Ebtron GP1, HP1, SP1 Quick Installation Manual

Page 1
T
®
GP1/HP1/SP1 DUCT & PLENEM PROBES - INTERNAL
EBTRON
a measurable difference!
GP1, HP1 AND SP1 DUCT AND PLENUM PROBE
QUICK INSTALLA
Document Number 930-0035
ION
M
G
OUNT
UIDE
INTERNAL MOUNT INSTALLATION
OVERVIEW
This document provides the instructions necessary to install Internal Mount Probes as shown in Figure
1. Internally mounted probes are installed inside of the duct/plenum. Internal mounting is ideal for applications where access through the outside of the duct is limited or not possible and is also well suited for installation in air handling units and plenums. Installation consists of marking the duct for bracket installation and then securing the probe mounting brackets. For detailed probe information, refer to the Duct/Plenum Probe technical manual under separate cover. For detailed information on transmitter set up and operation of the complete airflow measurement station, refer to the associated transmitter technical manual under separate cover. Observe the following installation precautions:
CAUTION
Location of the probe(s) is critical for proper performance of the airflow station. Probes must be installed in accordance with the engineer’s plans and EBTRON Minimum Placement Guidelines (Figures 4 and 5) for the specified location. For additional probe placement detail, refer to the probe technical manual under separate cover.
Figure 1. Internal Mount Probe
Ensure that adequate installation/service clearance exists at the installation site to permit installation of the probe into the duct/plenum, and that the cable length for the probes is sufficient to reach the planned transmitter installation. Refer to the mechanical details of Figure 2.
On applications where multiple probes are to be installed at a single measurement location, install probes in accordance with Figure 3 (Internal Mount Probe Spacing/Configuration). In addition, when traverse data is desired (Gold Series GP1 probes only), place the lowest numbered probe at the top of the duct for horizontal mounting. For vertical mounting, place the lowest numbered probe on the left side of duct when viewed from the upstream side of the mounting location, with cables exiting on the higher side to prevent any potential moisture from accumulating on the heated sensors.
Insulation that may interfere with mounting should be temporarily removed prior to installation and replaced afterwards.
IG_GPIG_P_INT_R1A
INTERNAL MOUNTING OVERVIEW
Figure 2 provides Standard Internal Mount probe installation details. Probes are installed from inside of the duct or plenum using the included brackets. Internal insulation that may interfere with mounting should be temporarily removed to permit installation. Internal mount probes are manufactured shorter to permit 0.75 in (19 mm) adjustment and allow for installation clearance. Install each probe as follows using the convenient check boxes at each step.
EBTRON, Inc. 1663 Hwy. 701 S., Loris SC 29569
Toll Free: 800.2EBTRON (232.8766)
Fax: 843.756.1838
www.
1
Page 2
T
®
EBTRON
a measurable difference!
GP1/HP1/SP1 DUCT & PLENEM PROBES - INTERNAL
QUICK INSTALLA
INTERNAL MOUNT MARKING AND PREPARATION
1. Each probe package is factory labeled for the specific location and duct size for which it is designed. Orders for locations requiring multiple probes at a specific location are typically banded and packaged together. Determine the specific duct location for the probe(s) as indicated on the engineer's plans showing where the airflow measuring station is to be located. Refer to Figure 3 for probe spacing and orientation.
2. Carefully open the probe packaging and inspect for damage. Proceed to the specific additional installation instructions for rectangular ducts (at step 3), round ducts (at step 6) or flat oval duct applications (at step 9).
For Rectangular Ducts
3.  The first dimension of the probe size indicates the length of the probe. The second dimension indicates the specific duct internal mounting inside dimension 'X' (including internal insulation). On ducts with internal insulation that cannot be removed, adjust ‘X’ to equal the internal mounting inside dimension, minus two times the thickness of the insulation. Refer to Figure 2 and verify that the probe is the correct size for the application duct size. Mark a point on the center of the inside of the duct at ‘X’. Draw a line on the inside of the duct at this point that is perpendicular to the edge of the duct. This line will be used to locate the position of the probe mounting brackets. The probe quantity for the measurement site determines the probe installation configuration/orientation as shown in Figure 3.
