E.C.A. CA 24 BB, CA 24 HB, CA 24 BM, CA 24 HM, CA 28 HM Installation And User's Operating Instructions

E.
24
kW
24kW
kW
24 24
kW
28
kW
C.
Flued Gas Combination Boiler (monothermic type) Room Sealed Fan Assisted Gas Combination Boiler (bithermic type) Room Sealed Fan Assisted Gas Combination Boiler (monothermic type) Room Sealed Fan Assisted Gas Combination Boiler (monothermic type)
A:
Flued Gas Combination Boiler (bithermic type)
cal
//""""
ora
INSTALLATION
OPERATING
AND
INSTRUCTIONS
USER•s
L
E.CA
~~
(~
-
CONTENTS
-
PREFACE
-
GUARANTEE & SERVICE
-
SYMBOLS'
-
SAFETY
-
PRODUCT
General Specifications
Product Notation
Technical Data
-
BOILER
-
INSTALLATION
DEFINITIONS
INSTRUCTIONS
PACKAGING
AND
WARNINGS
Selection Of
Mounting CONNECTIONS
-
Flue
Connection
Gas Supply
Electricity Supply
-
BOILER
Final
Checks And Operations Before Boiler Start-up
Control Panel
Operating
Timer
-
GAS
TYPE
Gas
Replacement Of
Jumper Adjusment
-
Pressure
FAULT & FAILURE
The
Boiler Location
The
Boiler
& Water
START-UP
The
Boiler
CONVERSION
Adjustments
The
FINDING
Systems
Burner
Injectors
-
MAINTENANCE
-
STANDARDS
-
2
APPENDIX
AND
REGULATIONS
-
INTRODUCTION
-
PREFACE
Colora gas combination boilers have central heating
natural gas or This
about gas supply, flue connection fault & failure finding are operating the boiler a long time period
Please keep all your documents safe.
24
kW
open
flued gas combination boilers
(CH)
and
LPG.
manual contains installation
technical data, selection
been
domestic hot water
and
placed
and
designed for providing efficient, safe
(DHW).
and
user's
operating instructions.
of
the boiler location, fitting the connections (water
electricity supply), gas type conversion, maintenance
in your manual. Please read the instructions carefully for
and
to maximize benefit from the boiler specifications.
24/28
The
kW
room sealed fan assisted
boilers are supplied for use with either
The
detailed
- GUARANTEE & SERVICE
).
The
appliance
that the instructions and
general maintenance must
The
). ).
warranty certificate
Your
appliance
or additional information, consult qualified person, installer or gas supplier.
- SYMBOLS'
The
symbols have
noticeable.
has guarantee period against faulty workmanship or material
and
precautions in
must
need
not any repairs if
be
this
manual must
be
carried out only
registered
operated
be
obeyed.
by
qualified person.
by
Service in the installation day.
according
to
this
DEFINITIONS
been
The
symbols' definitions are described as follows:
placed
on
particular points to make some instructions more
The
manual.
and
comfortable
information
systems
and
in
condition
service operations
For
assistance
,
~
Information
-
CAUTION:
Property damage and/or non-severe injury can
happen.
or
- WARNING: Severe injury
death can happen.
: The important explanations to
: The situations that can only
be
person.
be
considered
interfered
by
by
qualified
users.
3
-
SAFETY
INSTRUCTIONS
AND
PRECAUTIONS
Safety Instructions
-
-Shut off the oven, cooker
-Do
- Allow
a gas
leak
is
When
Turn
off tfle gas valve
found
of
not light match, lighter etc.
fresh
air into the room
or
suspected:
the boirer
and
and
similar appliances
and
by
opening doors
other appliances which operate with gas.
put cigarette out.
- Do not touch the electrical appliances' switches Turn
off gas supply
-
- Do not
use
telephones
at
the gas meter.
in
the environment where a gas leak
- Call your qualified person as soon as possible.
~
Do not
place
and
~
Keep soap
use flammable
and
water solution
and
away
explosive liquid or materials around the boiler.
from electrical connections during cleaning, gas
test etc.
~
Do not
block
air vents, openings
made
in
the walls of the room, which provide
the installation room.
~
Do not lay the
~
Open flued gas combination boilers are
safety
device of operation. parts
may
Water Systems &
~
Before installation
be
must
Gas
~
demanding
~
only
completed
Type
The
appliance
Gas type conversion from
by
qualified person. After gas type conversion, gas leak
LPG
container down.
(TTB
be
In
case
used.
sensor).
Combustion products discharge safety
of
the replacement
Gas
Supply Une
of
the boiler, the water
in
accordance
Conversion
should
gas type conversion,
be
purchased
equipped
of
the defective safety devices, only the original
systems
with the relevant regulations
depending
this
is
made
with charge.
LPG
to natural gas or from natural gas
person.
~
Maximum pressure regulator must
placed
on
the boiler after gas type conversion.
be
sealed
and
• Installation
~
The
boiler must
regulations, relevant standarts
~The
appliance
~
The
appliance
~
The
appliance
~
Any
change
~
The
flue ducts must
Boiler
Start-up
~
Boiler start-up must
~
Gas type (natural presure (bar) plate must
~
After boiler start-up, you should request information precautions from qualified person.
Operating
~
Read carefully instructions
unsafe conditions.
~The
boiler should
and
service operations must
~
Only a
damp
surfaces should
rust
and
scratches
be
installed
should must should not
of
flue position must not
be
be
gaS/LPG),
and
electricity supply voltage M
be
suitable with mains supply conditions.
The
Boiler
be
checked
cloth should be
dried completely. Do not
in
your
in
accordance
and
this
be
mounted against a closed wall.
be
positioned
be
positioned having a direct
fitted to a
manual
so
that the plug
be
made
approved
performed certainly
gas supply pressure (mbar), maximum
And
Maintenance
and
precautions
and
serviced for general maintenance once a year. Maintenance
be
carried out only
be
used for cleaning the outer surface of the boiler
appliance.
with national
by
chimney for
by
data
in
this
use
to
put their flame out.
and
windows.
and
plugs.
is
suspected.
leak
fresh
air to
with combustion products discharge
device
(CH
and
DHW
circuit)
and
on operating gas type.
test
must
the self-adhesive conversion label must
and
local requirements, gas safety
standarts
to
LPG
be
performed
shall not
and
gas supply line
by
In
case
must
be
by
be
put out
user.
of
a
carry out
qualified
be
qualified installer.
is
accessible.
contact
to
steam or gases.
without consulting qualified person.
open
flue boilers.
qualified person.
DHW
operating water
which are detailed on the information
This
is
checked
about
operating the boiler
by
qualified person.
and
safety
manuel against wrong usage which causes
by
qualified person.
and
then the
chemical subtances or solutions which cause
4
- PRODUCT
General Specifications
Colora 24 gas combination boilers are for providing central heating are supplied for
kW
open
flued gas combination boilers
use
with either natural gas or
and
LPG.
24 I 28
kW
and
room sealed fan assisted
domestic hot water.
