Eaton IB00414001Y User Manual

Instruction Bulletin IB00414001Y
Effective January 2015 Supersedes March 2012 CHSPT2
Complete Home Surge Protection
Parasurtenseur Complet Résidentiel CHSP Protección Total Contra Sobretensiones para el Hogar
Contents
Description Page
Installation and Operating Guide . . . . . . . . . . . . . . 2
Mounting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
Pre-Installation . . . . . . . . . . . . . . . . . . . . . . . . . . 2
Circuit Breaker Installation . . . . . . . . . . . . . . . . . 2
Indoor Installation . . . . . . . . . . . . . . . . . . . . . . . . 2
Panel Mount . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
Surface Mount . . . . . . . . . . . . . . . . . . . . . . . . . . 2
Finished Wall (Flush Mount) . . . . . . . . . . . . . . . 3
Outdoor Installation . . . . . . . . . . . . . . . . . . . . . . 3
Wiring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
Operations / Troubleshooting . . . . . . . . . . . . . . . . 3
Instructions d’installation et d’emploi . . . . . . . . . . 3
Montage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
Avant l’installation . . . . . . . . . . . . . . . . . . . . . . . 4
Installation du Disjoncteur . . . . . . . . . . . . . . . . . 4
Installation à l’intérieur du Bâtiment . . . . . . . . .5
Montage sur Tableau . . . . . . . . . . . . . . . . . . . . . 5
Montage en Surface . . . . . . . . . . . . . . . . . . . . . 5
Montage sur mur Fini (Montage Encastré) . . . . 5
IInstallation à l’extérieur du Bâtiment . . . . . . . .5
Câblage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5
Utilisation / Réparations . . . . . . . . . . . . . . . . . . . . 6
Guía de Instalación y Operación . . . . . . . . . . . . . . 6
Montaje . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6
Antes de la Instalación . . . . . . . . . . . . . . . . . . . . 6
Instalación del Interruptor Automático . . . . . . . . 7
Instalación Interior . . . . . . . . . . . . . . . . . . . . . . . 7
Montaje del Panel . . . . . . . . . . . . . . . . . . . . . . . 7
Montaje en Superficie . . . . . . . . . . . . . . . . . . . . 7
Pared con Acabado (Empotrado) . . . . . . . . . . . . 7
Instalación Exterior . . . . . . . . . . . . . . . . . . . . . . . 7
Cableado . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7
Operaciones / Solución de Problemas . . . . . . . . . 7
Instruction Bulletin IB00414001Y
Effective January 2015
Complete Home Surge Protection
Installation and Operating Guide
Thank you for purchasing an Eaton® Complete Home Surge Protective (CHSP) device. This product forms part of the CHSP modular surge protection system, consisting of:
The CHSPT2SURGE or CHSPT2ULTRA AC module, designed to protect residential electrical and electronic loads from voltage transients and surge disturbances on your AC power line and intended for both indoor and outdoor usage.
The CHSPCABLE module, designed to protect coaxial cables providing service for televisions, satellite TV and other coaxial connected equipment from electrical transients and surge disturbances and intended for indoor use only. Outdoor installations require a separately purchased outdoor enclosure (accessory: CHSP3RTELCABLE).
The Eaton system is designed for maximum installation flexibility in newly constructed or existing homes. For example, in new construction, when coaxial cables are routed close to the electrical panel, the CHSP modules can be joined together using the unique quick-connect feature found on each protection module, for a neatly configured surge protection system (see Figures 8, 9, and 10).
These instructions do not cover all details, variations, or combinations of the equipment, its storage, delivery, installation, checkout, safe operation, or maintenance. If you require further information regarding a particular application or installation that is not covered in this manual, please contact Eaton’s Technical Resource Center at 1-877-ETN-CARE, option 2, then option 1.
Safety Precautions
A licensed / qualified electrician must complete all instructions described in this manual in accordance with the U.S. National Electrical Code, state and local codes, or other applicable country codes. All electrical codes supersede these instructions.
