EBARA DSU, DSHU Operating Instructions, Installation & Maintenance Manual

Page 1
Submersible Sump/Drainage Pump
Model DSU
Model DSHU
Operating Instructions, Installation & Maintenance Manual
EBARA Fluid Handling
EBARA International Corporation
CALL 1-800-577-8111 FOR SALES AND SUPPORT
Page 2
Operating, Installation, and Maintenance
CALL 1-800-577-8111 FOR SALES AND SUPPORT
Contents
Section Page
Safety Information and Introduction .................................................................................................. 2
Specifications .................................................................................................................................... 2
Pump Checks .................................................................................................................................... 3
Installation .......................................................................................................................................... 4
Operation .......................................................................................................................................... 7
Maintenance and Service .................................................................................................................. 8
Other .................................................................................................................................................. 11
Safety Information and Introduction
WARNING
Before handling this pump, always disconnect the power first. Do not use sparkable electrical devices or flames in a septic (gaseous) or possible septic sump.
Do not work under heavy suspended objects unless there is a positive support under it to stop its fall in event of sling or hoist failure. Disregard of this warning could result in personal injury.
This pump should only be serviced by qualified or factory trained personnel.
CAUTION
This instruction manual includes necessary items for installation, operation, and maintenance. Read this manual carefully to ensure correct installation, operation, and maintenance.
Be sure to keep this instruction manual on hand for future reference.
Design of this EBARA pump is based on superior engineering and long experience. To prevent trouble and provide satisfactory operation and long life, it is important to understand the EBARA pump thoroughly by careful study of this manual. If any questions arise regarding this manual, please direct them to EBARA INTERNATIONAL CORPORATION.
Specifications
CAUTION
Be careful not to exceed the given specifications in the use of your products.
Check the nameplate for your pump's head (HEAD), discharge volume (CAPACITY), speed (SPEED), motor voltage and current. Other specifications are noted in the chart below.
Item Specifications
Model DSU Model DSHU
Type Sewage, waste water, miscellaneous drain water
Liquid handled Temperature 32 - 122
Casing Cast iron
Materials Impeller Cast iron
Shaft 403 stainless steel Motor type Air-filled submersible motor Shaft seal lubrication oil Turbine No. 32 ISO VG - 32 Rotaly compressor oil A Maximum water depth 65 ft 65 ft Installation Floor mounted
F Motor: 1/2, 1HP: 32-158•F
Motor: 2-5HP: 32-176
F
EBARA Fluid Handling
rev. 0706
Page 3
EBARA Submersible Semi-vortex Sewage Pumps DSU/DSHU
Operating, Installation, and Maintenance
Installation
1. Check the following before beginning installation:
Insulation resistance measurement: (1) For three phase motor:
With the motor and cable (excluding the power supply connections) immersed in water, use a meggar to measure the insulation resistance between the ground wire and each phase of the motor.
(2) For single phase motor:
Use a megger to measure the insulation resistance betweeb each wire and grounding wire.
Pump Checks
1. Check the following points upon receipt of your pump:
(1) Check the name plate to confirm that it is the pump
ordered.
(2) Ensure that the pump voltage is the same as the power
at your location.
(3) Check oil level at oil plug. (4) Check that all plugs and fastening bolts are properly
tightened.
(5) Check that the pump has not been damaged and the
cable glands and cables are in a satisfactory condition.
(6) Check accessories and spare parts against the packing
list.
(7) Check that the impeller turns smoothly by hand.
2. Precautions when operation is suspended:
(1) If operation is to be suspended for 30 days with the pump
immersed in water, measure the insulation resistance of the motor. If resistance is over 1 mega ohm, operate pump to prevent rust from developing on moving parts. Follow the instructions under OPERATION when pump operation is to be resumed.
(2) For dry storage, clean out pump and store in a dry place.
Follow the instructions under INSTALLATION and OPERATION when pump operation is to be resumed.
WARNING
Before insulation resistance measurement, always disconnect the power first.
All electrical work should be performed by a qualified electrician and all national and local electrical codes must be observed.
CAUTION
When measuring the insulation resistance with meggar for motor windings do not test overload protection.
Overload protection is MOTOR PROTECTION (AUTO-CUT) that is used for up to 5HP; the motor still could have power to it if AUTO-CUT is kicked out.
CAUTION
Measure the insulation resistance. The value should be more than 1 mega ohm. While making the measurement, keep the power supply cable off the ground.