The
boilers
Boiler has a elegant
Control panel has
space
saving design which provides easy servicing
appearance
with
compact
been
designed ergonomically.
dimensions (750x454x340 mm)
control potentiometers, thermomanometer
and
boiler functions
fault/error conditions
cover. Microcontroller
controller drives gas valve, fan, cased
by
regularly. Flame modulation
Burner,
is efficient chamber has ideal dimensions for burner to
provide
burner
and
Pump has an automatic air vent so
that
pump prevent from thermal accumulation
Heat exchanger high productivity
board
(main board) provides all the functionality
a plastic casing, which
A CAUTION: Do
~
made
and
clean
while observing the flame modulation to avoid burning injury.
of
stainless steel, withstands thermal
combustion as a result of the homogeneous dispersion
pump
and
is
mounted on the gas valve. Flame
can
be
seen through the observation glass on the front panel.
not
and
loss
of
low heat, high efficiency
combustion
chamber
and
provide
3 operation mode.
continues to run for a certain time after ending
in
water circuit.
is
made
of
and
is
copper
non-calcerous
and
designed for thermal shock absorbing.
as
and
maintenance.
Whilst
and
timer (optional) are under
can
be
push-buttons,
seen via
LEDs
signal without opening the
and
(in
monothermic types) 3-way valve.
directly contact
stress.
the
observation glass
Burner
performs silently
perfect insulation of heat
and
low emission
energy
The
saving
boiler
of
gas.
and
has
'pump over-run' behaviour
of
CH
or
well.
and
round edges.
CH & DHW
safety
temperature
its
plastic cover,
of
the boiler.
The
It
in
the burner
and
of
gas. Combustion
and
has been designed
These
specifications
minimum
DHW
noise level.
heat
demand
It
has long life,
has also
board
is
checked
provides
The
is
of
to
Plate
heat
exchanger
The
safety systems
safety
systems
~
Flue Gas Safety
~
Flame Failure Safety
~Over-heat
~
DHW
(Domestic Hot Water) Over-heat Safety
~
CH
(Central Heating) Over-heat Safety
~
High Water
~
Low
Water
~
Low
Voltage Protection
~
Thermal Accumalation Protection
~
Frost
Protection
are:
System
Safety
Pressure
Pressure
System
in
System
makes
your
appliance
System
(1
05°C)
Protection
Protection
System
(The
protection system)
~
Pump Anti-sieze Function
~
3 Way Anti-sieze Function
~
Automatic
~
Expansion
Air
Vent
Vessel
(in
hot
water
provide entire safety for you
System
System
System
System
(185
appliance
(3
(0,8 bar)
VAC)
System
must
bar)
(with by-pass circuit
be
monothermic types)
more
(95°C)
on
stand-by
efficient
(75°C)
in
monothermic
and
and
"pump over-run")
mode
to
activate frost
your
types.
appliance.
The
5
Product Notation
Table 1
Notation
CA24
BB
CA24
BM
CA24
HB CA24HM CA28HM
Description
Colora
Colora
Colora 24 Colora 24 Colora 28
Technical Data
Colora 24 boilers have room and
kW
open
flued gas combination boiler (CA 24
an
open
combustion chamber. Combustion air
and
products of combustion
a chimney. Therefore, they are
24
kW
24kW
IN/ IN/ IN/
Open
Flued Gas
Open
Flued
Room
Sealed Room Sealed Room Sealed
is
discharged
named
Combination
Gas
Combination
Fan
Assisted
Fan
Assisted
Fan
Assisted
by
means of approved flue ducts connections
as room air
Boiler (bithermic type)
Boiler
(monothermic
Gas Combination
Gas Combination Gas Combination
BB)
is
a B type boiler
is
provided from the installation
dependent
Boiler
(bilhermic type)
Boiler
(monothermic type)
Boiler
(monothermic type)
(EN
gas appliances.
type)
297). B type
Colora Required
concentric air/flue ducts
CA 28
24/28
HM)
is
a C type boiler
fresh
kW
room sealed fan assisted gas combination boilers (CA 24
(EN
air for combustion
and
products
air/flue ducts. Therefore, they are
Table2
Gas
Boiler Type
Category
Type
of
*
gas
Alri»naJCES
Pmin, Min. Pmal<s, P%80, Qmin, Qmal<s, Q%80,
Heat
Max.
Heat
Min.
Thermal
Max.
Thermal
Output
Heat
Output
Thermal
Load
Output
Load
Load
GasConsurplion
Natural
Gas
(Max.
Natural
Gas
LPG
Gas~~
Natural
Gas
LPG
(Min.
Load)
Load)
lJotrleB:Hot.IM*r
Min.
Flow
Rate
For
Max.
Flow
Min.
Operating
Max.
Operating
Set
Temperature
Activating
Rate
Pressure
Pressure
Range
CenlrallletiDJg
Min.
Operating
Max.
Operating
Set
Temperature
Pressure
Pressure
Range
General
Electrical Electrical Expansion Dimensions Weight
For
Supply Power
Consumption
Vessel
(HxWxL)
(Net)
gas consumption
calculation;
6
HB,
CA 24
HM,
483). C type boilers have a sealed combustion chamber. is
provided independently from the installation room
of
named
as
air independent gas appliances.
C4.24BB C4.24BM
112H31W
Bn
BS
GaznakJel
Plcpcre Plcpcre Plcpcre
8,4
24
19,2 19,2
9,3 9,2 9,2 2M 21,3
2,77 2,73 0,97 0,96 0,96 2,08 2,08
2005
28137
3 3 3
1~t=34)
0,3 0,3 0,3
10 10 10
35(:£)
0,8
3 3 3
4()..8() 4()..8() 4()..8()
23CW
PC
-50
Hz
105 150 150
8 8 8
7S0rA54lc340 7S0rA54lc340 7S0rA54lc340
33,7 39,8
Natural gas: Hu=9,59
LPG:
combustion
can
be
also discharged
C4.24HB
1121131¥'
c12x.
c32x c12x.
Gazrduel
8,4 8,4
24
26,2
21 21
C4.24HM
112H31W
GaznakJel
24
19,2 26,2
2,73 2,08
20'25 20'25
28137 28137
1Q:At=34) 1Q:At=34)
35(:£)
0,8 0,8
23CW
PC-
50
Hz
23CW
35(:£)
PC
40,8
kWh/m
Hu=l2,793
kWh/kg
c32x
-50
3
Hz
23CW
7S0rA54lc340
by
C4.28HM
112H31W
c12x.