WARNING! SHOCK HAZARDS
Improper installation can cause death, injury and /or equipment damage. Follow all warning and cautions.Completely
read and understand the information in this instruction manual before attempting to install or operate this equipment.
Improper wiring could cause death, injury, and / or equipment damage. Only licensed / qualified electricians who are trained in the
installation and service of electrical devices are to install and service this equipment.
Use appropriate safety precautions and equipment for arc flash protection.
During normal operation, hazardous voltages are present inside the SPD.
When servicing the SPD, follow all safe work practices to avoid electrical shock.
CAUTION
Do not perform a high-pot test with the SPD connected to the electrical system. Failure to disconnect the SPD during a high-pot
test will result in damage to the SPD.
IMPORTANT
Choose a mounting location for the CHSP that provides the shortest and straightest possible wiring (lead length) from the CHSP to the electrical system connections. Excessive lead length and sharp bends will degrade the performance.
When using conduit, avoid using 90º elbows and keep the conduit run as short and straight as possible.
Mounting
The CHSPT2SURGE/CHSPT2ULTRA is designed to be connected to the top, bottom or sides of your electrical loadcenter, see Figure 1, or alternatively it can be surface mounted or flush mounted on the wall adjacent to the loadcenter.
Definition: The term loadcenter refers to the electrical panel
(or breaker panel) in your home. To install this device you need:
Four self-tapping screws — #8 x 3/4-inch (1.9 cm) (surface mount only — supplied with purchase).
Slot and Phillips screwdriver.
Hammer, wire cutter and wire stripper.
For finished wall applications, you should purchase the Flush Mount lid (accessory: CHSPFMKIT)
Pre-Installation
The loadcenter must be properly grounded and meet local, nation­al (NEC®) or Canadian (CEC) electrical code approved practices.
The CHSP can be used with any manufacturer’s loadcenter (breaker panel).
Circuit Breaker Installation
1. Turn OFF power to the loadcenter.
2. Remove loadcenter cover.
3. Verify power has been disconnected with a portable voltage meter.
4. Locate a dedicated unused, or install a new 2-pole circuit breaker in an available space closest to the location where the CHSP is to be installed. A dedicated 2-pole 15 ampere circuit breaker is recommended for use with CHSP devices, but use a 2-pole 50 ampere circuit breaker to achieve the full published ratings of the CHSPT2ULTRA device. (The connecting wires do not carry supply current. Instead, they carry only short-duration currents that are associated with a transient event.)
5. Move circuit breaker handle to the OFF position.
Indoor Installation
Table 1. Recommended Dedicated Circuit Breaker to Achieve Published Rating
Catalog Number Pole Rating
CHSPT2SURGE 2-Pole 15 ampere
CHSPT2ULTRA 2-Pole 50 ampere
Panel Mount (Figures 1 and 2)
6. Remove 1/2-inch (1.25 cm) knockout located closest to the
2-pole breaker installed in Step 4.
7. Remove lock nut from the threaded nipple and feed the CHSP
wires through the knockout. Secure the CHSP in its final position by reattaching lock nut and tighten firmly using hammer and screwdriver or suitable wrench. Continue with final installation Step 11.
Surface Mount
8. Using the supplied four (4) self-tapping screws, mount the
CHSP on a suitable surface through the four mounting holes. The wires should be protected using rigid or flexible Electrical Metal Tubing. Continue with final installation Step 11.
2
EATON CORPORATION www.eaton.com
Complete Home Surge Protection
Instruction Bulletin IB00414001Y
Effective January 2015
Finished Wall (Flush Mount) (Figure 3)
9. Attach the CHSP either by Panel Mount or Surface Mount, and attach the optional Flush Mount lid on the surface of the CHSP.
10. Install the supplied two 4-40 mounting screws to firmly secure the Flush Mount lid. Continue with final installation Step 11.
Outdoor Installation (Figures 4 and 5)
11. Use only a raintight rated coupling and conduit, made from corrosion resistant material, to connect the CHSP to the outdoor loadcenter.
IMPORTANT
Be sure to follow all U.S. National Electrical Code, state, and local codes, or other applicable country codes.