CALL 1-800-577-8111 FOR SALES AND SUPPORT
Page 4
EBARA Submersible Semi-vortex Sewage Pumps DSU/DSHU
Operating, Installation, and Maintenance
Installation
2. Pump Installation
1. Clean the installation area.
2. Under no circumstances should the cable be pulled while the pump is being transported or installed. Attach a chain or rope to the grip and install the pump.
3. This pump must not be installed on its side. Ensure that it is installed upright on a secure base.
4. Install the pump at a location in the tank where there is the least turbulence.
5. If there is a flow of liquid inside the tank, support the cable where appropriate (See Fig. 1).
6. Install piping so that air will not be entrapped. If piping must be installed in such a way that air pockets are unavoidable, install an air release valve wherever such air pockets are most likely to develop.
7. Do not permit end of discharge piping to be submerged, as backflow will result when the pump is shut down.
8. Non-automatic pumps (model DSU, DSHU) do not have an automatic operating system based on built-in floats. Do not operate the pump for a long time with the water level near the minimum operating level as the automatic cut-off switch incorporated inside the motor will be activated.
To avoid dry operation, install an automatic operating system, as shown in Fig. 2 and maintain a safe operating water level.
WARNING
When lifting the pump, use appropriate crane (or hoist) and lift system, check position and tightness of lift system so that weight of the pump is not UNBALANCED. Failure to observe this precaution can result in serious accidents. Handle the cables very carefully. If they are bent or pulled excessively, the cable and the moulded seal may be damaged, resulting in insulation failure. Also, care is needed to protect cable ends against water intrusion.
CAUTION
Before installation check rotation. Correct rotation is clockwise when viewed from top of motor. Read ELECTRICAL WIRING.
Fig. 1
Fig. 2
Size Output L
(inch) (HP) (inch)
2 1/3-5 4 1/8
1-2 4 15/16
3 3-5 6 1/8
CALL 1-800-577-8111 FOR SALES AND SUPPORT
Page 5
EBARA Submersible Semi-vortex Sewage Pumps DSU/DSHU
Operating, Installation, and Maintenance
WARNING
Check that the power is locked off and disconnected before working on pump. All electrical work should be performed by a qualified electrician and all national and local electrical codes must be observed.
Three Phase
• Model DVSU
E : GREEN U : RED V : WHITE W : BLACK
PR : PROTECTOR
(AUTO-CUT)
L
1
: RED L2: WHITE L3: BLACK
PR
for 230V
PR
for 460V
208/230V 460V
E : GREEN L
1
: RED
L
2
: WHITE
L
3
: BLACK
PROTECTOR
Three Phase – Hot Water Type
• Model DVSHU
CALL 1-800-577-8111 FOR SALES AND SUPPORT
Page 6
EBARA Submersible Semi-vortex Sewage Pumps DSU/DSHU
Operating, Installation, and Maintenance
Installation
(2) Cable
a) Never let the end of the cable contact water b) If the cable is extended, do not immerse the splice in
water.
c) Fasten the cable to the discharge piping with tape or
vinyl strips.
d) Install the cable so that it will not overheat.
Overheating is caused by coiling the cable and exposing it to direct sunlight.
(3) Grounding
As shown in Fig. 4 ground the green wire (label E). Under no circumstances should the green wire be connected to the power supply.
(4) Use short circuit breakers to prevent danger of electrical
shock.
Operation
1. Before starting the pump:
(1) After completing installation, measure the insulation resistance again as described in INSTALLATION. (2) Check water level. If the pump is operated continuously for an extended period of time in a dry condition or at the lowest water level, the motor protector (less than 10HP) will be activated. Constant repetition of this action will shorten pump service life. Do not start the pump again in such a situation until after the motor has completely cooled.
2. Test Operation:
(1) Model DSU, DSHU
a) Turn the operating switch on and off a couple of times to check for normal pump start. b) Check the direction of rotation. If discharge volume is low or unusual sounds are heard when the pump is operating,
rotation has been reversed. When this happens, reverse two of the three wires.
c) Check amperage, voltage, and head pressure.
Maintenance and Service
Check pressure, output, voltage, current, vibration, and other specifications. Unusual readings may indicate a problem requiring immediate service. Contact your local EBARA INTERNATIONAL CORPORATION representative as soon as possible.
CAUTION
Check rotation. Correct rotation is clockwise when viewed from top of motor. Pump should be started with gate valve closed, and then the operator should open the valve gradually.
Fig. 4
WARNING
Disconnect power cable from power source before servicing unit. Normal maintenance should be done by qualified personnel.