C32x
Gazrduel
Plcpcre
9,8 kW
28
22,4 kW
10,7
30,6 24,5 kW
3,19
1,12
2,39
20'25
28137
3
12(At=33)
0,3
10
35(:£)
0,8
3
4()..8()
PC
-50
150
8
41,3
by
the same
Unit
kW
kW kW
m3Jh m3/h
l<glh
mbar mbar
11/mln It/min
bar bar
"C
bar bar
"C
Hz
VAC/HZ
waH
It
mm
kg
5 6 7
CA24
230VAC
"
BB
.-----G
20
''I
MAIN BOARD SUPPLY CABLE
3 PUMP 12 DHW
IONIZATION ELECTRODE
5
IGNITION ELECTRODE (EARTH}
6 7 IGNITION ELECTRODE 15 8 ON/OFF SWITCH
9
FUSE2A
10 TERMINAL WITH FUSE
11
TTB
13 CH 14 SHORT CIRCUIT
WATER WATER
16 17 LIMIT THERMOSTAT 43 LED L8 20GASVALVE
3
31
32
~-~~-~
11
I I
TEMP. SENSOR
SENSOR 32 TIMER (OPTIONAL) 46 PB3 SERVICE BUTTON
SENSOR 33 TERMINAL
FLOW SENSOR PRESSURE SWITCH 42 LED
15
!._
17
31
ROOM
THERMOSTAT (OPTIONAL)
(4
34 TIMER SUPPLY (OPTIONAL}
41
LED L3 49 DHWTEMP. CONTROL POTENTIOMETER
44
LED L7
POLES) 47 PB4 CHIMNEY .SWEEP BUTTON
L4
33
49
G~
0
45 RESET BUTTON
CH
48
44 43 42
0 0 0 0
47 46
121
41
::Dl
121
48
G
TEMP. CONTROL POTENTIOMETER
Ill
,...
~
5 6 7
20
MAIN
BOARD SUPPLY CABLE
FAN
2 3
PUMP
5 IONIZATION ELECTRODE
IGNITION ELECTRODE (EARTH)
6 7
IGNITION ELECTRODE ON/OFF SWITCH
8 9 FUSE2A
Vl
I 1 23DVAC !Ill
CA24
HB
2
8
l~~~
31
~-lr_-5
11
L
-17
15
20
GAS VALVE
31
ROOM
32
TIMER (OPTIONAL)
33
TERMINAL
41
LED L3
42
LED L4
43
LED L6
THERMOSTAT (OPTIONAL)
(4
POLES)
''I
I I
10
TERMINAL
11
10k RESISTOR
12
DHW SENSOR
13
CH 14 DIFFERENTIAL AIR PRES. SWITCH 34 TIMER SUPPLY (OPTIONAL) 15 WATER FLOW SENSOR 16 WATER 17
LIMIT THERMOSTAT
WITH
SENSOR
PRESSURE SWITCH
FUSE
~--G
~
10
33
0
9
32
44
43 42
0 0 0 0
47 46
121 121
49
G
44
LED L7
45
RESET BUTTON
46
PB3 SERVICE BUTTON
47
PB4 CHIMNEY-SWEEP BUTTON
48
CH
TEMP. CONTROL POTENTIOMETER
49
DHW TEMP. CONTROL POTENTIOMETER
41
4500
121
I
48
G
Oo
~
~
CD
CA 24 BM
- BOILER PACKAGING
-The
product
(HxWxl)
mm
is
and
a)
covered
with a
supported
CAUTION: The instructions
on
the
considered during transportation
cardboard
by
upper
box
of
which dimensions
and
lower styrofoams (fig. 2a).
b)
boiler package and
storage.
are
867x522x422
should
be
-
The
required parts (Wall bracket, 5 screews) for installation which seen in
a) Mounting b)
CH
connecting
c)
DHW d) Gas supply e) Nipples (1/2", 2 h) 4 pieces
the
bracket
connecting
pipe
W gasket, 6
fig.2b
pipes (3/4", 2 pieces)
pipes (1/2", 2 pieces)
(3/4", 1
pieces-
10
of
the
boiler
is
put
are
optional.
piece)
3/4", 3 pieces) which
pieces
The
%" gasket for water
fig.2
pieces
into the optional
gasket for
upper
parts are:
are
held
and
gas
water
and
gas
styrofoam (fig. 2b).
with spring clips.
connections.
connections
The
other parts
and
11
- INSTALLATION
Selection
The
boiler must
Of
be
The
Boiler
installed
Location
in
accordance
with gas safety regulations
Additionally, the clearances around the boiler should
and
service, maintenance
Fig.
4 indicates minumum clearances from the ceiling
usage easier.
E
E
0
Ill
I'
be
as
shown in fig. 4
and
the sides.
and
relevant standards.
in
order
to
make
fig.4
WARNING:
The appliance must
be
positioned so
that
accessible.
-
The
appliance should
-
The
outer surface
be
of
the boiler
mounted against a closed wall.
do
not
exceed 85°C in maximum running mode so
take additional precautions againts constructional materials (combustible materials).
12
the
plug is
do
not
WARNING:
For connections regulations
open flue boilers, the boiler location
must
obey
and
relevant standarts.
national
and
local
and
flue gas discharge
requirements,
gas safety
+Open
in
a room containing a bath or shower inflammable or explosive liquid or materials. high level
+ General requirements for the installation room
-The installation room must have 1 m installation room must have 24 m3 volume for boilers of 24 permanent air vent connected to external air with cross-section area
-
If of cross-section areas adjacent installation room be
flue appliances must not
of
dust or humidity.
volume of the room 24
kW
heat output, 2 additional permanent air vents connected to room must not
on the same wall (fig.
and
is
less
of
150
cm2 are required, one
be
the
adjacent
Sb).
WARNING: Do
be
installed
and
3
volume for
than 1 m
a bathroom, bedsitting room or bedroom.
3
/k.W
room
not
in
a bedroom, bedsitting room, bathroom or
also the installation room must not contain
The
boiler should not
of
open flue boilers:
each 1 kW
that means the volume
at
high level
must
be
24
m3 as
block
the air vents which provide fresh air to
be
heat output. Therefore,
kW
heat output (fig.
is
and
well.
The
the installation room.
installed
of
less
adjacent
one
The
additional air vents should
in
rooms with
The
Sa).
Also,
a
150
cm2 is
required.
than 24 m3 for boilers
room with
at
low level.
total volume of the
The
a) Volume b)
Total (installation room (adjacent room
Volume
volume
of
installation room ~ 1 m
of
of
room
rooms 1
is
represented
is
represented
3
represented
and
2
~1
m3/kW
by
1)
by
2)
/k.W
by
1::;
1 m3/kW
fig.S
13
Flue gas discharge connections:
-
The
boiler should total horizontal length gas
company
-The minimum distance between elbow
The
flue
­way that the cross-section area of the chimney must not
duct
be
located on the wall
of
the flue ducts must not
regulations.
should
be
fitted
at
a slight %
WRONG RIGHT
as
near
as
possible to the existing chimney
exceed
and
top
of
the boiler should
upwards incline to the chimney inlet
and
the maximum length approved
be
39 mm.
in
such a
be
narrowed (fig. 6).
the
by
fig.6
-The materail approved materials
-The flue ducts must not containing inflammable or explosive materials or liquids.
-
The
flue ducts must not
A
of
the flue
WARNING: Open Rued gas combination boilers are
products
combustion products discharge safety device.
duct
can
be
and
the diameter
be
taken through bedroom, bedsitting room, bathroom or a room
be
closer than 20 em to combustible materials.
discharge safety device
made
of stainless steel sheet, enamelled steel sheet or
of
the flue
duct
(IT8
must
sensor).
ELBOW
EXTENSION Lmin=39mm
be
suitable to the hood outlet.
equipped
Do
not
90°
with
interfere
combustion
with
the
~The
flue ducts
The
minumum effectual chimney length
-
-The chimney must
must
be
fitted to a approved chimney.
be
checked
14
and
is 4 m.
swept.
