Eaton Zeta 3, Zetalite 3 Installation Instructions Manual

4
2
1
3
Installation Instructions for:
Zeta 3
IP65
Product luminaires comply with EN60598 and are suitable for use in normal interior/exterior conditions.
o o
Cable Entry
NOTE: If the fitting is required to be IP65 rated, ensure a suitable IP65 rated cable gland is used to seal cable entry. For BESA entry or fixing points, fit to a flat surface. Sealant or suitable sealing washers should be applied around fixing screw heads to maintain the ingress protection of the luminaire.
Cable Entry with
Besa entry available
Cable Entry
Cable Entry
Optional Gasket
If fitting is required to be IP65 rated, ensure gasket is fitted around outside groove. If not required, please discard.
Fitting the Legend (Ordered separately)
Self adhesive legends can be fitted to the front face, use soapy water to position correctly.
Take base of fitting, knock through the preferred cable entry point. Note: Centre cable entry requires drilling. Using the hexagonal pattern, knock out suitable points and mount to fixing surface, if wall mounted ensure battery clips are at the bottom of the fitting
Using a screwdriver, release 4 x clips and remove transparent lid. Remove the battery and gasket from the base.
Clip battery back into position
Feed mains cable through cable entry and wire the PCB on the lid as per below, connect the battery lead to the PCB
Refit lid on to the base, ensuring the capacitors are the opposite side to the battery in the base. Ensure tabs are fully fastened to ensure IP rating
Zeta 3 can be operated in Maintained or Non-Maintained mode by cutting or removing the link on the PCB.
Note: There is 'no' switched input supply to the luminaire and therefore cannot be remotely switched between maintained and non-maintained operation.
Link Wire
Terminal Block: L - Live (Brown) N - Neutral (Blue)
Wiring
ENSURE ALL 4 CLIPS ARE RELEASED,
FORCING OPEN WITH ONLY 2 CLIPS
OPEN WILL DAMAGE THE OTHER CLIPS
K983V4
IMPORTANT NOTE:
Luminaire battery MUST NOT be connected until building has a permanent un-switched live supply.Repeated full discharges caused by fully removing power to luminaires with connected batteries (i.e. a nightly building power
down prior to hand over) will permanently damage the battery and invalidate any warranty.
Testing Maintained:
The unit should be connected to an unswitched live supply, which should be connected to the normal lighting sub-circuit in that location. The LED indication should be checked to ensure that it is illuminated, this indicates that the batteries are charging. A short discharge should be performed to check that the units are operating correctly. This is carried out by interrupting the unswitched supply at the distribution board or by isolating the appropriate unswitched supply sub-circuit. The supply should then be restored and the LED indication checked. After 24hrs carry out a full rated discharge test. The testing regime as defined in EN 50172 should then be implemented. Alternatively, Self-Check products carry out a full rated duration test after 36 hours automatically and then preform automated tests to EN50172. See leaflet K1037 for further details. If the unit no longer meets the emergency duration the battery must be replaced with a battery of the same type. When used as intended this product complies with the EMC Directive 2004/108/EC and Low Voltage Directive 2012/19/EU. Date of commissioning to be entered in the space provided on the battery label by either the installer or commissioning engineer.
Safe Operation
1. Check the rating label for voltage and frequency before connecting this luminaire to the electrical supply.
2. Ensure that the mains supply is switched off when working on this luminaire, whether installing or carrying out any other servicing.
3. To prevent damage to driver, do not mix with conventional magnetic ballasts on the same electrical circuit.
4. Where use in more onerous situations is required, e.g. In part-completed buildings before “drying-out” is completed, or areas where ambient temperatures are outside the normal temperature range, then consult our Sales Office.
5. The light source contained in this luminaire shall only be replaced by the manufacturer or his service agent or a similar qualified person
Servicing and Disposal
1. At commissioning and handing over of installation ensure that a copy of these instructions is presented to the authority responsible for the operation and maintenance of the luminaries.
2. Servicing, e.g. cleaning, must only be carried out after the electricity supply has been switched off. It must not be assumed that luminaries with lamps not lit are switched off-always check before servicing.
3. Cleaning should be carried out at regular intervals to ensure that dirt does not accumulate to an extent that will impair the thermal safety or optical performance of the luminaire. Regular cleaning will also ensure that the optical performance of the luminaries is maintained.
4. Avoid touching the LED array surface. To clean - Blow surface with either dry air or nitrogen gas.
5. At the end of life the luminaire is classed as WEEE under directive 2002/96/EC and should be disposed of in accordance with local legislation.
Luminaire Cleaning
End of Life and Components Disposal
WEEE