CALL 1-800-577-8111 FOR SALES AND SUPPORT
Page 7
EBARA Submersible Semi-vortex Sewage Pumps DSU/DSHU
Operating, Installation, and Maintenance
Maintenance and Service
1. Daily inspections:
(1) Check current and ammeter fluctuation daily. If ammeter fluctuation is great, even though within the limits of pump
rating, foreign matter may be clogging the pump. If the quantity of liquid discharged falls suddenly, foreign matter may be blocking the suction inlet.
2. Regular inspections:
(1) Monthly inspections
Measure the insulation resistance. The value should be more than 1 mega ohm. If resistance starts to fall rapidly even with an initial indication of over 1 mega ohm, this may be an indication of trouble and repair work is required.
(2) Every 6 months
Check the mechanical seal every six months. If you notice water mixed with the oil or cloudy texture of the oil, these may be indications of a defective mechanical seal requiring replacement. The service life of the mechanical seal can be prolonged by replacing the oil in the mechanical seal chamber once a year. When replacing the oil, lay the pump on its side, with filler plug on top as shown in Fig. 5.
For model DSU motors, inject turbine oil No. 32 (ISO VG-32) until it overflows. For model DSHU motors inject rotaly compressor oil A until it overflows. Be certain to dispose of oil residue properly.
(3) Yearly preventive maintenance
Conduct an overhaul of the pump annually. These intervals will reduce the possibility of future trouble.
3. Parts that will need to be replaced:
Replace the appropriate part when the following conditions are apparent.
Above replacement schedule is based on normal operating conditions.
Fig. 5
Table 1
HP Oil
1/3 4 ozs 1/2 6 ozs
1 6 ozs 2 12 ozs 3 57 ozs 5 57 ozs
Replaceable Part Mechanical Seal Oil Filter plug gasket Lubricating oil O-ring
Whenever oil in Whenever oil is Whenever clouded Whenever pump
Replacement guide mechanical seal replaced or or dirty is overhauled
chamber is clouded inspected
Frequency Annually Annually Annually Annually
CALL 1-800-577-8111 FOR SALES AND SUPPORT
Page 8
EBARA Submersible Semi-vortex Sewage Pumps DSU/DSHU
Operating, Installation, and Maintenance
Troubleshooting
CAUTION
All service should be done by factory trained or qualified personnel only.
Trouble Cause Remedy
Does not start. (1) Power failure (1)-(3) Contact electric power company; devise counter-measures Starts, but (2) Large discrepancy between power source and voltage immediately stops. (3) Significant drop in voltage
(4) Motor phase malfunction (4) Inspect connections and magnetic switch (5) Electric circuit connection faulty (5) Inspect electric circuit (6) Faulty connection of control circuit (6) Correct wiring (7) Blown fuse (7) Replace with correct type of fuse (8) Faulty magnetic switch (8) Replace with correct type of magnetic switch (9) Water is not at level indicated by float (9) Raise water level (10) Float is not in appropriate level (10) Move float to an appropriate starting level (11) Float defective (11) Repair or replace (12) Short circuit breaker is functioning (12) Repair location of short circuit (13) Foreign matter clogging pump (13) Remove foreign matter (14) Motor burned out (14) Repair or replace (15) Motor bearing broken (15) Repair or replace
Operates, but stops (1) Prolonged dry operation has activated motor protector (1) Raise stop water level after a while. and caused pump to stop
(2) High liquid temperature has activated motor protector (2) Lower liquid temperature and caused pump to stop
Does not pump. (1) Reverse rotation (1) Correct rotation (see Operation 2, (3)) Inadequate volume. (2) Significant drop in voltage (2) Contact electric power company and devise
counter-measures (3) Operating a 60Hz pump on 50Hz (3) Check nameplate (4) Discharge head is high (4) Recalculate and adjust (5) Large piping loss (5) Recalculate and adjust (6) Low operating water level causes air suction (6) Raise water level or lower pump (7) Leaking from discharge piping (7) Inspect, repair (8) Clogging of discharge piping (8) Remove foreign matter (9) Foreign Matter in suction inlet (9) Remove foreign matter (10) Foreign matter clogging pump (10) Disassemble and remove foreign matter (11) Worn impeller (11) Replace impeller
Over current (1) Unbalanced current and voltage (1) Contact electric power company and devise counter-measure
(2) Significant voltage drop (2) Contact electric power company and devise counter-measure (3) Motor phase malfunction (3) Inspect connections and magnetic switch (4) Operating 50HZ pump on 60Hz (4) Check nameplate (5) Reverse rotation (5) Correct rotation (see Operation 2) (6) Low head; excessive volume of water (6) Replace pump with low head pump (7) Foreign matter clogging pump (7) Disassemble and remove foreign matter (8) Motor bearing is worn or damaged (8) Replace bearing
Pump vibrates; (1) Reverse rotation (1) Correct rotation excessive operating (2) Pump clogged with foreign matter (2) Disassemble and remove foreign matter noise. (3) Piping resonates (3) Improve piping
(4) Gate valve is closed too far (4) Open gate valve
Single phase motor: (1) Defective start capacitor (1) Replace start capacitor. Motor hums, but will not (2) Defective relay: run, over load trips. a) Check relay coil with continuity meter (2a) Replace relay if open coil is found In approximately 15-20 b) Check for loose or broken connection in relay and (2b) If circuit is intact, replace start capacitor and restart motor seconds. After an off start capacitor circuit time of 30-60 seconds, c) If after step (2b) motor fails to start, check with (2c) If no continuity is indicated, replace relay overload protector will continuity indicator across terminal 162 reclose. If motor again (3) Defective motor; if motor fails to start after replacing (3) Check motor for electrical and mechanical defects hums and overload trips, relay (start or run capacitor if used), motor may be the fault is probably due to defective either a defective start capacitor or relay, or perhaps the motor itself.