WARNING: air/flue terminal position
A
~
The
room sealed fan assisted boiler
in
the building.
In
case of gas leakage, it
­local requirements, although the room sealed fan assisted boilers are independent volume
and
regulations
ventilation.
For
room
sealed
fan assisted appliance,
must
obey
national
and
relevant standarts.
is
not suitable for external installation.
is
necessary to vent the installation room according to national
the
boiler location
and
local requirements, gas safety
It
should
of
be
and
within
and
room
A WARNING: Do
~
~
The
air/flue terminal must
it
at
all times.
-
The
minumum
openings must
-
The
air/flue ducts should
water or condensation from entering the boiler.
Mounting The Boiler
Having determined the boiler location,
Use
the
­brackets.
Drill
­bracket with the 2 screws.
-Hang
paper
the wall
the boiler
the
installation room.
acceptable
obey
national
be
template to mark out the positions
and
fix
the wall bracket to the wall with the 3 screws, then also the mounting
up
on the wall bracket.
E E
~
not
block
the
be
exposed to the external air
dimensions from the terminal to obstructions
and
local requirements.
fitted
at
a slight % 1 0 or 20 downwards incline to prevent
air vents which provide fresh air to
and
allow free passage of air cross
and
ventilation
of
the fixing holes of wall
and
mounting
any
fig.7
15
- CONNECTIONS
Flue
boilers:
a)
The air/8ue system is
b)
The
c) The air/flue
[!]
-
90°
Air/flue kit parts ill mounted
-Stick
- Fix
- Fix
-Fix
- Screw the 90
Conaedioa
..
3 ditlhent
air/flue system is
ayatem
Collaectioa
Ccmceullic
the
:flat
the
sealillg
the
sealillg
the
s~
by
elbow can
sealing
riDg riDg riDg
elbow
types
of
desigDed
desiped
is
desigaed
hodzoatal
riDg
(
+60
(
+60
(+lOOmm)
to
the
air/flue system can
by
horizontal
by
two separate
by vertical
:
De
tlir/jlru
is
onq
yt~ll
dttlll4
coaceatlie
be
mowrted
aa
shown
(•96,3/128
mm)
to
illterior joilrt
mm)
to
illterior joilrt
to interior
boiler with 4
ldt, givf!ll willf
gir«"fe
ortlo
on
the
in
fig. 10.
mm)
joiDt
screws.
be
deaiglmd
concent:rit
ducts.
concentric
fur
lulrizlmtlllllir/jble
rq~~lre4
duds
boil.e:r
clw:ts.
ytiiR'
tuWDDria
in different positions (fig. 9).
on the elbow.
of
the
elbow-
of
the
elbow-
ofthe elbow-tube
fOr
23,3
ducts.
IYHRfl
fim
outlet.
tube (L=860
kW
6ellle4
daig&
fro•
(JIIIIIJfle4
(1..=860
mom sealed
fa
asrictetl
6mned
t1pJ1IWu:e,
For tile oilier (Wier,
8m1lce.
mm).
mm).
aasisted
:De
laclllfe
tlir/jllle
tiJ
prnMt
hclll
•luJul4 u
ay
wtltn
jitla
tit"
or
ctnuletiSfltltm
B1fPt
1
" 1
or
2'
tlowmwJrtls
fro•
eMerittg tile bolkr.
16
fig.
tO
Room
Sealed
Fan
Assisted Operation
+
If
the air/flue kit length is insufficient, additional flue accessories should be ordered through
Do
qualified service.
-Horizontal air/flue kit accessories (fig 11): a) Concentric extension, L=500 mm,
Concentric extension, b) 90° Concentric elbow, c)
45°
Concentric elbow,
not use any other type I brand name
4>60/1
L=lOOO
4>60/100
lj)60/100
a) b)
mm,
mm
mm
lj)60/100
00 mm
mm
----
@
fig.
11
of
flue parts.
c)
17
);>
The
total
90"
concentric
1m
(fig. 12). The
length
elbow
a)
Of
hOrizontal air/flue system must
or
two
pieces
of
45°
maximum
number
of
90"
not
concentric
elbow
to
Lmax=3m
exceed 3
elbow
be
used
m.
Furthermore,
decreases
is
3
the
maximum
each
extra
length
b)
C)
Lmax=Ll +L2
-tttl
~2m
L1
Lmax=Ll +L2+L3 ~ 2 m
I
~
18
~
Connection
by
two separate ducts
+ Maximum length
flue ducts must
-
The
twin air/flue
a)
The
twin air/flue kit
b) Extension,
Extension, c) 900 elbow, d) 450 elbow,
be
l=500
l=
080
080
b)
parallel (fig.
kit
and
mm,
1 000 mm,
mm mm
a)
of
the air ducts
15).
its
accessories (fig.
080
mm
080
mm
and
flue ducts are seen
14)
:
fig. 14
c)
in
Table
(J~
4.
The
air ducts
d)
and
20
&
lmax
'I
Gas Supply & Water Systems (Optional)
-Water
the optional pipes
&.
gas connections between the boiler
Nipple
(314'1
and
the nipples as shown
0
(J)
0
"""
a b c d e
' '
and
the mounting bracket
in
fig. 18.
~ ~
~
can
be
fixed with
a)
CH
flow 3/4"
b)
DHW
outlet 1/2"
c) Gas inlet 3/4"
DHW
d) e)
-A Suitable valve should a water filter should
-A plastic hose should connected
-
inlet 1 /2"
CH
return 3/4"
be
to the drain line.
The
connection between the
be
be
mounted on the gas inlet
mounted
on
CH
(3/4")
fixed the outlet
appliance
tap
and
and
return
and
DHW
of
the 3
bar
relief valve
gas supply must
CH -DHW
(1/2")
be
made
water circuits.
inlet.
and
the hose should
with a flexible pipe.
In
addition,
be
23
Electricity Supply
Electrical installation should
The
boiler
must
be
earthed
WARNING: Disconnect power supply to prevent electrical shock
before connecting the electricity supply.
be
made
according to the national
and
a standard 230 V
AC
- 50
Hz
and
supply
local instructions.
is
required.
A WARNING:
~
Room Thermostat Connection (Optional)
It
is
possible to
your
appliance
~Room
~
~+10°C
cord
use
one of the 2 different type of Honeywell room thermostats together with
optionally,
thermostat(T6360A1004}
__
Honeywell
a simple room thermostat
.... +30°C
If
the supply cord is damaged,
or
assembly available from the manufacturer
for
providing
__
,
it
must
be
replaced
or
its service agent
temperature
~
Programmable digital room
thermostat
~
7-day program
~
Up
~
Programmable
control
(CMlOO}
to 4 level changes per
frost
by
a special
of
the
day
protection
system.
The
brand name
0
Information
-
Room
thermostat connection
- Disconnect the bridge between pole number 3 number
- Connect the room thermostat connections to the same poles.
33.
otherwise
no
case,
is
seen
responsibility will
of
the room thermostat
it
may
cause failure in your appliance. In that
in
the wiring diagrams
and
be
pole number 4 of terminal
24
accepted
(fig.1
must
be
Honeywell,
a - 1 b - 1 c).
