Econ 290A, 290, 290AA, 3290 Installation & Operation Manual

Installation & Operation Manual
Proven Quality since 1892
ECON gate valves Fig. 290, 290A, 290AA, 3290 www.eriks.com Rev. 1
Content
2. Product description
3. Requirements for maintenance staff
4. Transport and storage
5. Function
6. Application
7. Installation
8. Maintenance
9. Service and repair
10. Troubleshooting
11. Removal
1. ERIKS operating companies
ECON gate valves are being delivered by several ERIKS operating companies on a worldwide basis. In this manual these will be referred to as ‘ERIKS’, the individual terms of delivery of the ERIKS operating company having executed the order are applicable.
2. Product description
The ECON gate valves are designed according the information in our latest catalogue or see our website www.eriks.com and should be used in accordance with the applicable pressure­temperature rating as stated on this website. Econ gate valves are provided with casted markings according to EN 19. The marking makes the identification of the valve easier and contains:
- size (inch)
- pressure rating class
- body and bonnet material marking
- CE marking when applicable
- ECON logo
3. Requirements for maintenance staff
The staff assigned to assembly, operating and maintenance tasks should be qualified to carry out such jobs and in any circumstance, ensure personal safety.
4. Transport and storage
Transport and storage should always be carried out with the wedge complete closed and the valves should be protected against external forces. The valves should be stored in an unpolluted space and should also be protected against all atmospheric circumstances. There should be taken care of the temperature and humidity in the room, in order to prevent condensate formation.
5. Function
ECON gate valves are designed to stop the flow of a medium. The valve is closed by turning the hand wheel clockwise; don’t use tools to increase the torque on the hand wheel. The valves can only be used with the wedge fully open or closed; please don’t use a gate valve for regulating the medium.
6. Application
ECON gate valves are widely used for water, oil, air and gas for shut off or connection of pipeline. The valves are designed for standard operating conditions. For the use of extreme conditions e.g. aggressive or abrasive media, it is recommended to mention this at the ordering stage, to verify whether the valve is suitable. The installation designer is responsible for the gate valve selection, suitable for the working conditions. The valves are unsuitable, without written permission of an ERIKS company, to apply for hazardous media as referred into Regulation (EC) No 1272/2008.
Installation & Operation Manual
Proven Quality since 1892
ECON gate valves Fig. 290, 290A, 290AA, 3290 www.eriks.com Rev. 1
7. Installation
During the assembly of the ECON gate valves, the following rules should be observed:
- the valves should be checked before installation if the have not any defects caused by transport and/or storage.
- make sure that the applied valves are suitable for working conditions, medium used in the plant and the right system connections, according to pressure and temperature limits.
- protective hole plugs must be removed.
- the standard installation position for the gate valves is with the stem vertical and in upright position.
- the interior of the valve and pipeline must be free from foreign particles.
- the valves with threaded ends should be assembled in the pipeline in closed position, make sure the wire ends of the pipe and the valve according to the same standard, and also free from pollution. Clamp the valve only on the hex clamping surfaces at the connection ports during assembly.
- when necessary, use a thread sealant, PTFE tape for low temperature applications and Grafoil for high temperature applications.
- steam line systems should be designed to prevent water accumulation.
- install pipelines so that damaging transverse, excessive vibrations, bending and tensional forces are avoided.
- for easy operating the clear distance around the hand wheel shall not be less than 100MM.
- before plant startup, especially after repairs carried out, flash out the pipeline.
8. Maintenance
Before starting any service jobs, make sure that the medium supply to the pipeline is cut off, pressure was decreased to ambient pressure, the pipeline is completely cleaned and ventilated and the plant is cooled down. Always keep safety instructions in mind and take all personal safety precautions.
During maintenance, the following rules should be observed:
- always keep personal safety precautions in mind and always use appropriate protection e.g. clothing, masks, gloves etc.
- be alert that the temperature still can be very high or low and can cause burns.
- check the valve on all possible leaking possibilities.
- check if all nuts, are still fastened.
- dust, grease and medium residual, must be frequently cleaned of the valve body and all moving parts, such as stem to maintain all operating functions.
- if there is a leakage across the stem, gradually tighten the stuffing box sealing, evenly in increments by means of the hex. nut, until leaking stops.
- if required repack the stuffing box gasket, for safety reasons we recommend that the valves only can be repacked when depressurized, drained and ventilated.
- when cutting the new stuffing box packing from the roll, make sure that the ends are cut with a slant.
- check if the wedge still open and close in a proper manner.
- the thickness of the body must be checked to ensure safety operation at an interval of at least three months.