CALL 1-800-577-8111 FOR SALES AND SUPPORT
Page 9
EBARA Submersible Semi-vortex Sewage Pumps DSU/DSHU
Operating, Installation, and Maintenance
5. Construction
Model DSHU
Hot Water Pumps
1
/
2 to 2HP
PA RT
NO.
001 012
†021
039
048 †111 †115 †117-1 †117-2 †117-3
†117-4
120-1
120-2
130-1
130-2
PART NAME
CASING SUCTION COVER IMPELLER KEY IMPELLER NUT MECHANICAL SEAL O-RING GASKET GASKET GASKET GASKET (MODEL DSU) O-RING (MODEL DSHU) BOLT BOLTS SCREW SCREW
MATERIAL
CAST IRON 304 STAINLESS CAST IRON 420 STAINLESS BRASS
— RUBBER (NBR) PRESS BOARD RUBBER (CR or NBR)
RUBBER (NBR) RUBBER (NBR) 304 STAINLESS 304 STAINLESS 304 STAINLESS 304 STAINLESS
ASTM, AISI
CODE
A48 Class 30 AISI304 A48 Class 30 AISI420 B36 No. 272
AISI304 AISI304 AISI304 AISI304
NO. FOR
1 UNIT
1 1 1 1 1
1 SET
1 1 1 1
1
3 or 4
2 1
3 or 4
PA RT
NO.
193 219 244 801 802
†811
814 816 830 842 848
†849-1
† 849-2
865 915
PART NAME
OIL PLUG COMPANION FLANGE STRAINER ROTOR S TATO R SUBMERSIBLE CABLE MOTOR FRAME BRACKET SHAFT MOTOR COVER MOTOR PROTECTOR BALL BEARING BALL BEARING HANDLE EXTERNAL TERMINAL
MATERIAL
BRASS CAST IRON STEEL
— —
— CAST IRON CAST IRON 403 STAINLESS CAST IRON
— 304 STAINLESS
ASTM, AISI
CODE
B36 No. 272 A48 Class 30 A283 Grade D
A48 Class 30 A48 Class 30 AISI403 A48 Class 30
AISI304
NO. FOR
1 UNIT
1 1 1 1 1 1 1 1 1 1 1 1 1 1
1~2
†: Recommended spare parts.
Motors purchased as a complete unit.
CALL 1-800-577-8111 FOR SALES AND SUPPORT
Page 10
EBARA Submersible Semi-vortex Sewage Pumps DSU/DSHU
Operating, Installation, and Maintenance
Model DSU
3 to 10HP
Model DSHU
Hot Water Pumps 3 to 5HP
PA RT
NO.
001 005 012
†021
039
080 †107 †111 †115-1 †115-2 †115-3 †117-1 †117-2 †117-3 †117-4
120-1
120-2
120-3
120-4
125
PART NAME
CASING INTERMEDIATE CASING SUCTION COVER IMPELLER KEY BUSHING WEARING RING MECHANICAL SEAL O-RING O-RING O-RING GASKET GASKET GASKET GASKET BOLT BOLT BOLT BOLT BOLT
MATERIAL
CAST IRON CAST IRON CAST IRON DUCTILE IRON 420 STAINLESS STEEL 304 STAINLESS
— RUBBER (NBR) RUBBER (NBR) RUBBER (NBR) PRESS BOARD
RUBBER (NBR) 304 STAINLESS 304 STAINLESS 304 STAINLESS 304 STAINLESS 304 STAINLESS
ASTM, AISI
CODE
A48 Class 30 A48 Class 30 A48 Class 30 A536 GR60-40-18 AISI420 A283 Grade D AISI 304
AISI304 AISI304 AISI304 AISI304 AISI304
NO. FOR
1 UNIT
1 1 1 1 1 1 1
1 SET
1
1 or 2
1 1 1 1 1 4 4 4 2 1
PA RT
NO.