-
BOILER
Final Checks
~
Information
Filling the boiler
-
Firstly,
turn
on
all
Check
inlet
-
-Remove right side
-Open
-
Open
off
-Turn
- Keep
-
Turn
off
and
the front
panel manual filling tap2) slowly
the
air
up
filling until water pressure measures l ,5 - 2
the
filling
START-UP
And
Operations
and
central
the
radiator valves.
outlet
CH
panel,
combustion
respectively.
air vent vent
on
tap.
on
to
heat
Having completed the installation
supply,
the
authorized
the
final checks
supply
and
water circuits)
gas
company regulations
and
operations
gas
person.
heating
valves. The valves must
heat
exchangerl
fill the system.
exchanger
circuit with water.
be
open.
body
cover
(in
room sealed fan assisted boiler)
).
when water starts to squirt.
bar
on the thermomanometer.
and
connections (flue, electricity
of
the
boiler according to
and
relevant standards,
must
be
carried
out
by
qualified
and
A
~
-Turn on
-Check to increase water pressure
-Check entirely for efficient heating.
-
[]] [}]
and In addition,
the
air vents
the
CH
radiator vents whether
Check
any
leakage
Open
hot water
Check
whether flue kit
regulations.
to
water pressure on the thermomanometer
tap
> Electricity connections
(230 V
AC-
50
:..
Gas supply must
Call
qualified
Hz).
be
service to boiler start-up after all these processes
~
CAUTION: leak
and
set air free until water squirts. Repeat this process for all the radiators.
to
l ,5-2
bar
any
air
in the radiator
to
check
is
comprised
of
boiler must
checked
Bo;to,
and
DHW circuit.
by
the qualified gas
.
<lad~p
After boiler start-up, you should request information about
~Information
operating
person.
l)
The
HB).
2)
The
manual
filling
tap
air
vent
is
not
is
on
the
available
top
of
in some models
Do
not
forget to turn
off
the filling tap, water can
cause damage.
again,
and
turn
on
level.
in
the
water pipes or not. Air must
the
water
pipes finally.
Check
any
leakage
of
original parts
be
earthed
mu<l
bo
the
boiler
expansion vessel in bitermic types (CA 24
or
not
and
suitable with main supply conditions
company.
pcdonnod
and
safety precautions from qualified
based
on national
water
according
ore
completed.
CC<lainly by
and
the filling
be
purged
pipes.
to
the
qualified
local
tap
out
instructions
peNon.
BB
- CA 24
regulations.
25
Control Panel
The
control panel shown
ITJ
ON/OFF Switch
The
appliance
[]]
Display
By display
LED's
Panel; LED's:
the different diagnostic
panel
have 3 different signals.
-ON
-OFF Fast
blink:
-
The
normal functions automatically
Table 6
0.1
Stand-by
Anti-cycling time active (only
is
turned
but also
0 sec
in
L3,
fig. 20 consists
- -
--
ON/OFF
L4, L6,
in
using the
L7
LED
signals, not only the normal functions are shown on the
case
of
The
ON
- 0.40 sec appear
in
of
the following parts as detailed below.
(JJ-cjl-<)-!11[
·.+ ·:::::·::+:
-8-'t-~~
fig.
20
ON/OFF
--
.....
--
:
switch.
error, the error condition indications are displayed.
definitions:
OFF
on the display
CH
mode)
L3 L4
--(f)-cJf--~-mm-
• • • • • • • • • • • • • • • • • •
••••0••0•••••0••0••••
• • • • • • • • • • • • • • • • • •
---1'
panel
L3(f)
ON
Fast
Blink
"
as
shown
L4
c}f
OFF OFF OFF
OFF OFF OFF
L6 L7
{1-~-
in
Table
L6~
6.
L7illffi
CH
mode
DHWmode
- Anti-cycling time restricts going
ON
(CH
mode) or
and
also
is
adjusted between 0
active,
any
CH
heat demands
26
ON
ON
CH
demands for a certain time to prevent the boiler from frequently
OFF
(stand-by).
and
can
The
15 minutes
not
be
satisfied
factory defaults
by
qualified person. and
LED
OFF
OFF
of
anti-cycling time
If
Anti-cycling time
L3
blinks fast.
ON
ON
is
ON
Fast
Blink
3 minutes
is
[]]
CH
Temperature
The
C H pate ntiometer has 2 functions (fig.
a)
to
set
the
CH
Control
Potentiometer
water temperature.
Winter
mode
start point
(Potentiometer P1)
21
) :
Summer
CH
water
iJ
Information
main has
thermostat
should
b) to select summer/winter mode.
The
winter
mode
is
in
-
-
The
summer
[!]
DHW
The
DHW
60° c (fig. 22).
[[]
Reset (PB1), Service (PB3)
mode
Temperature
potentiometer has the function to set the
the range
can
be
Control
activated
and
mode
fig.
21
temperature
board
communication,
no
effect
anymore
and
be
the
maximum
of
40
to
80
by
turning the
Potentiometer
Chimney Sweep (PB4) Push-buttons
PB
l
set
point
room
on
also
°C.
the system
it
is active.
position.
CH
(Potentiometer P2)
DHW
water temperature between 35°C
fig.22
PB2 PB3
can also
thermostat Jhe
Additionally,
potentiometer
be
adjusted
if
the system has
to
PB4
via
CH
CH
external
potentiometer
the
potentiometer
room
the minimum position.
and
-Reset push-button
-Service push-button parameters.
-By
means mode by
qualified person.
-Push-button
and
of
chimney sweep push-button
to
operate PB2
has no function
~
~
PBl
is
used to reset main board
PB3,
is
used only
the
appliance
Service (PB3)
used
only
in
in
colora gas combination boilers.
and
by
qualified
fig.23
if
the
errors
cause a lock-out condition.
by
qualified person, permits
PB4,
it
is
possible
to
adjust the service setting
to
activate the chimney sweep
the minimum I maximum running mode.
chimney
sweep
person.
(PB4)
push-buttons
must
It
is
used only
be
27
W
Thermomanometer
Both
CH
operating water pressure
thermomanometer.
[I]
Timer (Optional)
The
timer provides automatic control
possible to enter 8 programs
[]]
Control
Panel Cover
(Heating Temperature
and
CH
water temperature
of
the boiler based on set operating programs.
allocatable
over the week.
And
Pressure Gauge)
can
be
read on the
It
is
Whilst push-buttons fault/error conditions
Operating
ITJ
Start
up
-Turn the test ON is
in
CH
ON/OFF
of
operating functions
to
indicate
winter mode, ignition sequence will
will
be
active.
and
can
The
Boiler
I Shut
off
the
switch to I
the stand-by
potentiometers
be
seen via
boiler
ON
I position (fig. 24a).
is
performed. After the test
mode
are
LEOs
signal without
if therelre neither
be
Stand-by
under
its
plastic cover, boiler functions
opening
LED
L3
blinks for several seconds while the
is
completed
DHW
or
CH
started automatically
L3(J)
ON
L4~
OFF
the cover.
successfully,
request.
