale - Minerals such as calcium and magnesium are relatively insoluble in water and can form scale
deposits when exposed to conditions commonly found in cooling water systems. A layer of scale as
thin as 1/64 inch can reduce heat exchanger efficiency by 15%. Scale formation can be controlled by
scale inhibitors such as threshold inhibition chemicals and scale conditioners. Chemical treatments
include acids, polymers and polyphosphates which prevent scale formation by keeping the scaleforming minerals in solution to prevent deposits from forming.
Corrosion - Most metals used in cooling water systems are very susceptible to corrosion. Keeping
surfaces clean is the most important aspect of preventing corrosion, since under-deposit corrosion can
take place and result in serious damage. Corrosion can be uniformly distributed throughout the system
or it can be localized, causing severe pitting and rapid equipment failure. There are various corrosion
inhibitors used in chemical treatment.
Microbiological deposits - More cooling water treatment programs fail due to lack of microbiological
control than any of the other two problems mentioned above. Scale, corrosion, and fouling often are
symptoms of an unsuccessful program, but the root cause is inadequate microbiological control.
Makeup water and wind can carry microorganisms into a cooling water system. Uncontrolled
microbiological fouling can lead to problems at every point in the cooling water system. Corrosion
occurs under the bacterial slime layer. Inorganic foulants are trapped in this slime layer, compounding
the problem. Microbiological chemicals often used include chlorine, chlorine alternatives, and
appropriate biocides
Rarely do corrosion, scale and fouling occur independently of one another. Usually two or all three
develop together to cause loss of heat transfer and premature metal loss. For example, microbial
fouling can cause scaling and corrosion to occur; corrosion can contribute to iron fouling and
encourage more corrosion to occur. To break this cycle, proper problem identification is important for
selecting and applying a practical, economical solution to any deposit problem.
99
Indicators for concern
1. Cycles of concentration are too high or too low: For each installation, there is a recommended
cycles of concentration. This is achieved by properly setting the blow down conductivity point.
If cycles are too high, water quality deteriorates and may exceed the treatment capability,
causing performance problems. If cycles are too low, there will be too much blow down, thus
reduced water saving. Also, cooling water may not get enough CHC treatment at low cycles.
Examples of causes for changes in cycles of concentration: a). Conductivity meter is out of
calibration and not working properly. The Conductivity meter should be cleaned and calibrated
for each visit. b). Changes in evaporation rate due to system load or weather. c). Changes in
makeup water chemistry.
2. Changes in makeup water chemistry: This is usually caused by changes in the source of makeup
water. Well water (ground water) is generally quite stable for each well but could change
significantly from other wells nearby. Surface water changes with seasons. Some cities use a
combination of different water sources for municipal water.
3. Changes in hardness and alkalinity in makeup water will changes the scaling tendency. Changes
in chloride also changes water’s corrosivity. Changes in conductivity (TDS) directly affect
cycles of concentration. Therefore, conductivity set-point may need to be adjusted.
4. Relative calcium concentrations of sump water and makeup: When makeup water chemistry
and cycles of concentration are stable, changes in sump water calcium hardness may indicate
changes in the performance of the CHC system.
5. Significant increase in bacteria population: Often this is caused by contamination. Follow-up
sample is recommended. Survey the system and find out the cause.
6.9INSTALLATION CERTIFICATE
Chamber
Located
In the City
County
State
Electrical Contractor (if
Customer Signature
The undersigned hereby certifies that all items described below, leased/rented to the undersigned pursuant to the lease/rental agreement
between the Lessor/Seller and the undersigned (the “Equipment”), have been delivered, and that this Equipment has been accepted by
the undersigned and is now operational.
DESCRIPTION
Unit Serial #:
Equipment
of
Serial #:
at
of
Company Name
INSTALLATION INFORMATION
Subcontractor Information
Plumbing/Installation
Contractor:
Telephone #:Date:
applicable):
Telephone #:Date:
Operational Information
Date System
Operational:
of
EcoWater CHC Tech/Rep Signature)
100
Loading...
+ hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.