130 135 174 193 200 244 277 801 802
†811
814 816 817 830 842
848 †849-1 †849-2
915
PART NAME
SCREW WASHER DISCHARGE ELBOW OIL PLUG LIFTING HANGER STRAINER “V” RING ROTOR S TATO R SUBMERSIBLE CABLE MOTOR FRAME BRACKET BRACKET SHAFT MOTOR COVER MOTOR PROTECTOR BALL BEARING BALL BEARING EXTERNAL TERMINAL
MATERIAL
304 STAINLESS 304 STAINLESS CAST IRON BRASS STEEL STEEL RUBBER (NBR)
— —
— CAST IRON CAST IRON CAST IRON 403 STAINLESS CAST IRON
ASTM, AISI
CODE
AISI304 AISI304 A48 Class 30 B36 No. 272 A283 Grade D A283 Grade D
A48 Class 30 A48 Class 30 A48 Class 30 AISI403 A48 Class 30
NO. FOR
1 UNIT
2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
†: Recommended spare parts.
71/2, 10HP
3 to 5HP
Motors purchased as a complete unit. Parts No. 915 is not installed for Model DSHU. Parts No. 117-4 is not installed, No. 115-2 is installed 2 pcs. for 7
1
/2 -10HP.
CALL 1-800-577-8111 FOR SALES AND SUPPORT
Page 11
EBARA Submersible Semi-vortex Sewage Pumps DSU/DSHU
Operating, Installation, and Maintenance
Maintenance and Service
6. Disassembly and Assembly:
Please contact the following for assistance:
EBARA Fluid Handling Customer Service Manager 1651 Cedar Line Drive Rock Hill, South Carolina 29730
Other
1. All specifications subject to change without notice
2. Limited warranty:
EIC warrants for a period of twelve months from the date of initial startup or eighteen months from the date of shipment, whichever shall first occur (the "Warranty Period") the EIC Products to be delivered hereunder against defects in material and workmanship, under normal use and service when installed, used and maintained in accordance with instructions supplied by EIC. This is EIC's sole and exclusive warranty. It applies only to EIC Products and specifically excludes Other Equipment, whether or not such Other Equipment is included in EIC's scope of supply hereunder. Such Other Equipment is warranted only by its manufacturer. If such a defect appears in EIC Products within the Warranty Period and Purchaser has given EIC immediate written notice of same, EIC will either repair the part, or at its option replace the part, by shipping a similar part F.O.B. EIC's shipping point, or at its option refund an equitable portion of the purchase price. EIC may require the return of the defective part, transportation prepaid, to establish the claim. All costs of removal, reinstallation, field labor and transportation shall be borne by the Purchaser. No allowance will be made for repairs without EIC's written consent or approval, and the Warranty Period shall not be suspended upon stopping operation for warranty repairs, nor recommence upon completion of the warranty repairs, but shall run continuously from commencement until normal expiration. Repair parts shall carry no greater warranty than the remaining balance of the underlying EIC Product into which they may be installed, expiring at the same time as said underlying warranty.
Any descriptions of the EIC Products or Other Equipment, any specifications, and any samples, models, bulletins, or similar material used in connection with this sale are for the sole purpose of identifying the said Equipment and are not to be construed as express or implied warranties. Unless during the warranty period all repairs or replacements or parts or components for EIC Products are with EIC-approved parts or components, and all warranty service is performed by EIC or its authorized distributor or representative, the warranty responsibility of EIC shall immediately terminate.
EIC MAKES NO OTHER WARRANTY OF ANY KIND WHATSOEVER, EXPRESS OR IMPLIED; AND ALL WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE ARE HEREBY DISCLAIMED BY EIC AND EXCLUDED FROM THESE CONDITIONS. The Purchaser's sole and exclusive remedy, whether upon warranty, contract or tort, including negligence, will be to proceed under this warranty. All liability of EIC shall terminate no later than the expiration of the Warranty Period.
CAUTION
All service should be done by factory trained or qualified personnel only. Be sure to cut off power source before beginning disassembly.
CALL 1-800-577-8111 FOR SALES AND SUPPORT
Page 12
Contact your dealer or supplier
for more information about other EBARA products:
CALL 1-800-577-8111 FOR SALES AND SUPPORT
Loading...