If
to
fire the burner
L6~
OFF
CH
I
fig.
24
a
-
In
case
of
failed ignition, automatic ignition sequence
are
failed, flame failure lockout happens.
Press
the reset push-button
and
hold it for 2 seconds, to
LED
L4
the lockout condition continues after pressing the reset push-button, read the Fault/error finding.
will turn
is
repeated 5 times.
ON
to indicate
get
to the normal operation again.
this
and
LED
L3
will turn
potentiometer
and
then
L7illiD
OFF
If
all ignition trials
error condition.
page
of
38,
If
-Turn the
28
ON/OFF
switch to I
OFF
I position (fig. 24b) to shut off the boiler.
L3(J)
The
Boiler
is
I
OFF.
OFF
fig.
L4~
24b
L6~
OFF OFF
All
LEOs
L7illffi
OFF
will turn
OFF.
[I]
CH
(Central Heating)
By
adjusting the
Mode
CH
potentiometer, summer
mode
or winter
mode
can
be
selected.
a) Summer
- Rotate the demands
b)
Winter
- Rotate the
mode
CH
can
mode
CH
central heating
- Adjust boiler will
any
CH
modulate
(fig. 25a). If there
L7
turns
to
fast blink (fig.26a).
potentiometer to the I
not
be
satisfied.
potentiometer
and
also domestic hot water (fig. 25a).
The
to
summer
the I
:J?::
~I
position.
I position.
mode
water flow temperature between 40
to the desired temperature.
is a DHW
request, it interrupts the
I
CH
mode
fig. 25 a
In
the summer mode,
is
only to satisfy domestic hot water demand.
In
the winter mode, your
and
aooc
with the
LED
L7
turns
ON
to
indicate
CH
mode
until
DHW
L3CD
is
active.
ON
any
appliance
CH
potentiometer.
thatCH
request
L4~
OFF
CH
heat
satisfies
is
active
is
finished
L6~
ON
The
and
L7W.
ON
- Rotate the system will
[]]
DHW
- It
is
a)
The
b)
CH
CH
potentiometer
go
back
(Domestic Hot Water)
possible
to
appliance
mode
is
active
have domestic hot water when:
is
request interrupts the
to
minumum position.
to
stand-by
mode
Mode
in
stanby-by
mode
(fig. 25a). Because
CH
one.
again
Attente
(fig. 24a)
DHW
The
(fig. 25b).
fig.25b
or,
mode
summer
mode
L3CD
ON
has priority over
will
be
active
L4~
OFF OFF
CH
L6~
mode,
DHW
and
L7illffi
OFF
the
29
Tum
ON
a
hot
tap
to
molce
DHW
mode
active (fig. 260).
A4ust
any domesllc
n.. boller
·Turn
OFF
(ftg.
26b
wll
modulate
the
hot
!lg. 26c).
hot
water femperatue
to~
tap
to
flOP
I
DHW
models
diMired temperature.
DHW
mode.
I
a.
models
oct!lle.
be1ween
The
appiiCI'ICe
oct!lle.
L30
ON
flg.:t6a
35
flg.26b
L3(i)
ON
and
goes
L4~
OR=
60"C
with
bclck:
L4~
OI'F
L61V
ON
the
OHW
to
the
pr&lltous
L6<i1
ON ON
L7ii
Fall
.Ink
potentiometer.
mode
L7l®J
rn
Frost Protection
The
appiiCI'ICe
megsured
boltl
01
a)
Ftwt
'Nhen
the applance
In
1he
ayatern
10
"C
(measured on the
b)
f1'o4ft
·When In
1he
1t1e
system
Q08$
by~
•nsors
and
DHW
system
[JI'Otedion
(le&a
than 8
pi'OI.edion
applance
(ISS$
than 6
on
and
off automatlcatv depelldlng
for
pcotecHng
a.
Frost
protection
level
.,
In
stand-by mode
"C
),
the pump
CH
~.the
level 2
In
stand-by mode and the
"C
),
the boiler
water temperature goea aboVe 16
(bumer will
~off).
Curing frost
protectiOn~
30
flg.26c
on
water circuli$ against tteezlng.
has
2 level:
and
the
CH
sensor
rneaues
AN.
When
1t1e
CH
pump
wll
$top.
CH
sensor
rnec:'IU'8a a
starts
as
It
1here
was
"C
(meaaured
on the
burner will
CH
run
ocluCII
water temperatwe values
This
~Hon
a
low
water
te~re
water tempercm..e goes
low
water tempeta!ure
a
CH
demand.
sensol), the
with
mlnmum capacity.
When
CH
demcma
the
protects
above
01
W111
end
-The same situation occurs when when the water temperature goes
DHW
sensor measures
above
15
less
than 6
oc,
the boiler will turn stand-by
oc.
The
boiler starts
mode
and
~Information
[]]
Pump Anti-Seize Function
Anti-seize protection's function prevents the stays inactive for a been
inactive for
types,
pump
3-way valve
long
at
anti-seize function
changes
protection system.
period
of
time.
This
least 24 hours
his
position against blocking.
and
runs
and
3-way valve protection
Timer (Optional)
The
timer
on
The appliance
the control
+ Setting the
-
Set
the right slidingjl.utt2n
-Set
the
day
-Set
hour using h button.
Set
minute using m button.
­Set
the right sliding button
-
using <..L.J) button. (Arrow
timer
panel
provides setting
to(9
to
"RUN"
must
be
on
stand-by
pump
from
probable
function goes
the
pump
for 5
indepentendly
on
top
shows 1 :Monday, 2:Tuesday ... 7:Sunday)
mode
to activate frost
blocking when the
on
automatically if the
sn.
in
CH
mode.
becomes
active together
8 programs over the week.
pump
pump
In
monothermic
and
has
the
+ Programming the Unit
- Set the right sliding button to
- See the
to 2,4,6,8,
- Set the
2:Tuesday, l:Sunday} only weekends
- Set the
- Set the minute
-After setting startup
be
program
set
is
10, 12,
day
hour
number
startup
progrom,(J
14,16
are
of
startup
Apart
and
all
by
pressing h button.
by
pressing m button.
and
that
shutdown programs}
or
shutdown
from one
days
shutdown times, set the sliding button to
fig.
P.
you want to set while pressing P button. (If the
sign will appear. 1,3,5,7,9,
except
program
day
Sunday
by
pressing
setting, you
and
for
11,
13,15
are
([;])button.
can
make settings for only workdays,
all
days using this button.
RUN.
27
program
startup programs;
(1
:Monday,
31
+
Ignoring
the
program
- If you want to turn off your unit while program
press
the program activates the device,
running turns off the unit.
device sliding button
immediately, unit stops running at the
is
at
RUN
Pressing
position,
and
the
this button before program activates the unit,
the
button sign appears on display.
+ Manual Control
--In
order to control the unit manually continuously while sliding button "0"
position.
Unit
runs
according
use
sliding button
is
at
"I"
position.
to program while sliding button
+ Resetting The Clock
-In
order
to
reset the clock,
set will
be
erased from the memory.
+ Programming
-
Set
your program on the program timer.