4. Using the applicable Rectangular Duct Probe mechanical and spacing details of Figures 2 and 3, mark the location for the cable exit end of each probe bracket at the location line(s) drawn in step 3.
5. Mark the other corresponding end bracket (without cable) installation locations for each probe at the opposite side of the inside duct wall.
Proceed to step 12, Final Assembly.
For Round Ducts
6. Mark and draw a line around the inside circumference of the duct at the point where the probe brackets are to be installed. The number of probes for this specific measurement site determines the probe installation configuration and orientation as shown in Figure 3. Applications with multiple probes must be staggered 1.5 to 2 in (38.1 to 50.8 mm) from each other as shown in Round Duct Probe Spacing detail of Figure 4 to prevent probes from intersecting at the center of the duct.
7. Using the Round Duct Probe Spacing detail of Figure 3, locate and mark the individual probe mounting location(s) on the circumference line drawn in step 6.
8. Mark the non cable end bracket installation locations for each probe on the opposite side of the inside duct wall.
Proceed to step 12, Final Assembly.
For Flat Oval Ducts
9. Mark and draw a line around the inside circumference of the duct at the point where the probes are to be installed. For oval duct applications, orientation is as shown in the Oval Duct Probe Spacing table and detail application illustrations of Figure 3. Configuration ‘2b’, ‘3b’ and ‘4b’ probes must be staggered 1.5 to 2 in (38.1 to 50.8 mm) from each other in order to prevent probes from intersecting at the center of the duct.
10.Using the Round Duct Probe Spacing detail of Figure 3, locate and mark the individual probe installation location(s) for the cable exit end of each probe bracket on the circumference line drawn in step 6.
11.Mark the non cable end bracket installation locations for each probe on the opposite side of the inside duct wall.
Proceed to step 12, Final Assembly.
ION
M
G
OUNT
UIDE
IG_GPIG_P_INT_R1A
2
EBTRON, Inc. 1663 Hwy. 701 S., Loris SC 29569
Toll Free: 800.2EBTRON (232.8766)
Fax: 843.756.1838
www.
EBTRON.com
Page 3
T
®
EBTRON
a measurable difference!
GP1/HP1/SP1 DUCT & PLENEM PROBES - INTERNAL
QUICK INSTALLA
ION
M
OUNT
G
UIDE
FINAL ASSEMBLY FOR STANDARD PROBES
12. Ensure that provision has been made for an appropriate cable exit hole through the duct/plenum. The cable exit hole must be of sufficient size to pass the probe connector (which is approximately 0.85 in [20.8 mm]) PLUS any other cables planned for this exit hole. The edges of the cable exit hole must be prepared to ensure that no damage occurs to cable or insulating jacket during or after installation.
13. Loosen the Non-Cable End Adjustment Screws on both sides of the probe as shown in the detail of Figure 2 for Standard Probes to permit pivoting the probe and bracket.
14. Carefully place the non-cable end bracket at the non cable end marked location on the inside of the duct wall so that when the probe is installed, airflow will be in the direction of the arrows printed on the bracket and/or probe. For ease of installation, the probe can pivot within the bracket after loosening the non-cable end Adjustment Screws (completed in step 13).
NOTE:
If the airflow direction labels are not visible on the bracket and/or probe, orient the probe so that the sensor SET SCREWS (two per sensor insert) face the DOWNSTREAM side of the probe as shown in Figure 2. (There are no setscrews on the upstream side of the sensor inserts).
15. Fasten the Non-Cable End mounting bracket to the duct at two places with appropriate field supplied fasteners, again making sure that printed airflow arrows on the bracket and/or probe are in the actual direction of duct air flow.
16. Carefully route the probe cable through the cable exit hole prepared in step 12, and pivot the cable end probe bracket to the marked location on the duct wall.
