General Arrangement _____________________________________________________
Warranty & Contact Information ____________________________________________ 7
4
5-6
05-19-2011
2
Installation guide SR30V & SR60V
Page 3
Innovation and Leading Technology
SECTION 1
TOOLS REQUIRED
Phillips Screw Driver for all Screws on The Unit Flat Screw Driver or Snips for Removal of Staples Robertson Square Screw
Driver for Pallet Screws Teon
Tape Adjustable Wrench.
PARTS REQUIRED
Hose and Fittings for connection to Regulator
•
Disconnect per classication area (See General
•
Arrangement Drawings)
- 220 Volt 1 Phase Power
- 5 - 6 Ft from units at least
- 18” above the ground
Compressed Air Line next to unit
•
UNPACKAGING THE UNIT
Step 1 : Carefully inspect the shipping carton for any signs of
transport damage.
Step 2 : Begin by removing the staples attaching the box to
the skid (A Flat Screw Driver or Snips will do the job).
Step 3 : Carefully remove your solvent recycler from the
shipping carton. Remove the four screws from the bottom of
the solvent recycler screwed to the palette.
Step 4 : Remove the unit from the palette and place it in the
general area for installation.
05-19-2011
You are ready to begin with the installation of the solvent
recycler.
3
Installation guide SR30V & SR60V
Page 4
Innovation and Leading Technology
1
SECTION 2
ELECTRICAL CONNECTION
Step 5 : Now we are ready to have the electrician wire the solvent recycler
for model SR30 connect to 220 volts / 1 phase power to the electrical
junction box 1 that is provided in the back of the unit. The 7.5 gallons
recycler requires 15 Amp service.
For model SR60 connect to 220 volts / 1 phase power to the electrical
junction box that is provided in the back of the unit. The 15 gallons
recycler requires 30 Amp service.
Then connect a ground wire 2 to the back of the unit ans use the
2
ground wire with a clip to ground the 55 gallons drum.
For units that come with the optional used solvent ll pump you will
need to connect with an ½ air line to the pump and suggest to put a lter
regulator before the air inlet of the pump and then adjust the air pressure
on the regulator to 80 PSI.
Note : Please Review the “General Arrangement” Drawing
MAKE SURE ALL CODE REQUIREMENTS ARE FOLLOWED
1
.
.
VACUUM INSTALLATION
2
5
3
4
1. Install the ¼ push in fitting
1
2. Install the air regulator
2
3. Install the clear tube coming from the recycler.
3
4. Install the vacuum generator assembly on the
4
tank and then connect the cleat tube coming from
the bottom of the tank.
5. Install the blue tube on the 2 push in fittings.