-Set the turn
-Set the temperature thermostat
-Your unit the temperature constant the time you
ON/OFF
will
turn itself on when the timer reaches to time you have set
have
set
press
On
Winter Mode
button to ON.
at
the level you set.
R button while sliding button
to
any
level you
is
running or
~
end
of
Unit
wish.
Unit
will turn
if
you want to turn on the unit before
button.
Pressing
program time.
on
stops running when sliding button
it
this
button while
This
button
the left
of
the clock.
is
at
"AUTO"
is
at
"RUN"
self off when
turns
works
position.
position. All programs
and
system will keep
the
timer reaches
device
on
only when
Unit
runs
is
is
the
at
-
GAS
1YPE
CONVERSION
Gas
type conversion
gas
to
LPG
must
-Gas
type conversion
replacement
of the burner injectors
can
be
divided
and
in 3 sections: gas pressure adjustments,
Gas Pressure Adjustments
The
operating pressure varies depending on the type operating gas valve. gas pressure
(mechanically).
gas
pressure must
The
heat
range
be
set
by
output directly
is
adjusted, minimum
depends
means
and
32
from
LPG
to
natural
be
carried
jumper adjusment.
of
the adjusment screws that are
on
the operating pressure. When the operating
maximum heat output
out
of
gas. Therefore, minumum and maximum
only
gas
or
by
qualified
is
also adjusted
from
natural
person.
on
top
of
the
T.able
7
Malt
NatwaiGos
LPG
Firstly,
operate
-
lhlo
lkldo
-
P~l
tile
operate
the
the
the
tile
boller
at
2 liCfeWS which are 2 .aewa which are
con!TOI
~
opera!fng
Mn..
ope~
Malt
operaffng
Mn..
operaltlg
bollar
at
minimum
outwc.as
maldmum locxl while
1ocx1
located
lo<XIted
Muimum operating pi'SSute
-
Operate
·Connect (fig.
-
Rwrlo'l&
ac::KWt
-
rum
to
the
• cttec:k gas praawra
LPG
In
Minimum
-
Operate
-Connect
·Tum the adjustment clock.Wise
·Check
-
Ensure
-Replace
• Reassemble
!he
boiler
tile
!\me
28)
after
loosening
cap
scKWt
wtllch lll188n
the adjustment
burner.
operation,
operating
!he
boiler
the
1\.t)e
to
decrease
gas
pressure
that
the
top
pl'$$$1.1'e
the
at
maxtmum locxl.
of
a clocking gas mater
tile
tap'S
from
rnaldmum
aa
(2)
In
flg. 28.
scKWt
clockwise
maaauramanta
tile
~umnent
pressure
at
mwmum load.
of
a clocking gas meter
scKWt
wtllch
QG$
flow
measurements on
'a
8CfeW
Ia
tightened
regulator
front
cop
pm~el
and
GO'
pnMII.lnt
GCH
pr...e
go$
p!eNUfe
gas
pr-.e
wtllle
~LIItfng
on
the
lower
on the com
to
reach
the
gas
adjustJtte.tt:
to
actew.
pres$Ure
on
taeW
regulator
to
lncreaae 01
tile
gaa
(2)
It
tightened
adj1161menf:
to
Ill
teen
aa
(1)
10
!he
burner.
the
gas
after
mal*tg
$CIVW.
the control panel.
24W/ModBit 28W/ModBis
(mbclr) 11.2 11.3
(l'nbG)
(mbclr)
(l'nbG)
adjusftlg
era
1.3
28/36
3,3/4,1
mmdmum
mmmum
edae
operallng
to
remove
the
ol the control panel.
oparatfng
1,2
28/36
3,4/4,2
pcesaure. front
panel.
varve.
outlet
pressure
to
counter-<:lo<:tcW!se
malar
the
outlet
In
flg. 28 counter-clockwise
mater
the
(1) Mechanical Mini
tap
whose
cia
GlCPOS&
to
10
pressure
to
pressure
satisfy the desired vakle.
the end for
reg~
to
dea'ealle
28/36
tap.
sat1stv
the desired vakle.
adJustments.
mum
Adjustment
mater
auPf)IV
to
Increase 01
pressure
and
Is
=9
mm
~usment
gas
tloW
pressure.
Gas
~
Inlet
fig.28
33
Replacement
Of
The
Burner
Injectors
A.
~
-
Shut
off the boiler
valve on the boiler.
- Undo the 2 screws which are
- Undo the 2 screws which are
-
Pull
the control panel outwards.
- Undo the 6 screws which are located around the (in
room sealed fan assisted boiler).
- Undo the 4 screws which fasten the manifold
Fix
the suitable burner injectors
-
kW
models I 15 pieces of injectors used
- Reassemble
in
the reverse order.
WARNING:Keep the gas valve
supply
by
turning the
Table 8
closed
ON/OFF
located located
according
during
on the lower on the corners
in
replacement
switch to
to
to type
28
kW
Injectors Diameter
I Natural Gas
I
LPG
jumper
When the supplied with natural gas, jumper
Adjustment
appliance
is
converted to
WARNING: Maximum pressure regulator must the self-adhesive conversion
boiler
conversion.
WARNING:
property
Therefore, gas
person
LPG,
jumper
X7
must
be
after
gas type
In
case
damage, severe
leak
after
gas type conversion
open
of
test
on
OFF
position (fig. 24b)
edge
of
body
to remove the combustion
the burner
of
gas
models).
01,25
mm
00,75mm
X7
must
circuit.
label
gas leak,
injury
must
be
the
boiler
and
electricity
of
the
burner
to
remove the front panel.
the control panel.
to
remove the burner.
(13
pieces
be
short circuit.
must
be
fire
or
explosion hazard,
or
death
performed
injectors.
and
of
injectors used in 24
If
be
sealed
placed
can
by
qualified
turn off the gas
body
the
appliance
and
on
the
happen.
cover
is
+
GAS
LEAK
TEST
~
Apply a rich soap
indicate a gas leak
~
In
case
of
~
Check
~
Replace the part/parts if gas leak
gas leak, tighten the
the
pipe
connection
and
water solution to the surface of all
CAUTION:
connections
34
pipe
again
connection.
for gas leak.
can
not
be
Keep
soap
during
gas
pipe
connections. Bubbles
stopped.
and
water solution away from electrical
leak
test.
- FAULT/ERROR
FINDING
Several checks are included the
error
is
displayed
be
disabled.
+
Error
conditions
can
by
to
protect the boiler
the
alarm
be
divided
and
its
environment.