17. Fasten the cable end mounting bracket to the duct at two places with appropriate field supplied fasteners, again making sure that printed airflow arrows on the bracket and/or probe are in the actual direction of duct air flow.
18. Slightly loosen the cable end probe Adjustment screws on both sides of the probe to permit probe movement within the bracket.
19. Carefully center the probe in the duct opening, and then tighten the probe Adjustment Screws on both sides of the cable end bracket, and then on both sides of the non-cable end bracket as shown in Figure 2 detail. (There are 4 Adjustment Screws total).
20. Repeat steps 12 through 19 for all probes.
21. Seal all cable exit holes with suitable sealant material.
22. Connect all sensor probes to the transmitter supplied for the specific location. This completes probe installation.
Complete the installation, wiring and set up of the associated transmitter as detailed in the separate Transmitter Installation Guide and the Installation, Operation and Maintenance Technical Manual (each provided under separate cover).
IG_GPIG_P_INT_R1A
EBTRON, Inc. 1663 Hwy. 701 S., Loris SC 29569
Toll Free: 800.2EBTRON (232.8766)
Fax: 843.756.1838
www.
EBTRON.com
3
Page 4
T
FINAL ASSEMBLY FOR STANDARD PROBES*
* Note: The following instructions apply to Standard probes. For AIR IQ Probes , see s eparate
AIR IQ FINAL ASSEMBLY ins tructions that follow, and refer to Figure 3 .
NOTE:
NOTE: Set
screws ffor ssens or iinserts oon pprobes mmust aalways fface ddownstrea m iin aairflow.
STANDARD PPROBE INSE RTION
MOUNT
BR ACKE T
DETAIL
STANDARD
PROBE
INSE RTION
MOUNT
INSTALL
DETAIL
Mounting SScrews 88 RReq’d (4/ Brack et
Field SSupplied)
NOTE:
®
EBTRON
a measurable difference!
GP1/HP1/SP1 DUCT & PLENEM PROBES - INTERNAL
QUICK INSTALLA
P M
D
1.00 in.
(25.4 mm)
Gasket
1.1 in. (27.94 mm) dia. tube
[8.00 in. (203.20 mm) to 192.00 in. ( 4876.80 mm) long]
Overall Duct Size
(including internal insulation)
F
Terminal end bracket
Gasket
M
D
3.75 in. (95.25 mm)
5.25 in. (133.35 mm)
0.75 in.
(19.05 mm)
-s
Insertion side bracket
Insertion Side Bracket
PRESS
0.75 in. ( 19.05 mm) dia. sensor opening
1 to 4 sensors/probe
1 to 8 sensors per probe
Washer
Lock nut
0.375 in. (9.52 mm) x 1.50 in. (38.1 mm) Stud
Terminal End Bracket
1.50 in.
38.10 mm
4.00 in.
M
OUNT
ION
G
UIDE
(101.60 mm)
Airflow
Cable
0.188 in. (4.78 mm) Mtg. Holes (4)
Probes under 18 in (45 7.2 mm) are not equipped with the terminal end bracket, and therefore do not require a mounting hole on the opposite side of the duct.
5.25 in. (133.35 mm)
4 in (101.60 mm)
0.375 in. (9.53 mm)
0.188 in. (4.78 mm) Mtg. Holes (4)
0.75 in. (19.05 mm)
5.25 in. (133.35 mm)
1/2 in (12.70 mm)
0.375 in.
(9.53 mm)
0.50 in. (12.70 mm)
4.00 in (101.60 mm)
Figure 2. Standard Internal Mount Probe Mechanical Detail
4
EBTRON, Inc. 1663 Hwy. 701 S., Loris SC 29569
Toll Free: 800.2EBTRON (232.8766)
Fax: 843.756.1838
www.