To avoid fire, shock, or death, turn OFF power at circuit breaker or fuse and test that power is OFF before wiring.
When connecting the wires from the CHSP to the electrical system, cut the wires as necessary to keep them as short as possible - 12 inches (30 cm) or less is recommended.
To maximize the CHSP’s performance, twist and bind the wires together to reduce the impedance of the wire (one twist / inch).
Wiring the CHSPT2SURGE/CHSPT2ULTRA (Figures 1 and 6)
12. Use care in stripping insulation from the conductors. Cut off any excess wire and strip approximately 1/2-inch (1.25 cm) from all four wires.
13. Connect the White wire to the neutral bus bar.
14. Connect the Green wire to the ground bus bar.
15. Connect the Black and Red wire to the 2-pole circuit breaker installed in Step 4. Connect the Black wire to one terminal and the Red wire to the other terminal. Do not install both wires
on the same terminal.
16. Check that all connections are correct (refer to wiring diagram Figure 6).
Figure 1. Panel Mount Installation (1)/Installation au panneau (1) (1)/Instalación en el centro de cargo
17. Replace loadcenter cover.
18. Restore electrical power. Switch main breaker to ON position.
19. Reset the 2-pole circuit breaker supplying power to the CHSP to the ON position. The LED indicator lights should illuminate. Note: If the 2-pole circuit breaker supplying power to the CHSP trips, replace the unit.
Operations / Troubleshooting
Power Up and System Checkout
Apply system power. The LED should light. If the connected LED does not light, remove power, check connec-
tions, and test again. If the LED still does not light, contact Eaton’s Technical Resource Center at 1-877-ETN-CARE, option 2, then option 1.
Routine Operation
After system power has been applied, the CHSP automatically begins to protect downstream electrical devices from damaging voltage transients.
With all phase voltages present, the LED indicator reports the status of the protection elements and is active when all of them are intact and providing protection. Any loss of protection is signaled when the LED extinguishes.
The device is not repairable and contains no user serviceable parts. If the unit fails, as evidenced by the LED turning OFF, the unit must be replaced.
Instructions d’installation et d’emploi
Merci de votre achat d’un parasurtenseur complet résidentiel CHSP Eaton®. Ce produit fait partie du système parasurtenseur modulaire CHSP comprenant les éléments suivants:
Le module CA CHSPT2SURGE ou CHSPT2ULTRA, conçu pour protéger les charges électroniques et électriques résidentielles des courants transitoires et des surtensions sur la ligne de courant alternatif. Ce module est destiné à un usage à la fois intérieur et extérieur.
Le module CHSPCABLE de protection des câbles coaxiaux de télévision, de télévision par satellite et autres appareils à câbles coaxiaux contre les courants transitoires et les surtensions. Ce module est à usage intérieur seulement. Les installations en extérieur nécessitent un boîtier extérieur à acheter séparément (accessoire CHSP3RTELCABLE).
Le système Eaton est conçu pour être facilement installé dans les maisons nouvellement construites comme plus anciennes. Par exemple, dans la construction neuve, lorsque les câbles coaxiaux sont acheminés à proximité du tableau électrique, les modules CHSP peuvent être assemblés en utilisant la caractéristique unique de connexion rapide trouvé sur chaque module de protection, pour un système de protection contre les surtensions parfaitement con­figuré (voir les figures 8, 9, et 10).
Ces instructions ne recouvrent pas tous les détails sur le parasur­tenseur concernant les variations et combinaisons, l’entreposage, l’intensité de courant, l’installation, la vérification, l’entretien ou l’utilisation sécuritaire. Si vous avez besoin d’un complément d’information au sujet d’une application ou d’une installation particu­lière qui n’est pas expliquée dans cette notice d’emploi, veuillez com­muniquer avec le Technical Resource Center (Centre des ressources techniques) d’Eaton en composant le 1-877-ETN-CARE, option 2, puis option 1.
Figure 2. Panel Mount Installation (2)/Installation au panneau (2) (2)/Instalación en el centro de carga
EATON CORPORATION www.eaton.com
3