LED's
on
the display
panel
in 2 groups: lockout conditions
a) Lockout conditions, flame failure lockout, high limit lockout by
keeping the reset push-button for 2 sees., then
stand-by
b) Blocking conditions, or disappears. be
mode.
open
circuit),
generated
If the
TTB
For
example,
and
problem
CH
error
keep
continues,
NTC
error (short circuit or
and
low water pressure, will reset as soon as the cause
when
CH
sensor
the
system off until
call
is
qualified
out
of
the
sensor
main
board
service.
open
operating
is
within
Table 9
Communication error
Flame failure lock-out
In
case
of
error condition,
(Table
9)
and
heat
demands
and
blocking
and
APS
error,
can
and
display
circuit),
L3(i)
Fast Blink Blink Blink Blink
OFF
DHW
range,
blocking
operating
L4~
Fast
NTC
range
ON
conditions.
only
be
cleared
panel
will
be
error (short circuit
of
the
problem
condition will
again
L6~
Fast
OFF OFF
L71Dffi
Fast
will
in
CH
NTC
(short
circuit I open circuit) error
DHW
NTC
(short
circuit I open circuit) error
High limit lockout (over-temperature)
TTB
error
(in
open flued operation)
APS
error
(in
room sealed operation)
Low
water pressure
Other microcontroller (main board)
errors
Fast
Blink
OFF
OFF
OFF
OFF
OFF
ON
ON
ON Blink
Fast
Blink
ON
ON
ON
Fast
Blink
OFF OFF
Fast
OFF OFF
OFF
OFF
Fast Blink Blink
ON ON
Fast
Blink
Fast
Blink
Fast
OFF
35
Table 10
Fault/Error
1-
The
boiler does not start
by
turning the
'ON'
2-
Flame failure lockout: - No flame
When turning the
to ' ON to
indicate
LED
after
seconds.
3-
CH
fast
and
4-
DHW
blinking fast
ON/OFF
position.
NTC
(L3
is
' position,
NTC
ON/OFF
LED
the lockout position
L3
blinks for several
error:
LED
L4
is
ON.
error: and
L4
LED
up
button
not
ON).
L4
tums
L3
is
blinking
L6
is
ON. range
- Lack
to
button ignition trials.
ON
­range for more than 1 0 seconds.
is
­for more than 1 0 seconds.
CH
DHW
Cause
of
electricity. -
in
burner after 5
sensor
is
out
of
and
sensor and
this
this
operating
condition lasted
is
out
of
operating
condition lasted
Solution
Check
the electricity connections.
-
Press
the and lockout pressing check valves.
- Having all tries qualified
-
Check
radiator
or
not.
-
The condition operating consult
Check
-
radiator
or
not.
The
­condition operating consult
reset push-button
hold
it for 2 seconds. - If
condition
the
reset push-button,
the
gas
inlet
service.
the
CH
valves whether it
system stays in
until
CH
range. If
qualified
the
CH
valves whether it
system stays in
until
DHW
range. If
qualified
continues
and
expired,
inlet
valve
blocking
sensor
repeated,
service.
inlet
valve
blocking
sensor
repeated,
service.
PB1
the
after
supply
consult
and
is
open
is
in
and
is
open
is
in
5- High LED
6­fast
36
limit lockout: -
L4
is
blinking fast. will
APS
Error:
LED
L7
is
is
ON.
and
L4
If
limit thermostat
be
generated. chimney.
blinking - Insufficient flue draught -
is
open, error
-
Check
the
flue
connections
-
Press
the
and
If the lockout condition continues
­after button,
Check
-
Press and
-
If after pressing the reset push-button, consult qualified service.
reset push-button
hold
it for 2 seconds.
pressing
hold it for 2 seconds.
the lockout condition continues
the
consult
the flue connections.
the reset push-button
reset push-
qualified
I
PB
1
service.
PB
1
Fault/Error Cause
7-
TTB
Error:
LED
L7
fast
and
L4
8-
Low
water pressure:
ON
and
blinking
9-
All
1 (main board) and blinking
LED
fast.
No
communication: - Main board
LEOs
are blinking
0-
Other microcontroller
L7
are
fast.
is
ON.
L6 -L7
errors:
ON
is
and
- MAINTENANCE
-The boiler should and
service operations must
-
Only a damp surfaces should rust in
your
- STANDARDS
During
the
in this
manual
be
cloth
be
appliance.
dried
AND
installation
and
also all relevant standards
Solution
blinking -Insufficient chimney draught. - Check the chimney.
are not suitable for your condition until water pressure
fast.
L3,
L4
checked should
-
TTB
sensor
is
out
of
range
and
for more than 1 0 seconds. operating range. Wait
L4
is
- Operating water pressure appliance.
communicate with display
panel.
this
operating -
condition lasted
is
can
not - Consult qualified service
-
L6
is
and
serviced for general
be
carried
be
used for
completely.
out cleaning
Do
not
only
use
maintenance
by
qualified
the
outer
chemical
The
system
condition until TTB
error time repeated, consult qualified service.
-
The
system
back
to nominal value.
- Check the valves whether open or not.
- Check circuits for leaks.
- Consult qualified service.
person.
space
of
subtances
stays in blocking
CH
is
15 minutes.
stays in blocking
once
a year.
the
boiler
or
solutions
sensor
is
15
minutes.
Maintenance
and
then
which
REGULATIONS
and
operation
of
the
boiler,
and
the
instructions
local
regulations must
and
precautions
be
obeyed.
detailed
in
If
is
is
the
cause
- APPENDIX
ITJ
Pump's characteristic curve (height & flow)
H
(m)
5~~._~~--~~-4--~-+--~~~~4--4--+--+~
0.0 0.2
0.4 0.6
0.8
1.0 1 .2
1.4 1 .6 1 .8
fig.29
2.0
2.2
2.4 2.6
37
[]]
24
kW
gas combination boilers' capacity & operating gas pressure
diagrams for natural gas
28 24 20
~
16
"C
~
12
4
0
0
2
4
3
5 6
7
9
10
11
8
12
W
28
kW
gas combination boilers' capacity & operating gas pressure
diagrams for natural gas
32 28 24 20
~
16
"C
0
.9
12
0
~
8
.s::.
,_
4 0
0
Operating Gas
fig.30
2 3 4 5 6 7 8 9
Operating Gas
fig.31
Pressure
Pressure
(mbar)
(mba~
10
11
12
38
[I]
24
diagrams for
28 24 20
~
16
"0
0
.9
12
0
E
CD
8
.t::
,_
4
0
[]]
28
diagrams for
kW
gas combination boilers' capacity & operating gas pressure
LPG
,.
0 2 4 6 8
kW
gas combination boilers' capacity & operating gas pressure
LPG
10
12 14
Operating
16
18
Gas Pressure (mbar)
fig.32
20 22 24 26
28
30
28 24
~
20
:;
16
~
12
J 8
4
0
0 2 4 6 8
ALL
RIGHTS
Product specifications are subject to
RESERVED
10 12 14
Operating
Gas
fig.33
change
16
18
Pressure (mbar)
without notice.
20
22
24
26
28
30
39
- ALL RIGHTS RESERVED
Product specifications are subject to change without notice.
Manufacturer: EMAS MAKiNA SANAYi
Organize Sanayi Bolgesi Mustafa Kemal Bulvan No: Tel. : (0236) 213 00 Fax:
(0236) 213 08 59
email: emas@emas.com.tr www.emas.com.tr
21
A.~.
13
MANiSA
Sales: ELEKS
Yah 34844 Maltepe I iSTANBUL/TURKEY Pbx : +90 216 458 9200 Fax : +90 216 441 2606 - 458 9293 E-Mail: www.eleks@eleks.com.tr
FOREIGN
Mahlelesi Ziya Gokalp Cad. No: 3
TRADE INC.
40
Loading...