IG_GPIG_P_INT_R1A
EBTRON.com
Page 5
T
2b
2c
3b
RECTANGULAR DDUCT PPROBE SSPACING
ROUND DDUCT PPROBE SSPACING
OVAL DDUCT PPROBE SSPACING
Select cconfiguration ddiagram ffrom ttable bbased uupon pprobe llength/duct ssize aand ssensor ddensity
2 8 4 0 6 2 8 4 0 6 2 4 6
8 0
2
8
0
6
2
4
6
2
8
4
0
6
8
0
4
A
D
J
A
C
E
N
T
S
I
D
E
L
E
N
G
T
H
1a
3c
4b
4c
EBTRON
a measurable difference!
GP1/HP1/SP1 DUCT & PLENEM PROBES - INTERNAL
One Probe Two Probes Three Probes Four Probes
1/2 X
1/2 X
One Probe Two Probes Three Probes Four Probes
®
1/4 X
1/2 X
1/4 X
90°
1/6 X
1/3 X
1/3 X
1/6 X
60°
QUICK INSTALLA
1/8 X
1/4 X
1/4 X
1/4 X
1/8 X
90°
ION
M
OUNT
G
UIDE
112
DCBADCB ADCBA DCBADC BADCB ADCBADC BADCB ADCBA DCBADCB ADCB ADCBADC BA
1a 1a 1a 1a
2b 2b 2c 2c 2c 3c 3c 3c 3c 3c 3c 4c 4c
112 118 224 330
- - - - - - - - -> H
336
T G N
442
E L
448
E D
I
554
S T N
660
E C
666
A J D
772
A
884 996
11008
<- - - - - - - - -
11220
1 PROBE OVAL
<- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -PPRROOBBEELLEENNGGTTHH - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ->
118
224
330
1a 1a
2b
2b 2b 2b 2b 2c 2c 2c 2c 3c 3c 4c
2b
1a
1a
1a
2b 2b 3c 2b 3c
2b
2b
1a 1a 1a 1a 1a 2b 3c 2b 1a 2b 3c 2b 1a
3b 1a 1a 1a 1a 1a 1a
442
336
1a 1a
1a
1a2b
2b1a1a
2b
2b
2b
2b
2 PROBE OVAL
448
1a
1a
2b
2b
1a
2b
2b
1a 2b 1a 1a 1a 1a 1a 1a 1a 1a 1a
4b 3b 2b 1a 1a 1a 1a 1a 1a 1a 1a 1a
60°
660
554
1a 1a 1a 1a
2b1a1a
1a
1a
2b2b1a
1a
4b 3b 2b 1a 1a 1a 1a 1a 1a 1a 1a
2b 1a 2b 1a
1a2b
2b 1a 2b 1a 2b 1a
2b 1a 2b 1a 2b 2b 2b
2b 2b 2b 2b 2b 2b 2b
2b
2b 2b 2b 2b 2b 2b 2b
2b 2b 2b 2b 2b 2b
4b
1/4 X
666
1a 1a
2b 2b 2b 2b 2b 2b
2b 1a 1a 1a 1a 1a 1a 1a
4b
2 PROBE OVAL
1/2 X
45°
772
2b 1a
2b 2b 2b 2b 2b
2b 1a 1a 1a 1a 1a 1a
4b
1/4 X
884
996
11008
1a 1a 1a 1a
1a
2b 1a 1a 1a
2b 2b
2b 2b
2b 1a 1a 1a 1a 1a
4b
1a 1a1a
2b 2b
2b 2b 2b
2b 1a 1a 1a 1a
4b
60°
2b 2b
2b 2b
2b 1a 1a 1a
4b
3 PROBE R OUND
11220
1a4c4c
4c 1a
2b
2b
2b 1a 1a
4b
2b 1a
IG_GPIG_P_INT_R1A
1/6 X 1/3 X
EBTRON, Inc. 1663 Hwy. 701 S., Loris SC 29569
3 PROBE OVAL
1/3 X 1/6 X
Figure 3. Internal Mount Probe Spacing/Configuration
60°
4 PROBE R OUND
90°
45°
4 PROBE OVAL
1/8 X 1/4 X 1/4 X
1/4 X 1/8 X
Toll Free: 800.2EBTRON (232.8766)
Fax: 843.756.1838
www.
EBTRON.com
5
Loading...